← Back
BuildNYC
Miscellaneous two family
40 7TH AVENUE
BROOKLYN · Park Slope · BIN 3019288
💬 Discuss this project
1881Year Built
4Stories
B9Building Class
R6AZoning
5,108 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Miscellaneous two family · 1,950 sf lot · 2.62 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
Floor 4Under Construction8p · 1 filing · 20 docs
Floor 3Under Construction7p · 1 filing · 20 docs
Floor 2Under Construction9p · 2 filings · 20 docs
Floor 1Under Construction7p · 1 filing · 20 docs
CellarUnder Construction8p · 1 filing · 20 docs
Sub-BasementUnder Construction7p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Eqedsgn410/14/2026
Carey Ngai Consulting Engineering103/19/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Laszlo Kovacs303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RST RenovationGeneral Contractor308/11/2026
Hunza GCGeneral Contractor204/09/2026
Rka Piping and HeatingPlumbing107/08/2026
Top Plumbing and HeatingPlumbing109/17/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Prudigm Engineering Llcu4304410/14/2026
Edra Engineering & Inspec2820103/19/2026
Building Lifecycle
All (64)Filed (5)Permit Issued (7)Signed Off (1)Violation (9)Objection (30)Special Inspection (12)
10/14/2026
Filed — Alteration
Proposed Duct and Vent Exhaust for Bathroom, Dryer & Cooking range as per plans.
B01309759-P3
10/12/2026
Special inspection requirement — Final
Naeem Anwar
10/12/2026
Special inspection requirement — Mechanical Systems
Naeem Anwar
09/24/2026
Signed off — Alteration
FILING FOR REPAIR OF TIMBER JOISTS ON THE SECOND FLOOR THAT WAS BURNT DUE TO THE NEIGHBORING BUILDING AT THE PARTY WALL AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
B01369926-I1
09/16/2026
Permit issued — Plumbing
B01309759-S1-PL
08/10/2026
Permit issued — Structural
B01369926-I1-ST
07/17/2026
Permit issued — Mechanical Systems
B01309759-S2-MS
05/21/2026
Permit issued — General Construction
B01309759-I1-GC
04/02/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/30/2026
Objection resolved — Addressed
03/26/2026
Objection resolved — Addressed
03/24/2026
Objection resolved — Addressed
03/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
EDWARD RACZKOWSKI
03/23/2026
Objection raised — Admin
03/23/2026
Objection raised — Scope
03/23/2026
Objection raised — Scope
03/23/2026
Objection raised — Scope
03/23/2026
Objection resolved — Addressed
03/23/2026
Objection raised — Cost
03/23/2026
Objection raised — Scope
03/23/2026
Objection resolved — Addressed
03/23/2026
Objection raised — Scope
03/23/2026
Objection raised — Scope
03/19/2026
Filed — Alteration
FILING FOR REPAIR OF TIMBER JOISTS ON THE SECOND FLOOR THAT WAS BURNT DUE TO THE NEIGHBORING BUILDING AT THE PARTY WALL AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS.
B01369926-I1
03/13/2026
Permit issued — Plumbing
B01309759-S1-PL
03/12/2026
Permit issued — General Construction
B01309759-I1-GC
03/12/2026
Permit issued — Mechanical Systems
B01309759-S2-MS
03/10/2026
Special inspection requirement — Structural Wood Frame
Carey Ngai
03/10/2026
Special inspection requirement — Final
Carey Ngai
01/21/2026
Filed — Alteration
Proposed Duct and Vent Exhaust for Bathroom, Dryer & Cooking range as per plans.
B01309759-S2
01/21/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
01/20/2026
Objection raised — Mechanical
01/09/2026
Objection raised — Scope
01/09/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
01/05/2026
Objection resolved — Addressed
12/17/2025
Special inspection requirement — Final
Naeem Anwar
12/17/2025
Special inspection requirement — Mechanical Systems
Naeem Anwar
12/08/2025
Objection raised — Scope
12/08/2025
Objection raised — Scope
12/08/2025
Objection raised — Cost
12/08/2025
Objection raised — Scope
12/08/2025
Objection raised — Scope
12/04/2025
Filed — Alteration
Proposed Duct and Vent Exhaust for Bathroom, Dryer & Cooking range as per plans.
B01309759-S1
12/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
12/01/2025
Filed — Alteration
Proposed Duct and Vent Exhaust for Bathroom, Dryer & Cooking range as per plans.
B01309759-I1
11/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Naeem Anwar
11/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Emmanuel Etrata
11/30/2025
Special inspection requirement — Lighting in dwelling units
Naeem Anwar
11/21/2025
Special inspection requirement — Final
Emmanuel Etrata
10/07/2025
Violation issued (ECB, closed)
Plumbing
10/07/2025
Violation issued (ECB, closed)
Unknown
10/07/2025
Violation issued (ECB, closed)
Construction
05/12/2009
Violation issued (ECB, closed)
Construction
12/21/2006
Violation issued (ECB, closed)
Construction
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedTop Plumbing and Heating09/16/2026
DOB NOWStructuralSigned-offRST Renovation08/10/2026
DOB NOWMechanical SystemsPermit IssuedRST Renovation07/17/2026
DOB NOWGeneral ConstructionPermit IssuedRST Renovation05/21/2026
DOB NOWPlumbingPermit IssuedRka Piping and Heating03/13/2026
DOB NOWGeneral ConstructionPermit IssuedHunza GC03/12/2026
DOB NOWMechanical SystemsPermit IssuedHunza GC03/12/2026
1 project · most recent 10/14/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/14/2026Permit IssuedRST RenovationVentilation Systems
Ventilation
Broan AE80SL 80 CFM · Exhaust Fan ×2
Broan-NuTone AMG03RSS 270 CFM · Kitchen Exhaust ×2
1 project · most recent 10/14/2026
Gas Water/Sanitary
FiledStatusContractorScope
10/14/2026Permit IssuedTop Plumbing and HeatingGas, Water/Sanitary
2 projects · most recent 04/10/2026
General Wiring
FiledStatusContractorScope
04/10/2026CompleteOmd ElectricalGeneral Wiring
11/20/2025Permit IssuedTrinity Metro ElectricalGeneral Wiring
1 project · most recent 03/19/2026
Wood
FiledStatusContractorScope
03/19/2026Signed-offRST RenovationWood
1 project · most recent 10/14/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
10/14/2026Permit IssuedTop Plumbing and HeatingTenant Protection Plan 72 Hour
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
10/12/2026FinalNaeem Anwarprogress
10/12/2026Mechanical SystemsNaeem Anwarspecial
03/24/2026Structural Stability – Alterations of existing buildingsEDWARD RACZKOWSKIspecial
03/10/2026Structural Wood FrameCarey Ngaiprogress
03/10/2026FinalCarey Ngaiprogress
12/17/2025FinalNaeem Anwarprogress
12/17/2025Mechanical SystemsNaeem Anwarspecial
12/04/2025Fire-Resistant Penetrations and JointsNaeem Anwarspecial
11/30/2025Fire-Resistant Penetrations and JointsNaeem Anwarspecial
11/30/2025Energy Code Compliance InspectionsEmmanuel Etrataprogress
11/30/2025Lighting in dwelling unitsNaeem Anwarenergy_progress
11/21/2025FinalEmmanuel Etrataprogress
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026B01309759-I1Request digital key ↗
08/19/2026B01309759-S2Request digital key ↗
08/19/2026B01309759-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits5
▸DOB NOWLPC Approval/Permit5
10/16/2026B01309759-P3Open ↗
08/13/2026B01369926-I1Open ↗
08/13/2026B01309759-S1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature7
10/16/2026B01309759-P3Open ↗
09/23/2026B01309759-S2Open ↗
08/29/2026B01369926-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
10/16/2026B01309759-P3Open ↗
09/23/2026B01309759-S2Open ↗
08/29/2026B01369926-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026B01309759-I1Open ↗
08/19/2026B01309759-S2Open ↗
08/19/2026B01309759-S1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
10/16/2026B01309759-P3Open ↗
08/19/2026B01309759-I1Open ↗
08/19/2026B01309759-S2Open ↗
Showing 3 of 5 on file for this type