← Back
Over six families without stores
40-39 48 STREET
QUEENS · BIN 4001067
💬 Discuss this project
1931Year Built
4Stories
C1Building Class
R5DZoning
24,044 sfGross Floor Area
31Units
Rent Stabilized5 Open Violations ▸
Over six families without stores · Owner of record: COLONNADES LLC · 7,600 sf lot · 3.16 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 05/10/2023
Boiler Controls
FiledStatusContractorScope
05/10/2023CompleteABILENE ELECTRIC INCBoiler Controls
Building Lifecycle
All (70)Filed (6)Permit Issued (6)Signed Off (5)Violation (42)Inspection (4)Special Inspection (7)
04/28/2026
Violation issued (HPD, closed)
B
02/15/2026
Violation issued (HPD, closed)
B
02/15/2026
Violation issued (HPD, closed)
C
01/14/2026
Violation issued (HPD, closed)
B
01/14/2026
Violation issued (HPD, closed)
B
10/18/2024
Violation issued (HPD, closed)
B
10/18/2024
Violation issued (HPD, closed)
C
10/18/2024
Violation issued (HPD, closed)
C
10/18/2024
Violation issued (HPD, closed)
A
10/18/2024
Violation issued (HPD, closed)
C
10/18/2024
Violation issued (HPD, closed)
C
10/18/2024
Violation issued (HPD, closed)
A
10/18/2024
Violation issued (HPD, closed)
B
10/18/2024
Violation issued (HPD, closed)
A
10/18/2024
Violation issued (HPD, closed)
C
10/18/2024
Violation issued (HPD, closed)
C
10/18/2024
Violation issued (HPD, closed)
C
10/18/2024
Violation issued (HPD, closed)
C
10/18/2024
Violation issued (HPD, closed)
A
10/18/2024
Violation issued (HPD, closed)
A
09/15/2024
Violation issued (HPD, closed)
B
09/15/2024
Violation issued (HPD, closed)
B
09/15/2024
Violation issued (HPD, closed)
B
09/15/2024
Violation issued (HPD, open)
B
09/11/2024
Violation issued (HPD, closed)
B
09/11/2024
Violation issued (HPD, closed)
C
09/11/2024
Violation issued (HPD, closed)
C
08/20/2024
Violation issued (HPD, closed)
A
08/20/2024
Violation issued (HPD, closed)
A
07/18/2024
Violation issued (HPD, open)
C
07/18/2024
Violation issued (HPD, open)
C
04/29/2024
Signed off — Alteration
Q00605855-I1
04/29/2024
Signed off — Alteration
Q00605864-I1
02/18/2024
Violation issued (HPD, closed)
B
02/18/2024
Violation issued (HPD, closed)
B
02/07/2024
Violation issued (HPD, closed)
C
09/12/2023
Signed off — Alteration
REPLACEMENT BOILER AND GAS/OIL BURNER.
Q00791917-I1
09/12/2023
Signed off — Alteration
EXISTING GAS SERVICE CONNECTION TO REPLACEMENT BURNER
Q00791782-I1
05/16/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/15/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/06/2023
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
05/05/2023
Filed — Alteration
EXISTING GAS SERVICE CONNECTION TO REPLACEMENT BURNER
Q00791782-P1
04/11/2023
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
03/22/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/08/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/15/2022
Permit issued — Plumbing
Q00791782-I1-PL
09/15/2022
Permit issued — Boiler Equipment
Q00791917-I1-BE
08/29/2022
Filed — Alteration
REPLACEMENT BOILER AND GAS/OIL BURNER.
Q00791917-I1
08/29/2022
Filed — Alteration
EXISTING GAS SERVICE CONNECTION TO REPLACEMENT BURNER
Q00791782-I1
08/26/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
08/26/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
08/26/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
08/26/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
08/11/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
08/03/2022
Signed off — Alteration
REPLACE CRACKED IN WINDOW LINTEL APPOX. 49 PCS AND CRACK BRICK REPAIRS AS PER FIELDCONDITIONS OF FRONT FACADES . NO CHANGE INUSE, EGRESS AND OCCUPANCY
Q00623928-I1
05/24/2022
Permit issued — General Construction
Q00623928-I1-GC
11/10/2021
Permit issued — General Construction
Q00623928-I1-GC
11/04/2021
Filed — Alteration
REPLACE CRACKED IN WINDOW LINTEL APPOX. 49 PCS AND CRACK BRICK REPAIRS AS PER FIELDCONDITIONS OF FRONT FACADES . NO CHANGE INUSE, EGRESS AND OCCUPANCY
Q00623928-I1
10/12/2021
Permit issued — Supported Scaffold
Q00605864-I1-SF
10/12/2021
Permit issued — Sidewalk Shed
Q00605855-I1-SH
Latest 60 of 70 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GUL G CONTRACTING807/08/2026
COLONNADES1607/08/2026
MAESTRO BUILDERS CORPORATION703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.305/05/2023
ARC-HI-TECT ASSOCIATE INC111/04/2021
ASHRAF CORP210/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING303/21/2026
DANICO SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GUL & G CONTRACTING INCGeneral Contractor407/08/2026
MAESTRO BUILDERS CORPORATIONGeneral Contractor303/21/2026
JETCO CONSTRUCTION CORPGeneral Contractor203/21/2026
NY CITY PLUMBER CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851108/29/2022
ARC-HI-TECH ASSOCIATES IN6963211/04/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNY CITY PLUMBER CORP09/15/2022
DOB NOWBoiler EquipmentSigned-offABILENE, INC09/15/2022
DOB NOWGeneral ConstructionSigned-offMAESTRO BUILDERS CORPORAT05/24/2022
DOB NOWGeneral ConstructionSigned-offJETCO CONSTRUCTION11/10/2021
DOB NOWSupported ScaffoldSigned-offGUL & G CONTRACTING INC10/12/2021
DOB NOWSidewalk ShedSigned-offGUL & G CONTRACTING INC10/12/2021
BISFBISSUEDACE ATLAS CORP11/10/2004
BISBLISSUEDCOOPER MECHANICAL CORP11/10/2004
BISPLISSUEDCOOPER MECHANICAL CORP11/10/2004
BISOTISSUEDAPPLE INCINERATOR & COMPACTION08/15/1989
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/08/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
05/06/2023Energy Code Compliance InspectionsLOUIS ARENAprogress
04/11/2023Energy Code Compliance InspectionsLOUIS ARENAprogress
08/26/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
08/26/2022Maintenance informationLOUIS ARENAenergy_progress
08/26/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
08/26/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
08/11/2022Heating SystemsLOUIS ARENAspecial
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026Q00605855-I1Request digital key ↗
08/27/2026Q00605864-I1Request digital key ↗
08/27/2026Q00623928-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00605855-I1Open ↗
08/27/2026Q00623928-I1Open ↗
08/25/2026Q00791917-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026Q00791917-I1Open ↗
09/02/2026Q00791782-P1Open ↗
08/26/2026Q00791782-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026Q00791917-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026Q00623928-I1Open ↗
08/25/2026Q00791917-I1Open ↗
08/24/2026Q00791782-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00623928-I1Open ↗
08/13/2026Q00791917-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00791917-I1Open ↗