← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
40-46 24TH STREET
QUEENS · BIN 4624804
💬 Discuss this project
2019Year Built
6Stories
RMBuilding Class
M1-2/R6AZoning
40,656 sfGross Floor Area
73Units
0 Open ViolationsFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 23-17 41 AVE HOLDING LLC · 10,000 sf lot · 4.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivil
Permit Issued — active, not yet Signed-off
Roof14p · 2 filings · 20 docs
Floor 613p · 1 filing · 20 docs
Floor 514p · 1 filing · 20 docs
Floor 413p · 1 filing · 20 docs
Floor 313p · 1 filing · 20 docs
Floor 214p · 1 filing · 20 docs
Floor 1Under Construction22p · 2 filings · 20 docs
Cellar14p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
23-17 41 AVE HOLDING7304/09/2026
PLATINUM SERVICES NY1103/22/2026
VIK XS SERVICES INC903/22/2026
WARMER CONSTRUCTION SERVI103/22/2026
WARNER CONSTRUCTION SERVI903/22/2026
40-44 24TH STREET803/21/2026
ZD JASPER REALTY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES2303/21/2026
MY ARCHITECT203/21/2026
PLATINUM SERVICES NY603/21/2026
ZV Drafting103/21/2026
TWP DESIGN CONSULTING203/21/2026
AO CONSULTING AND DRAFTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WARNER CONSTRUCTION SERVIGeneral Contractor3507/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor603/21/2026
VIP FIRE SPRINKLER INCFire Protection407/08/2026
SAFEPIPE PLUMBING INCPlumbing207/08/2026
SAFEPIPE PLUMBINGPlumbing203/22/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
HV ELECTRIC CORPElectrical103/22/2026
SAFEPIPE PLUMBING INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GRAND INSPECTION & CONSUL67922408/17/2026
Building Lifecycle
All (185)Filed (32)Permit Issued (24)Signed Off (14)Violation (10)Inspection (21)Objection (54)Special Inspection (30)
08/17/2026
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO; job number: Q01248202-I1.
Q01248202-P1
01/28/2026
Signed off — Alteration CO
Sprinkler application filed subsequent to Alt-CO; job number: Q01248202-I1.
Q01248202-S2
01/08/2026
Signed off — Alteration CO
Sprinkler application filed subsequent to Alt-CO; job number: Q01248202-I1.
Q01248202-S3
12/31/2025
Signed off — Alteration CO
Sprinkler application filed subsequent to Alt-CO; job number: Q01248202-I1.
Q01248202-S1
12/31/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/19/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/16/2025
Permit issued — Mechanical Systems
Q01248202-S3-MS
12/16/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/10/2025
Permit issued — General Construction
Q01248202-I1-GC
11/06/2025
Objection resolved — Addressed
10/24/2025
Permit issued — Sprinklers
Q01248202-S2-EW-SP
10/24/2025
Permit issued — Plumbing
Q01248202-S1-PL
10/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/21/2025
Objection raised — Energy
09/26/2025
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO; job number: Q01248202-I1.
Q01248202-S2
09/26/2025
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO; job number: Q01248202-I1.
Q01248202-S3
09/26/2025
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO; job number: Q01248202-I1.
Q01248202-S1
09/25/2025
Special inspection requirement — Energy Code Compliance Inspections
RUWAN RAJAPAKSE
09/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
RUWAN RAJAPAKSE
09/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
RUWAN RAJAPAKSE
09/25/2025
Special inspection requirement — Shutoff dampers
BARNABY BURY
09/25/2025
Special inspection requirement — Duct leakage testing, insulation and design
BARNABY BURY
09/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
BARNABY BURY
09/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
BARNABY BURY
09/25/2025
Special inspection requirement — Post-installed Anchors
RUWAN RAJAPAKSE
09/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
BARNABY BURY
09/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RUWAN RAJAPAKSE
09/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
RUWAN RAJAPAKSE
09/25/2025
Special inspection requirement — Maintenance information
BARNABY BURY
09/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
RUWAN RAJAPAKSE
09/25/2025
Special inspection requirement — Maintenance information
RUWAN RAJAPAKSE
09/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
RUWAN RAJAPAKSE
09/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BARNABY BURY
09/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
BARNABY BURY
09/25/2025
Special inspection requirement — Mechanical Systems
BARNABY BURY
09/25/2025
Special inspection requirement — Heating Systems
BARNABY BURY
09/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RUWAN RAJAPAKSE
09/25/2025
Special inspection requirement — Energy Code Compliance Inspections
BARNABY BURY
09/25/2025
Special inspection requirement — Final
BARNABY BURY
09/25/2025
Special inspection requirement — Sprinkler Systems
RUWAN RAJAPAKSE
09/17/2025
Objection resolved — Addressed
08/11/2025
Objection raised — Cost
07/16/2025
Filed — Alteration CO
Sprinkler application filed subsequent to Alt-CO; job number: Q01248202-I1.
Q01248202-I1
07/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
RUWAN RAJAPAKSE
07/02/2025
Special inspection requirement — Interior lighting power
RUWAN RAJAPAKSE
07/02/2025
Special inspection requirement — Lighting controls
RUWAN RAJAPAKSE
07/02/2025
Special inspection requirement — Energy Code Compliance Inspections
RUWAN RAJAPAKSE
07/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
RUWAN RAJAPAKSE
07/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RUWAN RAJAPAKSE
01/30/2025
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
12/13/2024
Signed off — Alteration
Filing Curb cut application in conjunction with NB application #Q08029074
Q08034667-I1
12/11/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/10/2024
Signed off — New Building
SOE in conjunction with NB GC Q08029074-I1
Q08029074-S8
12/09/2024
Special inspection requirement — Heating Systems
RUWAN RAJAPAKSE
11/20/2024
Filed — New Building
SOE in conjunction with NB GC Q08029074-I1
Q08029074-A6
11/15/2024
Signed off — New Building
SOE in conjunction with NB GC Q08029074-I1
Q08029074-Z6
Latest 60 of 185 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offWARNER CONSTRUCTION SERVI12/16/2025
DOB NOWGeneral ConstructionPermit IssuedWARNER CONSTRUCTION SERVI11/10/2025
DOB NOWSprinklersSigned-offBELLEROSE PLBG & HEATING10/24/2025
DOB NOWPlumbingSigned-offBELLEROSE PLBG & HTG10/24/2025
DOB NOWCurb CutSigned-offWARNER CONSTRUCTION SERVI11/01/2024
DOB NOWStandpipeSigned-offVIP FIRE SPRINKLER INC08/28/2024
DOB NOWStandpipeSigned-offVIP FIRE SPRINKLER INC08/28/2024
DOB NOWGeneral ConstructionPermit IssuedWARNER CONSTRUCTION SERVI08/12/2024
DOB NOWMechanical SystemsSigned-offWARNER CONSTRUCTION SERVI07/15/2024
DOB NOWConstruction FenceSigned-offWARNER CONSTRUCTION SERVI07/11/2024
DOB NOWGeneral ConstructionPermit IssuedWARNER CONSTRUCTION SERVI07/09/2024
DOB NOWSuspended ScaffoldSigned-offVIK XS SERVICES INC12/20/2023
DOB NOWSuspended ScaffoldSigned-offVIK XS SERVICES INC12/19/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC10/13/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC10/13/2023
DOB NOWStandpipeSigned-offVIP FIRE SPRINKLER INC09/06/2023
DOB NOWStandpipeSigned-offVIP FIRE SPRINKLER INC09/06/2023
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP08/28/2023
DOB NOWStructuralSigned-offWARNER CONSTRUCTION SERVI07/26/2023
DOB NOWGeneral ConstructionPermit IssuedWARNER CONSTRUCTION SERVI07/24/2023
DOB NOWFoundationSigned-offWARNER CONSTRUCTION SERVI07/20/2023
DOB NOWSupport of ExcavationSigned-offWARNER CONSTRUCTION SERVI07/20/2023
DOB NOWConstruction FenceSigned-offWARNER CONSTRUCTION SERVI07/17/2023
DOB NOWMechanical SystemsSigned-offWARNER CONSTRUCTION SERVI07/12/2023
BISOTISSUEDACCORD POWER INC08/30/2024
BISOTISSUEDACCORD POWER INC09/01/2023
BISSPISSUEDWHITESTONE PLUMBING CORP02/09/2022
BISSPISSUEDWHITESTONE PLUMBING CORP01/15/2021
BISEQISSUEDPOWERS BRIDGING & SCAFFOLDING09/18/2020
BIS—ISSUEDT & G CUSTOM CRAFTS DESIGNS INC.04/24/1995
2 projects · most recent 08/17/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/17/2026Signed-offWARNER CONSTRUCTION SERVIHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PUHY-P144TNU-A 144,000 BTU · Vrf Outdoor ×2
11/20/2024Permit IssuedWARNER CONSTRUCTION SERVIHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAM2-U1 36,000 BTU · Condensing Unit ×35
PUZ-A24NHA7 24,000 BTU · Condensing Unit ×8
MXZ-SM48NAM-U1 48,000 BTU · Condensing Unit ×1
Cooper & Hunter CH-NY18MIA-230VO 20,000 BTU · Condensing Unit ×1
Trane 4WCC4024E1000AA 23,800 BTU · Rooftop Unit ×1
Ventilation
Greenheck ERV-10-20H-VG 750 CFM · Erv ×1
2 projects · most recent 08/17/2026
Sprinkler System
FiledStatusContractorScope
08/17/2026Signed-offSAFEPIPE PLUMBING INCSprinkler System
11/20/2024Signed-offVIP FIRE SPRINKLER INCSprinkler System
2 projects · most recent 08/17/2026
Water/Sanitary Storm
FiledStatusContractorScope
08/17/2026Signed-offSAFEPIPE PLUMBING INCWater/Sanitary
11/20/2024Signed-offDPH PLUMBING & HTG CORPStorm, Water/Sanitary
6 projects · most recent 05/13/2025
General Wiring
FiledStatusContractorScope
05/13/2025CompleteHV ELECTRIC CORPGeneral Wiring
02/25/2025CompleteHV ELECTRIC CORPGeneral Wiring
09/03/2024CompletePOWER SURGE ELECTRIC, INC—
11/22/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
09/27/2023CompleteR.C.M. ELECTRIC CORP.—
06/12/2023CompleteHV ELECTRIC CORP1 meters, 1 new_meters
1 project · most recent 11/20/2024
Concrete
FiledStatusContractorScope
11/20/2024Signed-offVIP FIRE SPRINKLER INCConcrete
1 project · most recent 08/17/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/17/2026Signed-offWARNER CONSTRUCTION SERVITenant Protection Plan 72 Hour
1 project · most recent 11/20/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
11/20/2024Signed-offVIP FIRE SPRINKLER INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
12/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/19/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/16/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/10/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/30/2025Pass-Final SD - Fire PumpPassView ↗
12/11/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
10/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/23/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
10/11/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
10/01/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/24/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/03/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/30/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/20/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/12/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/06/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 136
DateRequirementInspectorRole
09/25/2025Tenant Protection Plan ComplianceRUWAN RAJAPAKSEspecial
09/25/2025Fire-Resistant Penetrations and JointsRUWAN RAJAPAKSEspecial
09/25/2025Sprinkler SystemsRUWAN RAJAPAKSEspecial
09/25/2025Fire-Resistant Penetrations and JointsRUWAN RAJAPAKSEspecial
09/25/2025Post-installed AnchorsRUWAN RAJAPAKSEspecial
09/25/2025Tenant Protection Plan ComplianceRUWAN RAJAPAKSEspecial
09/25/2025Duct leakage testing, insulation and designBARNABY BURYenergy_progress
09/25/2025HVAC-R and service water heating equipmentBARNABY BURYenergy_progress
09/25/2025Maintenance informationBARNABY BURYenergy_progress
09/25/2025Shutoff dampersBARNABY BURYenergy_progress
09/25/2025HVAC-R and service water heating system controlsBARNABY BURYenergy_progress
09/25/2025HVAC-R and service water piping design and insulationBARNABY BURYenergy_progress
09/25/2025Energy Code Compliance InspectionsBARNABY BURYprogress
09/25/2025FinalBARNABY BURYprogress
09/25/2025Heating SystemsBARNABY BURYspecial
09/25/2025Fire-Resistant Penetrations and JointsBARNABY BURYspecial
09/25/2025Tenant Protection Plan ComplianceBARNABY BURYspecial
09/25/2025Mechanical SystemsBARNABY BURYspecial
09/25/2025HVAC-R and service water piping design and insulationRUWAN RAJAPAKSEenergy_progress
09/25/2025Maintenance informationRUWAN RAJAPAKSEenergy_progress
09/25/2025HVAC-R and service water heating equipmentRUWAN RAJAPAKSEenergy_progress
09/25/2025HVAC-R and service water heating system controlsRUWAN RAJAPAKSEenergy_progress
09/25/2025Energy Code Compliance InspectionsRUWAN RAJAPAKSEprogress
07/02/2025Tenant Protection Plan ComplianceRUWAN RAJAPAKSEspecial
07/02/2025Lighting controlsRUWAN RAJAPAKSEenergy_progress
Latest 25 of 136.
▾Documents — 292 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch32
08/25/2026Q08029074-Z2Request digital key ↗
08/25/2026Q08029074-A6Request digital key ↗
08/25/2026Q08029074-A5Request digital key ↗
Showing 3 of 32 on file for this type
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION16
04/22/2025421839915Open ↗
12/11/2024440796729Open ↗
09/30/2024440627207Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION4
09/01/2023440796729Open ↗
01/15/2021421226989Open ↗
01/15/2021421226989Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
05/05/2020421226989Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
02/09/2023440756932Open ↗
▸Zoning, Tax Lot & Property Records12
▸DOB NOWZoning Exhibit form (1-5)6
08/25/2026Q08029074-P5Open ↗
08/18/2026Q01248202-P1Open ↗
08/15/2026Q08029074-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
08/25/2026Q08029074-P5Open ↗
08/15/2026Q08029074-I1Open ↗
08/13/2026Q08029074-A5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/15/2026Q08029074-I1Open ↗
08/13/2026Q01248202-I1Open ↗
▸Seals & Professional Certifications91
▸DOB NOWDPL-1: Design Professional Seal & Signature32
08/25/2026Q08029074-Z1Open ↗
08/25/2026Q08029074-S5Open ↗
08/25/2026Q08029074-A5Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature28
09/27/2026Q08029074-P6Open ↗
09/23/2026Q01248202-S3Open ↗
09/23/2026Q01248202-S2Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
09/23/2026Q01248202-S3Open ↗
09/23/2026Q01248202-S3Open ↗
09/02/2026Q08029074-P2Open ↗
Showing 3 of 24 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/08/2023440796729Open ↗
02/09/2023440756932Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/09/2023440756932Open ↗
09/14/2020440627207Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/14/2020440627207Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/22/2015421226989Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/14/2020440627207Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/25/2026Q08029074-P5Open ↗
08/15/2026Q08029074-I1Open ↗
Showing 2 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/27/2020421226989Open ↗
10/22/2015421226989Open ↗
▸BISSTANDPIPE SYSTEMS1
12/07/2020421226989Open ↗
▸BISSPRINKLER SYSTEMS1
12/07/2020421226989Open ↗
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist6
08/25/2026Q08029074-P5Open ↗
08/18/2026Q01248202-P1Open ↗
08/15/2026Q08029074-I1Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST1
02/09/2023440756932Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
09/01/2023440796729Open ↗
▸BISSTREET TREES SITE PLAN1
02/09/2023440756932Open ↗
▸DOB NOWStreet Trees Site Plan1
08/15/2026Q08029074-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/15/2026Q08029074-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026Q08029074-I1Open ↗
▸Environmental & Asbestos49
▸DOB NOWOER: Notice to Proceed32
08/25/2026Q08029074-P5Open ↗
08/25/2026Q08029074-P7Open ↗
08/25/2026Q08029074-P7Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWOER: Notice of Satisfaction12
08/25/2026Q08029074-S5Open ↗
08/25/2026Q08029074-S5Open ↗
08/25/2026Q08029074-Z2Open ↗
Showing 3 of 12 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
08/14/2023440796729Open ↗
06/06/2023440756932Open ↗
09/14/2020440627207Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
04/21/2025440756932Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
01/15/2021421226989Open ↗
▸Energy Compliance6
▸BISAS-BUILT ENERGY ANALYSIS2
01/08/2025440796729Open ↗
01/08/2025440796729Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/08/2025440796729Open ↗
08/08/2023440796729Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
01/10/2025440796729Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
08/08/2023440796729Open ↗
▸Inspections & Test Reports13
▸DOB NOWSOIL REPORT4
08/25/2026Q08029074-P7Open ↗
08/25/2026Q08029074-P2Open ↗
08/25/2026Q08029074-Z2Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY3
01/08/2025440796729Open ↗
08/08/2023440796729Open ↗
09/14/2020440627207Open ↗
▸BISPOST-INSTALLED ANCHORS1
12/07/2020421226989Open ↗
▸BISHYDRO FLOW TEST LETTER1
05/05/2020421226989Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
05/05/2020421226989Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/07/2020421226989Open ↗
▸DOB NOWTR5 Test Report1
08/25/2026Q08029074-Z2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/25/2026Q08029074-Z2Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION4
01/10/2025440796729Open ↗
03/12/2024421839915Open ↗
02/09/2023440756932Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
10/22/2015421226970Open ↗
10/22/2015421226989Open ↗
▸BISCURB CUT (CC) SIGNOFF1
01/13/2025440756932Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/10/2025440796729Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
01/08/2025440796729Open ↗
01/08/2025440796729Open ↗
08/08/2023440796729Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION4
12/13/2024440796729Open ↗
08/14/2023440796729Open ↗
08/08/2023440796729Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
08/08/2023440796729Open ↗
02/09/2023440756932Open ↗
09/14/2020440627207Open ↗
▸BISEFILING COVER SHEET3
04/22/2025421839915Open ↗
10/22/2015421226970Open ↗
10/22/2015421226989Open ↗
▸BISBOROUGH INTAKE FORM1
04/27/2020421226989Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/09/2023440756932Open ↗
▸Other Documents22
▸DOB NOWProperty Ownership Certification6
08/25/2026Q08029074-A5Open ↗
08/25/2026Q08029074-A3Open ↗
08/25/2026Q08029074-P5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial4
08/25/2026Q08029074-P5Open ↗
08/15/2026Q08029074-I1Open ↗
08/13/2026Q08029074-A3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/25/2026Q08029074-P5Open ↗
08/15/2026Q08029074-I1Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/25/2026Q08029074-Z2Open ↗
08/25/2026Q08029074-S5Open ↗
▸DOB NOWManufacturer's Specifications2
08/25/2026Q08029074-Z7Open ↗
08/25/2026Q08029074-Z6Open ↗
▸DOB NOWCalculations2
08/25/2026Q08029074-Z6Open ↗
08/25/2026Q08029074-Z7Open ↗
▸BISDOT COMPLIANCES FOR PEDRAMP AT CORNERS1
04/21/2025440756932Open ↗
▸DOB NOWFinal Survey1
08/15/2026Q08029074-I1Open ↗