← Back
Elevator cooperative
40 BRIGHTON 1 STREET
BROOKLYN · Brighton Beach · BIN 3427285
💬 Discuss this project
1963Year Built
16Stories
D4Building Class
R7-1Zoning
437,860 sfGross Floor Area
448Units
LL97 CoveredRent Stabilized3 Open Violations ▸FDNY Report ↗
Elevator cooperative · Owner of record: 40-50 BRIGHTON FIRSTROAD APTS CORP · 77,620 sf lot · 5.64 FAR built · Flood zone AE
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
RoofUnder Construction8p · 2 filings · 7 docs
Basement2p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VIK XS SERVICES1907/08/2026
SKYLINE SCAFFOLDING GROUP1107/08/2026
BOARD PRESIDENT304/09/2026
40-50 BRIGHTON FIRSTROAD403/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC403/21/2026
NODE ARCHITECTURE,ENGINEERING,CON203/21/2026
AO CONSULTING AND DRAFTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKYLINE SCAFFOLDING GROUPGeneral Contractor1407/08/2026
VIK XS SERVICES INCGeneral Contractor907/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NODE ARCHITECTURE,ENGINEE6799110/02/2025
Building Lifecycle
All (47)Filed (8)Permit Issued (12)Violation (23)Special Inspection (4)
06/17/2026
Violation issued (HPD, open)
B
06/17/2026
Violation issued (HPD, closed)
B
06/17/2026
Violation issued (HPD, closed)
C
06/17/2026
Violation issued (HPD, open)
B
05/05/2026
Permit issued — Sidewalk Shed
B08016929-I1-SH
03/06/2026
Violation issued (HPD, closed)
B
03/06/2026
Violation issued (HPD, closed)
B
12/03/2025
Permit issued — General Construction
B01289531-I1-GC
11/19/2025
Permit issued — Suspended Scaffold
B08018664-S1-SC
11/17/2025
Filed — Alteration
B08018664-S1
10/02/2025
Filed — Alteration
APPLICATION BEING FILED FOR ROOF REPLACEMENT AND REPAIRS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01289531-I1
09/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
Radomir Delic
09/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Radomir Delic
09/18/2025
Special inspection requirement — Final
Radomir Delic
05/20/2025
Violation issued (FDNY_ORDER, closed)
05/01/2025
Permit issued — Supported Scaffold
B08016929-I1-SH
04/17/2025
Permit issued — Protection and Mechanical Methods
B00800197-I1-PMM
03/19/2025
Violation issued (ECB, closed)
Construction
10/28/2024
Violation issued (HPD, closed)
B
10/28/2024
Violation issued (HPD, closed)
C
10/28/2024
Violation issued (HPD, closed)
C
06/13/2024
Violation issued (ECB, closed)
Construction
05/10/2024
Permit issued — Supported Scaffold
B08016929-I1-SH
04/19/2024
Permit issued — Protection and Mechanical Methods
B00800197-I1-PMM
06/20/2023
Violation issued (ECB, closed)
Construction
05/16/2023
Violation issued (ECB, closed)
Unknown
05/16/2023
Violation issued (ECB, closed)
Construction
05/12/2023
Permit issued — Supported Scaffold
B08016929-I1-SH
04/17/2023
Permit issued — Protection and Mechanical Methods
B00800197-I1-PMM
03/31/2023
Violation issued (HPD, closed)
A
02/24/2023
Violation issued (ECB, closed)
Construction
02/16/2023
Filed — Alteration
Installation of a temporarily supported scaffold and heavy-duty sidewalk per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B08016929-P3
01/25/2023
Filed — Alteration
Installation of a temporarily supported scaffold and heavy-duty sidewalk per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B08016929-P2
12/16/2022
Filed — Alteration
Suspended Hanging Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy
B00800197-I1
12/16/2022
Permit issued — Protection and Mechanical Methods
B00800197-I1-PMM
11/10/2022
Violation issued (ECB, open)
Local Law
11/08/2022
Filed — No Work
B00787385-I1
10/28/2022
Filed — Alteration
Installation of a temporarily supported scaffold and heavy-duty sidewalk per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B08016929-P1
10/08/2022
Permit issued — Supported Scaffold
B08016929-I1-SH
10/08/2022
Permit issued — Supported Scaffold
B08016929-I1-SF
10/07/2022
Filed — Alteration
Installation of a temporarily supported scaffold and heavy-duty sidewalk per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B08016929-I1
08/30/2022
Violation issued (ECB, closed)
Elevators
08/03/2022
Special inspection requirement — Public Assembly Emergency Lighting
BERNARD OCASIO
08/02/2021
Violation issued (ECB, closed)
Local Law
06/24/2019
Violation issued (FDNY_NOV, closed)
01/28/2019
Violation issued (ECB, closed)
Local Law
10/26/2011
Violation issued (FDNY_ORDER, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSKYLINE SCAFFOLDING GROUP05/05/2026
DOB NOWGeneral ConstructionPermit IssuedVIK XS SERVICES INC12/03/2025
DOB NOWSuspended ScaffoldPermit IssuedVIK XS SERVICES INC11/19/2025
DOB NOWSupported ScaffoldPermit IssuedSKYLINE SCAFFOLDING GROUP05/01/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedVIK XS SERVICES INC04/17/2025
DOB NOWSupported ScaffoldPermit IssuedSKYLINE SCAFFOLDING GROUP05/10/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedVIK XS SERVICES INC04/19/2024
DOB NOWSupported ScaffoldPermit IssuedSKYLINE SCAFFOLDING GROUP05/12/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedVIK XS SERVICES INC04/17/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedVIK XS SERVICES INC12/16/2022
DOB NOWSupported ScaffoldPermit IssuedSKYLINE SCAFFOLDING GROUP10/08/2022
DOB NOWSupported ScaffoldSigned-offSKYLINE SCAFFOLDING GROUP10/08/2022
2 projects · most recent 09/26/2025
FiledStatusContractorScope
09/26/2025CompleteKINGS ELECTRIC CO., INC.—
10/11/2022Permit IssuedTOP SHELF ELECTRIC CORP—
1 project · most recent 02/16/2023
Scaffold Sidewalk Shed
FiledStatusContractorScope
02/16/2023Permit IssuedSKYLINE SCAFFOLDING GROUPScaffold, Sidewalk Shed
1 project · most recent 10/02/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
10/02/2025Permit IssuedVIK XS SERVICES INCTenant Protection Plan 72 Hour
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
09/18/2025Tenant Protection Plan ComplianceRadomir Delicspecial
09/18/2025Energy Code Compliance InspectionsRadomir Delicprogress
09/18/2025FinalRadomir Delicprogress
08/03/2022Public Assembly Emergency LightingBERNARD OCASIOprogress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
08/28/2026B00800197-I1Request digital key ↗
08/27/2026B08016929-P3Request digital key ↗
08/27/2026B08016929-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/28/2026B00787385-I1Request digital key ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026B08016929-I1Open ↗
08/20/2026B01289531-I1Open ↗
08/13/2026B08016929-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026B00787385-I1Open ↗
08/28/2026B01289531-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B01289531-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/20/2026B01289531-I1Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026B08018664-S1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B08018664-S1Open ↗