Factory, heavy manufacturing, fireproof
40-35 22ND STREET
QUEENS · BIN 4311314
💬 Discuss this project
1922Year Built
3Stories
F1Building Class
M1-5AZoning
48,000 sfGross Floor Area
1Units
LL97 Covered0 Active ViolationsFDNY Report ↗
Factory, heavy manufacturing, fireproof · Owner of record: Dewa 22nd Street · 17,500 sf lot · 2.74 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofAir Sea Packing16p · 1 filing · 20 docs
Floor 3Air Sea Packing14p · 1 filing · 20 docs
Floor 2Air Sea Packing65p · 1 filing · 20 docs
Floor 1Air Sea Packing75p · 2 filings · 20 docs
Site & exteriorAir-sea Packing GroupUnder Construction1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Air Sea Packing Group4907/08/2026
Starplus Construction203/21/2026
Dewa 22nd St103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Zirinsky Architecture301/06/2026
Gabor Szakal Consulting Engineers1010/21/2024
Ring Consulting Group202/02/2023
Enthink Engineers104/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Leslie McKenzie303/21/2026
Zirinsky Architecture2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KeybuildersGeneral Contractor507/08/2026
Capitol Fire Sprinkler CoFire Protection207/08/2026
RE-Brick ConstructionScaffold107/08/2026
Amm General ContractingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C.M. Testing Laboratory1352101/06/2026
Whitestone Associates Engineering8144910/21/2024
Zirinsky Architecture13101110/21/2024
Building Lifecycle
All (128)Filed (15)Permit Issued (8)Signed Off (6)Violation (51)Inspection (8)Objection (10)Special Inspection (30)
03/09/2026
Permit issued — General Construction
Q01334333-I1-GC
02/10/2026
Objection resolved — Addressed
01/22/2026
Objection raised — Scope
01/06/2026
Filed — Alteration
New masonry wall at side yard
Q01334333-I1
12/15/2025
Special inspection requirement — Final
Steven Zirinsky
12/15/2025
Special inspection requirement — Masonry
JOHN SEMIOLI
11/25/2024
Signed off — Alteration
Modify sprinkler system for offices
Q00679260-S3
11/25/2024
Signed off — Alteration
Modify sprinkler system for offices
Q00679260-I1
11/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Zirinsky
11/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
Mudar Khantamr
11/01/2024
Special inspection requirement — Ventilation and air distribution system
Mudar Khantamr
11/01/2024
Special inspection requirement — Mechanical Systems
Mudar Khantamr
11/01/2024
Special inspection requirement — Final
Steven Zirinsky
11/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Mudar Khantamr
11/01/2024
Special inspection requirement — Maintenance information
Mudar Khantamr
11/01/2024
Special inspection requirement — Maintenance information
Mudar Khantamr
11/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
Mudar Khantamr
11/01/2024
Special inspection requirement — Mechanical Systems
Mudar Khantamr
11/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Mudar Khantamr
11/01/2024
Special inspection requirement — Ventilation and air distribution system
Mudar Khantamr
11/01/2024
Special inspection requirement — Final
Steven Zirinsky
11/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Zirinsky
10/21/2024
Filed — Alteration
Modify sprinkler system for offices
Q00679260-P9
10/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
Mudar Khantamr
10/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Mudar Khantamr
10/15/2024
Special inspection requirement — Maintenance information
Mudar Khantamr
10/15/2024
Special inspection requirement — Ventilation and air distribution system
Mudar Khantamr
10/15/2024
Special inspection requirement — Final
Steven Zirinsky
10/15/2024
Special inspection requirement — Mechanical Systems
Mudar Khantamr
10/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Zirinsky
08/30/2024
Objection resolved — Addressed
08/01/2024
Objection raised — Energy
07/23/2024
Filed — Alteration
Modify sprinkler system for offices
Q00679260-P7
07/21/2024
Special inspection requirement — Maintenance information
Mudar Khantamr
07/21/2024
Special inspection requirement — HVAC-R and service water heating system controls
Mudar Khantamr
07/21/2024
Special inspection requirement — Ventilation and air distribution system
Mudar Khantamr
07/21/2024
Special inspection requirement — Mechanical Systems
Mudar Khantamr
07/21/2024
Special inspection requirement — Final
Steven Zirinsky
07/21/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Mudar Khantamr
07/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Zirinsky
07/10/2024
Permit issued — Mechanical Systems
Q00679260-S3-MS
06/24/2024
Violation issued (FDNY_NOV, closed)
06/24/2024
Violation issued (FDNY_NOV, closed)
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/18/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/15/2023
Signed off — Alteration
Modify sprinkler system for offices
Q00679260-S4
09/12/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/08/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/21/2023
Filed — Alteration
Modify sprinkler system for offices
Q00679260-P6
05/02/2023
Permit issued — Sprinklers
Q00679260-S4-EW-SP
03/28/2023
Signed off — Alteration
Modify sprinkler system for offices
Q00679260-S1
02/02/2023
Filed — Alteration
Modify sprinkler system for offices
Q00679260-P5
12/05/2022
Signed off — Alteration
Modify sprinkler system for offices
Q00679260-S2
12/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/16/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/30/2022
Objection resolved — Addressed
10/25/2022
Filed — Alteration
Modify sprinkler system for offices
Q00679260-P4
10/25/2022
Filed — Alteration
Modify sprinkler system for offices
Q00679260-P3
09/12/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
Latest 60 of 128 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKeybuilders03/09/2026
DOB NOWMechanical SystemsSigned-offKeybuilders07/10/2024
DOB NOWSprinklersSigned-offCapitol Fire Sprinkler Co05/02/2023
DOB NOWSprinklersSigned-offCapitol Fire Sprinkler Co04/22/2022
DOB NOWSidewalk ShedSigned-offRE-Brick Construction04/08/2022
DOB NOWPlumbingSigned-offAmm General Contracting03/30/2022
DOB NOWGeneral ConstructionSigned-offKeybuilders03/24/2022
DOB NOWGeneral ConstructionSigned-offKeybuilders03/12/2022
BIS—ISSUEDNY Wonder Construction10/19/2021
BISOTISSUEDStar Plus Construction Co10/10/2017
BISEQISSUEDNew American Construction09/25/2017
BISEQISSUEDNew American Construction09/25/2017
BISEQISSUEDSkyline Scaffolding Group09/08/2017
BISEQISSUEDTriborough Construction S08/05/2015
BISEQISSUEDTriborough Construction S07/25/2014
BISEQISSUEDTri Borough Scaffolding05/23/2014
BISEQISSUEDTri Borough Scaffolding12/21/2013
BIS—ISSUEDKel-Mar Designs08/09/2001
BISPLISSUEDConsolidated PLG & Heating02/27/1991
3 projects · most recent 09/17/2023
General Wiring
FiledStatusContractorScope
09/17/2023CompleteWord of Light Electric—
03/13/2023CompleteJoseph Weinstein ElectricGeneral Wiring
04/08/2022CompleteRichard Neu—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/18/2023Pass-Final General Construction Non-Directive 14PassView ↗
09/12/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/08/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/16/2022Fail-Final General Construction Non-Directive 14FailView ↗
09/12/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/21/2022Fail-Final General Construction Non-Directive 14FailView ↗
05/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
12/15/2025MasonryJOHN SEMIOLIspecial
12/15/2025FinalSteven Zirinskyprogress
11/01/2024HVAC-R and service water piping design and insulationMudar Khantamrenergy_progress
11/01/2024HVAC-R and service water heating system controlsMudar Khantamrenergy_progress
11/01/2024Ventilation and air distribution systemMudar Khantamrenergy_progress
11/01/2024Mechanical SystemsMudar Khantamrspecial
11/01/2024Fire-Resistant Penetrations and JointsSteven Zirinskyspecial
11/01/2024FinalSteven Zirinskyprogress
11/01/2024Maintenance informationMudar Khantamrenergy_progress
11/01/2024HVAC-R and service water heating system controlsMudar Khantamrenergy_progress
11/01/2024Ventilation and air distribution systemMudar Khantamrenergy_progress
11/01/2024Maintenance informationMudar Khantamrenergy_progress
11/01/2024HVAC-R and service water piping design and insulationMudar Khantamrenergy_progress
11/01/2024Fire-Resistant Penetrations and JointsSteven Zirinskyspecial
11/01/2024FinalSteven Zirinskyprogress
11/01/2024Mechanical SystemsMudar Khantamrspecial
10/15/2024Mechanical SystemsMudar Khantamrspecial
10/15/2024Ventilation and air distribution systemMudar Khantamrenergy_progress
10/15/2024Maintenance informationMudar Khantamrenergy_progress
10/15/2024HVAC-R and service water heating system controlsMudar Khantamrenergy_progress
10/15/2024HVAC-R and service water piping design and insulationMudar Khantamrenergy_progress
10/15/2024Fire-Resistant Penetrations and JointsSteven Zirinskyspecial
10/15/2024FinalSteven Zirinskyprogress
07/21/2024Mechanical SystemsMudar Khantamrspecial
07/21/2024Ventilation and air distribution systemMudar Khantamrenergy_progress
Latest 25 of 64.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Air-sea Packing GroupIndustrial / Warehouse—
Project Q01334333 Alteration · Permit Entire · 01/06/2026
Air Sea PackingIndustrial / WarehouseFloors 1–3, Roof
Project Q00679260 Alteration · LOC Issued · 02/28/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 195 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/26/2026Q00711994-I1Request digital key ↗
08/25/2026Q00679260-S3Request digital key ↗
08/25/2026Q00679260-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION15
12/01/2025401195997Open ↗
07/21/2025401195997Open ↗
05/23/2025401195997Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION8
10/21/2021401195997Open ↗
10/05/2017440439697Open ↗
09/22/2017440436477Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/01/2023401195997Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/31/2022401195997Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
10/27/2018440439697Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISVERIFY TAX LOT1
08/11/2025401195997Open ↗
▸Seals & Professional Certifications79
▸DOB NOWSpecial Inspector Seal & Signature26
09/23/2026Q00679260-P7Open ↗
09/23/2026Q00679260-P7Open ↗
09/19/2026Q00679260-P9Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/23/2026Q00679260-P7Open ↗
09/19/2026Q00679260-P9Open ↗
09/19/2026Q00679260-P9Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/13/2026Q00679260-S2Open ↗
08/13/2026Q00679260-S3Open ↗
08/13/2026Q00679260-P8Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
10/05/2017440439697Open ↗
09/22/2017440436477Open ↗
09/22/2017440436486Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
10/05/2017440439697Open ↗
09/22/2017440436477Open ↗
09/22/2017440436486Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
10/05/2017440439697Open ↗
09/22/2017440436477Open ↗
09/22/2017440436486Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
11/09/2018440436477Open ↗
10/27/2018440439697Open ↗
10/12/2018440432701Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/01/2014421015751Open ↗
▸Trade Schedules & Equipment2
▸BIS* FIRE ALARM (FA) APPLICATION1
06/20/2025401195997Open ↗
▸BISEQUIPMENT USE PERMITS1
07/03/2024401195997Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/13/2026Q00679260-P7Open ↗
08/13/2026Q00679260-P2Open ↗
08/13/2026Q00679260-S1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/05/2017440439697Open ↗
▸Energy Compliance8
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
09/07/2017440432701Open ↗
12/20/2013440121789Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00679260-S3Open ↗
08/13/2026Q00679260-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/27/2018440439697Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/05/2017440439697Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/27/2018440439697Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/10/2017440439697Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY6
07/20/2023401195997Open ↗
10/05/2017440439697Open ↗
09/22/2017440436477Open ↗
Showing 3 of 6 on file for this type
▸BIS* CONCRETE 27-6031
04/22/2025401195997Open ↗
▸Approvals, Objections & Sign-offs17
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
01/18/2023440121789Open ↗
03/28/2022421015751Open ↗
11/09/2018440436486Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
07/21/2025401195997Open ↗
05/16/2025401195997Open ↗
12/05/2022401195997Open ↗
Showing 3 of 5 on file for this type
▸BISFINAL1
03/25/2022421015751Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/01/2014421015751Open ↗
▸BISSHED LETTER1
06/06/2014440121789Open ↗
▸BISSUPERSEDING LETTER1
10/21/2021401195997Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026Q00711994-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
02/11/2024401195997Open ↗
10/27/2018440439697Open ↗
10/05/2017440439697Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/20/2025401195997Open ↗
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION8
08/11/2025401195997Open ↗
06/04/2025401195997Open ↗
05/28/2025401195997Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
10/05/2017440439697Open ↗
09/22/2017440436477Open ↗
09/22/2017440436486Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM1
10/21/2021401195997Open ↗
▸BISEFILING COVER SHEET1
08/01/2014421015751Open ↗
▸Other Documents4
▸BISFEE EXEMPTION DOCUMENTATION1
12/20/2013440121789Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
04/15/2025401195997Open ↗
▸BIS* * SUBGRADE 27-723,DIRC 15/711
04/22/2025401195997Open ↗
▸BIS* FIRE STOPS 27-3451
04/15/2025401195997Open ↗