← Back
Multi-story retail building (2+)
40-48 MAIN STREET
QUEENS · BIN 4462294
💬 Discuss this project
1931Year Built
3Stories
K2Building Class
C4-5XZoning
11,098 sfGross Floor Area
4Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Multi-story retail building (2+) · Owner of record: 40-48 MAIN STREET REA · 3,033 sf lot · 3.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof2p · 1 filing · 2 docs
Floor 11p · 1 filing · 20 docs
Cellar3p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMROLS HOUSING2007/08/2026
LAWLIN REALTY103/22/2026
40-48 MAIN ST REA203/22/2026
40-48 MAIN STREET REALTY LLC1003/22/2026
40-48 REALITY CORP303/22/2026
SAM YUAN MAIN ST REALTY L103/22/2026
MAIN STREET REALTY603/21/2026
40-46 MAIN ST REALTY1603/21/2026
FAIB103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TAN ENGINEERING PC206/27/2024
KM CONSULTING ENGINEERS, INC.104/10/2023
CHERICO KING ARCHITECT, P.C.309/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GC1 EXPEDITING203/21/2026
CHERICO KING ARCHITECT P C1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor507/08/2026
KLE CONSTRUCTION INCGeneral Contractor303/21/2026
ALL MAKES HTG & A/C CORPGeneral Contractor203/21/2026
ARCO PLBG AND HTG INCFire Protection107/08/2026
J.A. LEE ELECTRIC INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TAN ENGINEERING, P.C.1291206/27/2024
KM CONSULTING NY, INC.5305104/10/2023
G ENGINEERING PC7778109/08/2022
CHERICO KING ARCHITECT PC5674209/06/2022
Building Lifecycle
All (66)Filed (6)Permit Issued (6)Signed Off (4)Violation (9)Inspection (3)Objection (10)Special Inspection (28)
02/12/2025
Signed off — Alteration
Carrier: T-Mobile. Replace (3) antennas per sector (6 total). Install (1) antenna per sector (2 total). Replace (1) RRU per sector (2 total), Install (4) RRUs (8 total). All work is in conformance with TPPN #5/98.
Q00805528-I1
08/29/2024
Signed off — Alteration
MODIFY EXISTING SPRINKLER SYSTEM FROM CELLAR, 1ST FLOOR TO MEZZANINE LEVELS. ADDING AND RELOCATE SPRINKLER HEADS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00661606-I1
08/13/2024
Signed off — Alteration
RENOVATE EXISTING ACCESSORY STORAGE SPACE AT CELLAR. REMOVE EXISTING INTERIOR NON LOAD WALLS. INSTALL NEW CONVENIENT STAIR FROM CELLAR TO 1ST FLOOR. INSTALL HUNG CEILING. MINOR HVAC DUCT WORK. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
Q00579826-S1
07/17/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/15/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
07/09/2024
Special inspection requirement — Sprinkler Systems
Roger Tan
06/27/2024
Filed — Alteration
MODIFY EXISTING SPRINKLER SYSTEM FROM CELLAR, 1ST FLOOR TO MEZZANINE LEVELS. ADDING AND RELOCATE SPRINKLER HEADS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00661606-P1
06/27/2024
Special inspection requirement — Sprinkler Systems
Roger Tan
06/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
04/26/2024
Signed off — Alteration
RENOVATE EXISTING ACCESSORY STORAGE SPACE AT CELLAR. REMOVE EXISTING INTERIOR NON LOAD WALLS. INSTALL NEW CONVENIENT STAIR FROM CELLAR TO 1ST FLOOR. INSTALL HUNG CEILING. MINOR HVAC DUCT WORK. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
Q00579826-I1
04/26/2024
Permit issued — Mechanical Systems
Q00579826-I1-MS
03/28/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/17/2023
Permit issued — Antenna
Q00805528-I1-AN
10/02/2023
Objection resolved — Addressed
10/02/2023
Objection resolved — Addressed
10/02/2023
Objection resolved — Addressed
10/02/2023
Objection resolved — Addressed
10/02/2023
Objection resolved — Addressed
05/16/2023
Permit issued — Sprinklers
Q00661606-I1-EW-SP
04/20/2023
Objection raised — Scope
04/20/2023
Objection raised — Admin
04/20/2023
Objection raised — Zoning
04/20/2023
Objection raised — Scope
04/20/2023
Objection raised — Zoning
04/10/2023
Filed — Alteration
Carrier: T-Mobile. Replace (3) antennas per sector (6 total). Install (1) antenna per sector (2 total). Replace (1) RRU per sector (2 total), Install (4) RRUs (8 total). All work is in conformance with TPPN #5/98.
Q00805528-I1
03/20/2023
Permit issued — Mechanical Systems
Q00579826-I1-GC
02/27/2023
Permit issued — Structural
Q00579826-S1-ST
02/27/2023
Permit issued — General Construction
Q00579826-I1-GC
09/13/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Cherico King
09/13/2022
Special inspection requirement — Mechanical Systems
Cherico King
09/13/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Cherico King
09/13/2022
Special inspection requirement — Final
LAWRENCE MAREK
09/13/2022
Special inspection requirement — Fire-Resistance Rated Construction
Cherico King
09/13/2022
Special inspection requirement — Energy Code Compliance Inspections
Cherico King
09/13/2022
Special inspection requirement — Lighting controls
Cherico King
09/13/2022
Special inspection requirement — Ventilation and air distribution system
Cherico King
09/13/2022
Special inspection requirement — Interior lighting power
Cherico King
09/08/2022
Filed — Alteration
RENOVATE EXISTING ACCESSORY STORAGE SPACE AT CELLAR. REMOVE EXISTING INTERIOR NON LOAD WALLS. INSTALL NEW CONVENIENT STAIR FROM CELLAR TO 1ST FLOOR. INSTALL HUNG CEILING. MINOR HVAC DUCT WORK. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
Q00579826-S1
09/06/2022
Filed — Alteration
RENOVATE EXISTING ACCESSORY STORAGE SPACE AT CELLAR. REMOVE EXISTING INTERIOR NON LOAD WALLS. INSTALL NEW CONVENIENT STAIR FROM CELLAR TO 1ST FLOOR. INSTALL HUNG CEILING. MINOR HVAC DUCT WORK. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
Q00579826-P1
09/01/2022
Special inspection requirement — Ventilation and air distribution system
Cherico King
09/01/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Cherico King
09/01/2022
Special inspection requirement — Energy Code Compliance Inspections
Cherico King
09/01/2022
Special inspection requirement — Final
LAWRENCE MAREK
09/01/2022
Special inspection requirement — Fire-Resistance Rated Construction
Cherico King
09/01/2022
Special inspection requirement — Lighting controls
Cherico King
09/01/2022
Special inspection requirement — Interior lighting power
Cherico King
09/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Cherico King
09/01/2022
Special inspection requirement — Mechanical Systems
Cherico King
08/31/2022
Special inspection requirement — Final
XIONGCAI GU
08/31/2022
Special inspection requirement — Structural Steel - Welding
XIONGCAI GU
08/31/2022
Special inspection requirement — Structural Steel - High Strength Bolting
XIONGCAI GU
08/31/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIONGCAI GU
08/31/2022
Special inspection requirement — Concrete - Cast-In-Place
XIONGCAI GU
08/31/2022
Special inspection requirement — Structural Steel - Details
XIONGCAI GU
05/05/2022
Filed — Alteration
RENOVATE EXISTING ACCESSORY STORAGE SPACE AT CELLAR. REMOVE EXISTING INTERIOR NON LOAD WALLS. INSTALL NEW CONVENIENT STAIR FROM CELLAR TO 1ST FLOOR. INSTALL HUNG CEILING. MINOR HVAC DUCT WORK. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
Q00579826-I1
02/09/2022
Filed — Alteration
MODIFY EXISTING SPRINKLER SYSTEM FROM CELLAR, 1ST FLOOR TO MEZZANINE LEVELS. ADDING AND RELOCATE SPRINKLER HEADS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00661606-I1
08/03/2015
Violation issued (ECB, closed)
Construction
06/17/2015
Violation issued (ECB, closed)
Construction
02/23/2009
Violation issued (ECB, open)
Construction
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCUBE BUILDERS GROUP INC04/26/2024
DOB NOWAntennaSigned-offMIC GEN'L CONTRACTING INC11/17/2023
DOB NOWSprinklersSigned-offARCO PLBG AND HTG INC05/16/2023
DOB NOWMechanical SystemsSigned-offKLE CONSTRUCTION INC03/20/2023
DOB NOWStructuralSigned-offCUBE BUILDERS GROUP INC02/27/2023
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP INC02/27/2023
BISOTISSUEDST SAFETY CONS. INC01/08/2021
BISOTISSUEDSAFETY PRO CONSTRUCTION01/04/2021
BISOTISSUEDCUBE BUILDERS GROUP NY11/04/2020
BISMHISSUEDNIC DESIGN MGMT INC11/30/2017
BIS—ISSUEDHY DESIGN & DEVELOPMENT LLC.11/10/2016
BISOTISSUEDJJ WELL CONSTRUCTION INC05/01/2008
BISMHISSUEDJJ WELL CONSTRUCTION INC08/23/2007
BISOTISSUEDJ&K CONSTRUCTION MGMT04/28/2006
BISOTISSUEDHANG DAR CONSTRUCTION INC08/12/2005
BISMHISSUEDHANG DAR CONSTRUCTION INC.04/11/2005
BISPLISSUEDQMB PLUMBING & HEATING INC02/04/2005
BISPLISSUEDQMB PLUMBING & HEATING INC09/21/2004
BISFPISSUEDNY BUSINESS FIRE SYS. INC.08/20/2004
BIS—ISSUEDHANG DASR CONSTRUCTION INC03/02/2004
2 projects · most recent 07/10/2023
General Wiring
FiledStatusContractorScope
07/10/2023CompleteKJK ELECTRIC INCGeneral Wiring
01/08/2021CompleteA ELECTRICAL MAIN SVC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/17/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/15/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/28/2024Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
07/09/2024Fire-Resistant Penetrations and JointsRoger Tanspecial
07/09/2024Sprinkler SystemsRoger Tanspecial
06/27/2024Sprinkler SystemsRoger Tanspecial
06/27/2024Fire-Resistant Penetrations and JointsRoger Tanspecial
09/13/2022Fire-Resistant Penetrations and JointsCherico Kingspecial
09/13/2022Mechanical SystemsCherico Kingspecial
09/13/2022Structural Stability – Alterations of existing buildingsCherico Kingspecial
09/13/2022FinalLAWRENCE MAREKprogress
09/13/2022Fire-Resistance Rated ConstructionCherico Kingprogress
09/13/2022Energy Code Compliance InspectionsCherico Kingprogress
09/13/2022Lighting controlsCherico Kingenergy_progress
09/13/2022Ventilation and air distribution systemCherico Kingenergy_progress
09/13/2022Interior lighting powerCherico Kingenergy_progress
09/01/2022Ventilation and air distribution systemCherico Kingenergy_progress
09/01/2022Structural Stability – Alterations of existing buildingsCherico Kingspecial
09/01/2022Energy Code Compliance InspectionsCherico Kingprogress
09/01/2022FinalLAWRENCE MAREKprogress
09/01/2022Fire-Resistance Rated ConstructionCherico Kingprogress
09/01/2022Lighting controlsCherico Kingenergy_progress
09/01/2022Interior lighting powerCherico Kingenergy_progress
09/01/2022Fire-Resistant Penetrations and JointsCherico Kingspecial
09/01/2022Mechanical SystemsCherico Kingspecial
08/31/2022FinalXIONGCAI GUprogress
08/31/2022Structural Steel - WeldingXIONGCAI GUspecial
08/31/2022Structural Steel - High Strength BoltingXIONGCAI GUspecial
Latest 25 of 28.
▾Documents — 146 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026Q00579826-P1Request digital key ↗
08/25/2026Q00579826-S1Request digital key ↗
08/25/2026Q00579826-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION11
04/08/2021401393540Open ↗
03/29/2021440657273Open ↗
03/22/2021440657273Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION7
03/25/2021440657273Open ↗
01/04/2021440657273Open ↗
11/04/2020440638525Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications38
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026Q00661606-I1Open ↗
08/28/2026Q00579826-P1Open ↗
08/28/2026Q00579826-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/28/2026Q00579826-P1Open ↗
08/28/2026Q00579826-P1Open ↗
08/28/2026Q00579826-P1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
07/16/2018421568486Open ↗
07/11/2018421568486Open ↗
11/30/2017421568486Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026Q00579826-P1Open ↗
08/25/2026Q00579826-S1Open ↗
08/25/2026Q00579826-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
12/31/2020440657273Open ↗
10/30/2020440638525Open ↗
11/30/2017421568486Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/31/2020440657273Open ↗
10/30/2020440638525Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/31/2020440657273Open ↗
10/30/2020440638525Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/30/2017421568486Open ↗
▸Trade Schedules & Equipment10
▸BISEQUIPMENT USE PERMITS7
06/13/2019421568486Open ↗
07/20/2018421568486Open ↗
07/20/2018421568486Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
06/14/2019421568486Open ↗
07/20/2018421568486Open ↗
07/11/2018421568486Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
10/30/2020440638525Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026Q00579826-P1Open ↗
08/25/2026Q00579826-S1Open ↗
08/25/2026Q00579826-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
12/31/2020440657273Open ↗
10/30/2020440638525Open ↗
11/30/2017421568486Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
12/31/2020440657273Open ↗
12/07/2020440638525Open ↗
11/28/2017421568486Open ↗
▸DOB NOWOER: Notice to Proceed3
08/13/2026Q00579826-I1Open ↗
08/13/2026Q00579826-P1Open ↗
08/13/2026Q00579826-S1Open ↗
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026Q00579826-S1Open ↗
08/13/2026Q00579826-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
03/04/2008410072415Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
04/22/2021440657273Open ↗
01/04/2021440657273Open ↗
12/31/2020440657273Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
04/22/2021440657273Open ↗
12/07/2020440638525Open ↗
07/16/2018421568486Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
07/16/2018421568486Open ↗
07/11/2018421568486Open ↗
11/30/2017421568486Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/31/2020440657273Open ↗
10/30/2020440638525Open ↗
▸BISNYCECC ANALYSIS1
12/31/2020440657273Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00579826-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
04/22/2021440657273Open ↗
01/04/2021440657273Open ↗
12/31/2020440657273Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
06/16/2021440657273Open ↗
12/07/2020440638525Open ↗
06/14/2019421568486Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/16/2018421568486Open ↗
07/11/2018421568486Open ↗
12/01/2017421568486Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
12/30/2015401393540Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/03/2008410072415Open ↗
▸BISSUPERSEDING LETTER1
03/25/2021440657273Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT8
04/22/2021440657273Open ↗
12/31/2020440657273Open ↗
12/07/2020440638525Open ↗
Showing 3 of 8 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
11/09/2016401393540Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION5
06/16/2021440657273Open ↗
03/26/2021440657273Open ↗
02/04/2021440657273Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
03/25/2021440657273Open ↗
06/14/2019421568486Open ↗
07/11/2018421568486Open ↗
▸BISEFILING COVER SHEET2
10/25/2017421568486Open ↗
03/03/2008410072415Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
12/31/2020440657273Open ↗
10/30/2020440638525Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
11/15/2016401393540Open ↗