ECB11/09/200960X10.40O2.57Q7.12Q3.68M7.70O2 REMOVE WATER FROM THE PIT 57Q7 PROVIDE COVERS FOR HOIST MOTOR ELECTRICAL BOXES 100M7PROVIDE COVERS FOR ELECTRICAL BOXES INSIDE THE CAR 100M072 PROVIDE FIRE EXTIGUISHER IN M/RNothing owed — awaiting certificate of correction
ECB02/13/2009FAILURE TO COPY W/COMM'S ORDER TO CORRECT VIO#34236478L FOR WORK W/O PERMIT @ FLRS #2-5 & ALL CONDITIONS NOTED ON VIOLATION. NO RECORD OF CORRECTION. REMEDY: COMPLY W/COMM'S ORDER & OBTAIN PERMIT.Nothing owed — awaiting certificate of correction
ECB05/27/2008FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO CORRECT VIO#34236478L FOR WORK W/O PERMIT AT 2ND FLR + 5TH FLR NO RECORD OF CORRECTION. REMEDY: COMPLY WITH COMM'S ORDER + OBTAIN PERMIT.Nothing owed — awaiting certificate of correction
ECB12/27/2007FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER TO COORECT THE CONDITION IN NOV 34236478L LOCATION 2 AND 5 FL FULL HEIGHT PARTITION WALLNO RECORDS OF CORRECTION IN THE BLDG DEPT RECORDS NO ACCESS REMEDY:Nothing owed — awaiting certificate of correction
ECB08/23/2007FAILURE TO COMPLY W/AN ORDER OF THE DEPT TO CORRECT VIO #34236478L FORWORK W/O PERMIT. NO PERMITS. REMEDY: COMPLY W/DEPT. ORDER & OBTAIN PERMIT.Nothing owed — awaiting certificate of correction
ECB08/18/2007FAILURE TO MAINTAIN: DEFECT IS: AT BASEMENT LEVEL WOODEN FLOOR JOIST WHICH SUPPORTS THE FIRST FLOOR HAS BECOME DISLODGED FROM WOODEN GIRDER & HAS DROPPED APPROX. 6" WHICH HAS CAUSED THE 1ST FLOOR TO ALSO DROPNothing owed — awaiting certificate of correction
ECB04/06/2007FAILURE TO COMPLY W/ AN ORDER OF THE DEPT TO CORRECT VIO #34236478L FOR WORK W/O PERMIT. REMEDY:COMPLY W/ DEPT ORDER & OBTAIN PERMIT.Nothing owed — awaiting certificate of correction
ECB01/17/2007FAILURE TO PROVIDE AT LEAST 2 MEANS OF EGRESS FROM RM OR SPACE AS REQUIRED NOTE:INSTALLATION OF ILLEGAL PARTITIONS THROUGH CENTER OF 2ND FLRTO BE W/O 2 MEANS OF EGRESS &FIRE ESCAPE ON SOUTH SIDE TO BE NOTNothing owed — awaiting certificate of correction
ECB01/17/2007OCCUPANCY CONTRARY TO DOB RECORDS WHICH INDICATE LEGAL FACTORY/INDUSTRIAL USE,MON 2ND FLR DIVIDED & ARRANGED ARTIST STUDIOS W/O PERMITS OR APPROVALS/PHOTOS/REMEDY:DISCONTINUE ILLEGAL OCCUPANCY OR OBTAIN NEWNothing owed — awaiting certificate of correction
ECB01/17/2007FAILURE TO MAINTAIN NOTE:LARGE METAL CHIMNEY/FLU ON SOUTH SIDE OF BLDGIS IN DISREPAIR W/ROTTED OPEN & MISSING METAL SECTION AT ELBOW,WHICH ARE/PHOTO/LOOSE & UNSECURED.REMEDY:MAINTAIN BLDG & MAKE SAFE.Nothing owed — awaiting certificate of correction
ECB01/17/2007FAILURE TO COMPLY W/AN ORDER OF THE DEPT TO CORRECT VIO#342364782 FOR WORK W/O PERMIT ON 2ND FLR ERECTED PARTITIONS & DIVIDED SPACE REMEDY: COMPLY W/DEPT ORDER & OBTAIN PERMIT.Nothing owed — awaiting certificate of correction
ECB08/01/2006FAILURE TO COMPLY W/ THE COMMISSIONERS ORDER TO CERTIFY/ CORRECT NOV #34236478L. NOTED: 2ND FL REAR ERECTED FULL HEIGHT PARTITION WALLS TO CREATE 7 ART STUDIOS & STORAGE RM FOR COMPUTERS W/ 2 DEMISING WALLS.Nothing owed — awaiting certificate of correction
ECB08/01/2006OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS. ILLEGAL OCCUPANCY NOTED: 2ND FL LEGAL FACTORY/ INDUSTRIAL NOW CONVERTED REAR INTO SEVEN ART STUDIOS.REMEDY:DISCONTINUE ILLEGAL USE OR AMEND C OFONothing owed — awaiting certificate of correction
ECB04/26/2005CEASE USE/HAZARDOUS. 60I11/44H11/12I10/05I10/39O02/48L10/46I10/36H11/41A10/83O02/05I10/85M05. 60-ONE LEG OF 3 PHASE DISCONNECT TOTALLY BY PASSED. 46-BROKEN TEETH ON DRUM SHEAVE. 41-CONTROLLER OPERATES W/O DESTINothing owed — awaiting certificate of correction
ECB06/25/2001FAILURE TO MAINTAIN BUILDING;IN THAT APPROXIMATE 20"DIAMETER METAL AIR VENT ON BRACKET SUPPORTING VENT BROKEN AND SEPARATELY FROM MASONRY WALL.VENT IS OVER HEAD OF FIRE ESCAPE.REMEDY:PROVIDE OVERHEAD PROTECTIONNothing owed — awaiting certificate of correction
ECB02/05/2000OCCUPANCY CONTRARY TO THAT OF THE BUILDING DEPARTMENT RECORDS. ILLEGALOCCUPANCY NOTED IN REAR OF THIRD FLOOR ERECTED FULL HEIGHT PARITIONS CREATING A PHOTO WITH THREE PIECE BATHROOM AND THREE LARGE ROOMS. ANNothing owed — awaiting certificate of correction
ECB01/24/2000OCCUPANCY CONTRARY TO THAT OF THE BLDG. DEPT. RECORD(S). ILLEGAL OCCU-PANCY NOTED: HEAVY INDUSTRIAL BUILDING CONVERTED TO MULTI USE. NOTE: AT FIFTH FLOOR ERECTED FULL HEIGHT PARTITION WALLS CREATING 6 ENCLOSEDNothing owed — awaiting certificate of correction
ECB01/24/2000WORK WITHOUT A PERMIT. WORK NOTED: AT 2ND FLOOR LEVEL FULL HEIGHT PARTITION WALLS ERECTED CREATING ART STUDIOS AND PHOTOGRAPHY STUDIOS. NOTE: SHOWER INSTALLED: NOTE: AT 5TH FLOOR LEVEL FULL PARTITION WALLSNothing owed — awaiting certificate of correction
ECB05/17/1994EXIT LIGHTING DEFECTIVE / FAILS TO MEET BUILDING CODE STANDARDS - BULBS SIGNS & DIRECTIONAL SIGNS - MISSING BROKEN THROUGHOUT ALL FLOORS REMEDY: REPAIR OR REPLACENothing owed — awaiting certificate of correction
ECB01/02/199158O,17I.Nothing owed — awaiting certificate of correction
ECB09/12/1988WORK WITHOUT A PERMIT. WORK NOTED: TWO SPRAY BOOTHS INSTALLED WITHOUT A PERMIT. EXIT LIGHTING FAILS TO MEET BLDG. CODE REQUIREMENT REMEDY: INSTALL EXIT LIGHTS PER CODE.Nothing owed — awaiting certificate of correction
ECB09/12/1988EXIT LIGHTING FAILS TO MEET BLDG. CODE STANDARDS FRONT, REAR+SIDE EXIT DOOR SHOULD HAVE LIGHTED SIGNS. REMEDY: INSTALL EXIT LIGHTS FOR CODENothing owed — awaiting certificate of correction
Factory, heavy manufacturing, fireproof · Owner of record: 40-21 CORNERS, LLC · 16,700 sf lot · 2.92 FAR built · Flood zone X500