← Back
Primarily 2 family with 1 store or office
40-34 JUNCTION BOULEVARD
QUEENS · BIN 4039848
💬 Discuss this project
1968Year Built
3Stories
S2Building Class
R6BZoning
3,560 sfGross Floor Area
3Units
2 Open Violations ▸
Primarily 2 family with 1 store or office · Owner of record: JJ NILE LLC · 2,020 sf lot · 1.76 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Floor 37p · 1 filing · 20 docs
Floor 27p · 2 filings · 20 docs
Floor 15p · 1 filing · 20 docs
Cellar6p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/06/2015$1.4M—Private party → JJ NILE LLC$393/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GRUPO DESIGN304/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CARLOS RAMIREZ303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
T.N. LANDSCAPING CONSTRGeneral Contractor303/21/2026
BT'S PLUMBING AND HEATINGPlumbing107/08/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GIOVANNI ZAPATA R.A.3882304/28/2022
Building Lifecycle
All (43)Filed (3)Permit Issued (3)Signed Off (1)Violation (19)Inspection (8)Objection (2)Special Inspection (7)
07/24/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/19/2022
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION I INTERIOR RENOVATION AND CONVERSION OF MEDICAL OFFICE TO DWELLING UNIT, PLUMBING WORK AS SHOWN ON PLANS FOR DWELLING UNIT, CHANGE CURRENT CERTIFICATE OF OCCUPANCY.
Q00537864-I1
12/08/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/08/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/29/2022
Permit issued — Plumbing
Q00537864-I1-PL
11/17/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/11/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/08/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/23/2022
Permit issued — Plumbing
Q00537864-I1-PL
05/17/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/11/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/28/2022
Filed — Alteration
PLUMBING WORK IN CONJUNCTION I INTERIOR RENOVATION AND CONVERSION OF MEDICAL OFFICE TO DWELLING UNIT, PLUMBING WORK AS SHOWN ON PLANS FOR DWELLING UNIT, CHANGE CURRENT CERTIFICATE OF OCCUPANCY.
Q00537864-I1
03/25/2022
Permit issued — General Construction
Q00494397-I1-GC
02/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIOVANNI ZAPATA
02/08/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
GIOVANNI ZAPATA
02/08/2022
Special inspection requirement — Fire-Resistance Rated Construction
GIOVANNI ZAPATA
02/08/2022
Special inspection requirement — Lighting in dwelling units
GIOVANNI ZAPATA
02/08/2022
Special inspection requirement — Fenestration air leakage
GIOVANNI ZAPATA
02/08/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
GIOVANNI ZAPATA
02/03/2022
Objection resolved — Addressed
01/25/2022
Objection raised — Admin
01/20/2022
Filed — Alteration CO
PROPOSE CHANGE OF MEDICAL OFFICE AT 2ND FLR AS PER CO 402430856F TO A DWELLING UNIT. INTERIOR RENOVATION OF 2ND FLR PATCHING WALLS AND FLOORING AS PER PLANS NEW CO WILL BE ISSUE
Q00494397-P1
06/10/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIOVANNI ZAPATA
05/13/2021
Filed — Alteration CO
PROPOSE CHANGE OF MEDICAL OFFICE AT 2ND FLR AS PER CO 402430856F TO A DWELLING UNIT. INTERIOR RENOVATION OF 2ND FLR PATCHING WALLS AND FLOORING AS PER PLANS NEW CO WILL BE ISSUE
Q00494397-I1
09/16/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/05/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/27/2012
Violation issued (ECB, closed)
Boilers
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/08/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/21/2007
Violation issued (ECB, closed)
Quality of Life
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/29/2006
Violation issued (ECB, closed)
Quality of Life
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/24/2003
Violation issued (ECB, closed)
Unknown
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC11/29/2022
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING06/23/2022
DOB NOWGeneral ConstructionPermit IssuedT.N. LANDSCAPING CONSTR03/25/2022
BIS—ISSUEDVIKING CARPENTRY CORP08/22/2007
BISEQISSUEDVIKING CARPENTRY CORP08/22/2007
BISMHISSUEDVIKING INTERIOR CORP05/25/2007
BISPLISSUEDCITY TESTING & PLUMBING I09/27/2006
BISEQISSUEDVIKING CARPENTRY CORP09/27/2006
BIS—ISSUEDVIKING CARPENTRY CORP09/27/2006
BISOTISSUEDAFAEL CONSTRCTION04/14/2004
1 project · most recent 04/23/2022
General Wiring
FiledStatusContractorScope
04/23/2022CompleteACE ELEC'L CONSTRUCTIONGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/24/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/08/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/08/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/11/2022Pass-Final CND-Occupancy InspectionPassView ↗
07/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/17/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/11/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
02/08/2022Fire-Resistant Penetrations and JointsGIOVANNI ZAPATAspecial
02/08/2022Structural Stability – Alterations of existing buildingsGIOVANNI ZAPATAspecial
02/08/2022Fire-Resistance Rated ConstructionGIOVANNI ZAPATAprogress
02/08/2022Lighting in dwelling unitsGIOVANNI ZAPATAenergy_progress
02/08/2022Fenestration air leakageGIOVANNI ZAPATAenergy_progress
02/08/2022Fenestration and door U-factor and product ratingsGIOVANNI ZAPATAenergy_progress
06/10/2021Fire-Resistant Penetrations and JointsGIOVANNI ZAPATAspecial
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00494397-P2Request digital key ↗
08/26/2026Q00494397-I1Request digital key ↗
08/26/2026Q00537864-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00494397-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature8
08/27/2026Q00494397-I1Open ↗
08/27/2026Q00494397-I1Open ↗
08/27/2026Q00494397-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/27/2026Q00494397-I1Open ↗
08/27/2026Q00494397-I1Open ↗
08/26/2026Q00537864-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00537864-I1Open ↗
08/13/2026Q00494397-P1Open ↗
08/13/2026Q00494397-P2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00494397-P2Open ↗
08/13/2026Q00494397-I1Open ↗
08/13/2026Q00494397-P1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00494397-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00494397-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00494397-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026Q00537864-I1Open ↗
08/13/2026Q00494397-P2Open ↗
08/13/2026Q00494397-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00494397-I1Open ↗
▸Other Documents1
▸DOB NOWFinal Survey1
08/13/2026Q00494397-I1Open ↗