← Back
Multi-story retail building (2+)
40-38 UNION STREET
QUEENS · Flushing-Willets Point · BIN 4113563
💬 Discuss this project
1982Year Built
2Stories
K2Building Class
C4-3Zoning
7,044 sfGross Floor Area
6Units
2 Open Violations 1 unresolved · 1 paperwork only ▸
Multi-story retail building (2+) · Owner of record: MADISON PLAZA HOMES,INC · 3,976 sf lot · 1.77 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 20 docs
Floor 24p · 2 filings · 20 docs
Floor 12p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MADISON PLAZA HOMES3903/22/2026
SAFE-SHIELD ENTERPRISES INC503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANK PETRUSO ARCHITECT PC810/01/2024
ASHRAF CORP104/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRANK PETRUSORA AOL COM1603/21/2026
DANICO SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARTISTIC DESIGN CORPGeneral Contractor603/21/2026
SAFE-SHEILD ENTERPRISE INGeneral Contractor303/21/2026
ADRIANO PLMBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519610/01/2024
Building Lifecycle
All (55)Filed (9)Permit Issued (5)Signed Off (4)Violation (3)Inspection (4)Special Inspection (30)
07/14/2025
Signed off — Alteration
REPLACE STOREFRONT ON 1ST FLOOR, REPLACE WINDOWS ON 2ND FLOOR. MINOR BRICK AND STUCCO WORK ON EXTERIOR. INTERIOR GUT RENOVATION OF EXIST 2ND FLOOR APARTMENTS TO INCLUDE PARTITION CHANGES, NEW KITCHENS AND BATHROOMS. (NO CHANGE TO USE EGRESS OR OCCUPANCY).
Q00825898-I1
04/03/2025
Signed off — Alteration
HEAVYDUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
Q01038227-I1
02/27/2025
Signed off — Alteration
REMOVE EXISTING PLUMBING FIXTURES AND INSTALL NEW PLUMBING FIXTURES AND RELATED PIPING (FILED IN CONJUCTION WITH DOB JOB # Q00825898).
Q00826597-I1
12/04/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/25/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/25/2024
Inspection — Certified Water Pressure - WP - PL - Underground Test
Certified
View inspection ↗
10/01/2024
Filed — Alteration
REPLACE STOREFRONT ON 1ST FLOOR, REPLACE WINDOWS ON 2ND FLOOR. MINOR BRICK AND STUCCO WORK ON EXTERIOR. INTERIOR GUT RENOVATION OF EXIST 2ND FLOOR APARTMENTS TO INCLUDE PARTITION CHANGES, NEW KITCHENS AND BATHROOMS. (NO CHANGE TO USE EGRESS OR OCCUPANCY).
Q00825898-P3
10/01/2024
Special inspection requirement — Final
Frank Petruso
10/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
10/01/2024
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
Younes Abouyaala
10/01/2024
Special inspection requirement — Demolition
Younes Abouyaala
10/01/2024
Special inspection requirement — Heating Systems
Younes Abouyaala
10/01/2024
Special inspection requirement — Wood – Seismic Resistance
Younes Abouyaala
10/01/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
10/01/2024
Special inspection requirement — Mechanical Systems
Younes Abouyaala
10/01/2024
Special inspection requirement — Masonry
Younes Abouyaala
10/01/2024
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
10/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/30/2024
Filed — Alteration
REMOVE EXISTING PLUMBING FIXTURES AND INSTALL NEW PLUMBING FIXTURES AND RELATED PIPING (FILED IN CONJUCTION WITH DOB JOB # Q00825898).
Q00826597-P2
09/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
Vatche Ghazarian
09/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Vatche Ghazarian
09/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
Vatche Ghazarian
04/19/2024
Permit issued — Sidewalk Shed
Q01038227-I1-SH
04/18/2024
Filed — Alteration
HEAVYDUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
Q01038227-I1
03/26/2024
Signed off — Alteration
Q00826806-I1
03/26/2024
Permit issued — Structural
Q00825898-I1-GC-CX
12/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/20/2023
Filed — Alteration
REMOVE EXISTING PLUMBING FIXTURES AND INSTALL NEW PLUMBING FIXTURES AND RELATED PIPING (FILED IN CONJUCTION WITH DOB JOB # Q00825898).
Q00826597-P1
12/20/2023
Filed — Alteration
REPLACE STOREFRONT ON 1ST FLOOR, REPLACE WINDOWS ON 2ND FLOOR. MINOR BRICK AND STUCCO WORK ON EXTERIOR. INTERIOR GUT RENOVATION OF EXIST 2ND FLOOR APARTMENTS TO INCLUDE PARTITION CHANGES, NEW KITCHENS AND BATHROOMS. (NO CHANGE TO USE EGRESS OR OCCUPANCY).
Q00825898-P2
12/20/2023
Special inspection requirement — Final
Frank Petruso
12/20/2023
Special inspection requirement — Demolition
Younes Abouyaala
12/20/2023
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
Younes Abouyaala
12/20/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
12/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
12/20/2023
Special inspection requirement — Heating Systems
Younes Abouyaala
12/20/2023
Special inspection requirement — Masonry
Younes Abouyaala
12/20/2023
Special inspection requirement — Mechanical Systems
Younes Abouyaala
12/20/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
12/20/2023
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
10/24/2023
Permit issued — Plumbing
Q00826597-I1-PL
07/14/2023
Permit issued — Structural
Q00825898-I1-GC-CX
06/12/2023
Filed — Alteration
REPLACE STOREFRONT ON 1ST FLOOR, REPLACE WINDOWS ON 2ND FLOOR. MINOR BRICK AND STUCCO WORK ON EXTERIOR. INTERIOR GUT RENOVATION OF EXIST 2ND FLOOR APARTMENTS TO INCLUDE PARTITION CHANGES, NEW KITCHENS AND BATHROOMS. (NO CHANGE TO USE EGRESS OR OCCUPANCY).
Q00825898-P1
06/12/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
06/07/2023
Special inspection requirement — Masonry
Younes Abouyaala
06/07/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
06/07/2023
Special inspection requirement — Demolition
Younes Abouyaala
06/07/2023
Special inspection requirement — Mechanical Systems
Younes Abouyaala
06/07/2023
Special inspection requirement — Structural Steel - Details
Younes Abouyaala
04/22/2023
Permit issued — Construction Fence
Q00826806-I1-FN
02/09/2023
Filed — Alteration
REMOVE EXISTING PLUMBING FIXTURES AND INSTALL NEW PLUMBING FIXTURES AND RELATED PIPING (FILED IN CONJUCTION WITH DOB JOB # Q00825898).
Q00826597-I1
02/09/2023
Filed — Alteration
Q00826806-I1
02/08/2023
Filed — Alteration
REPLACE STOREFRONT ON 1ST FLOOR, REPLACE WINDOWS ON 2ND FLOOR. MINOR BRICK AND STUCCO WORK ON EXTERIOR. INTERIOR GUT RENOVATION OF EXIST 2ND FLOOR APARTMENTS TO INCLUDE PARTITION CHANGES, NEW KITCHENS AND BATHROOMS. (NO CHANGE TO USE EGRESS OR OCCUPANCY).
Q00825898-I1
11/04/2015
Violation issued (ECB, closed)
Construction
08/07/2008
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/07/2008
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offSAFE-SHEILD ENTERPRISE IN04/19/2024
DOB NOWStructuralSigned-offARTISTIC DESIGN CORP03/26/2024
DOB NOWPlumbingSigned-offADRIANO PLMBG & HTG CORP10/24/2023
DOB NOWStructuralSigned-offARTISTIC DESIGN CORP07/14/2023
DOB NOWConstruction FenceSigned-offARTISTIC DESIGN CORP04/22/2023
BISMHISSUEDGAMEZ CONTRACTOR CORP09/17/2015
BISPLISSUEDS & L PLUMBING INC06/13/2005
BISEQISSUEDSPINDLE L&C CORP06/01/2005
BISOTISSUEDSPINDLE L&C CORP06/01/2005
BISMHISSUEDAIR TECH SERVICE INC04/01/2004
BISOTISSUEDSPACE SIGN CO INC02/18/2003
BISOTISSUEDSPACE SIGN CO INC02/18/2003
BISPLISSUEDTRI CITY MECHANICAL GROUP CORP02/10/1993
BISOTISSUEDMADISON PLAZA HOMES INC.12/30/1992
2 projects · most recent 12/05/2023
General Wiring
FiledStatusContractorScope
12/05/2023CompletePARMA ELECTRICAL CORPGeneral Wiring
08/16/2019CompleteACCURATE ELEC'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/04/2024Pass-Final General Construction Non-Directive 14PassView ↗
11/25/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/25/2024Certified Water Pressure - WP - PL - Underground TestCertifiedView ↗
12/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
10/01/2024FinalFrank Petrusoprogress
10/01/2024Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
10/01/2024Exhaust and Vent Systems in Plenums and DuctsYounes Abouyaalaspecial
10/01/2024DemolitionYounes Abouyaalaspecial
10/01/2024Heating SystemsYounes Abouyaalaspecial
10/01/2024Wood – Seismic ResistanceYounes Abouyaalaspecial
10/01/2024Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
10/01/2024Mechanical SystemsYounes Abouyaalaspecial
10/01/2024MasonryYounes Abouyaalaspecial
10/01/2024Structural Steel - DetailsYounes Abouyaalaspecial
10/01/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/30/2024HVAC-R and service water heating system controlsVatche Ghazarianenergy_progress
09/30/2024HVAC-R and service water piping design and insulationVatche Ghazarianenergy_progress
09/30/2024HVAC-R and service water heating equipmentVatche Ghazarianenergy_progress
12/20/2023FinalFrank Petrusoprogress
12/20/2023DemolitionYounes Abouyaalaspecial
12/20/2023Exhaust and Vent Systems in Plenums and DuctsYounes Abouyaalaspecial
12/20/2023Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
12/20/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
12/20/2023Heating SystemsYounes Abouyaalaspecial
12/20/2023MasonryYounes Abouyaalaspecial
12/20/2023Mechanical SystemsYounes Abouyaalaspecial
12/20/2023Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
12/20/2023Structural Steel - DetailsYounes Abouyaalaspecial
06/12/2023Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
Latest 25 of 34.
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026Q00826806-I1Request digital key ↗
08/24/2026Q00825898-I1Request digital key ↗
08/24/2026Q00825898-P3Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
09/21/2015421215447Open ↗
▸BISWORK PERMIT APPLICATION1
09/24/2015421215447Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026Q00826806-I1Open ↗
08/24/2026Q00825898-P3Open ↗
08/24/2026Q00825898-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q00825898-P2Open ↗
08/30/2026Q00825898-I1Open ↗
08/25/2026Q00825898-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q00825898-P2Open ↗
09/01/2026Q00825898-P2Open ↗
08/30/2026Q00825898-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/28/2015421215447Open ↗
09/21/2015421215447Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/21/2015421215447Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/24/2015421215447Open ↗
▸Trade Schedules & Equipment5
▸BISEQUIPMENT USE APPLICATION/PERMIT3
10/11/2016421215447Open ↗
10/27/2015421215447Open ↗
09/21/2015421215447Open ↗
▸BISEQUIPMENT USE PERMITS2
10/11/2016421215447Open ↗
10/11/2016421215447Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/24/2026Q00825898-I1Open ↗
08/24/2026Q00825898-P3Open ↗
08/24/2026Q00825898-P2Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/28/2015421215447Open ↗
09/21/2015421215447Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCONSTRUCTION CODE DETERMINATION2
10/11/2016421215447Open ↗
09/29/2016421215447Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/11/2016421215447Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/29/2016421215447Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/28/2015421215447Open ↗
09/21/2015421215447Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
09/21/2015421215447Open ↗
▸BISADDITIONAL INFORMATION1
10/27/2015421215447Open ↗