← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Debevoise Senior Housing Condominium
40 DEBEVOISE STREET · BIN 3395434
💬 Discuss this project
2018Year Built
8Stories
RMBuilding Class
C4-3Zoning
56,205 sfGross Floor Area
67Units
LL97 CoveredRent Stabilized11 Open Violations ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 10,000 sf lot · 5.62 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 4 docs
Bulkhead3p · 1 filing · 15 docs
Floor 1Under Construction15p · 3 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FOCUS1108/21/2026
CHATEAU GC LLC1907/08/2026
8203 3RD AVE PROPERTY404/09/2026
DEBEVOISE SENIOR HOUSING LP3103/22/2026
SAR PAT ASSOCIATES803/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
G DESIGN DRAFTING1203/21/2026
ATLANTIC BUILDING SUPPLY INC.1003/21/2026
W J PROFESSIONAL EXPEDITING1003/21/2026
AE DESIGN SOLUTION403/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHATEAU GC LLCGeneral Contractor2907/08/2026
EMPIRE NY INSTALLATIONS INCGeneral Contractor407/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor407/08/2026
VAYA RESTORATION INCGeneral Contractor407/08/2026
RRP PLUMBING CORPPlumbing307/08/2026
DVE CONSTRUCTION INCGeneral Contractor208/21/2026
A1 SPECIALIZED, INCScaffold107/08/2026
GUSTAVE DILEO, JR.Electrical103/21/2026
WEN BIN CENElectrical103/21/2026
RRP PLUMBING CORPFire Protection108/21/2026
BYPASS MECHANICAL CORPPlumbing107/08/2026
GRID CITY ELECTRIC, CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
XC ENGINEERING PC9405602/19/2026
METRIC CONSULTING AND INS1803411/05/2020
Building Lifecycle
All (153)Filed (20)Permit Issued (25)Signed Off (6)Violation (60)Inspection (6)Objection (6)Special Inspection (30)
08/20/2026
Permit issued — Sprinklers
B01301750-I1-EW-SP
08/20/2026
Permit issued — Mechanical Systems
B01301741-I1-MS
07/31/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/13/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/05/2026
Violation issued (HPD, closed)
C
03/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
03/23/2026
Special inspection requirement — Sprinkler Systems
XIU CHEN
03/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
XIU CHEN
03/13/2026
Permit issued — Sign
B01363756-I1-SG
03/10/2026
Violation issued (HPD, open)
C
03/10/2026
Violation issued (HPD, open)
C
03/07/2026
Violation issued (HPD, open)
C
03/06/2026
Objection resolved — Addressed
03/05/2026
Objection raised — Cost
03/03/2026
Filed — Alteration
PROPOSE TO INSTALL NEW ILLUMINATED CHANNEL LETTERS ON ALUMINUM RACEWAY FOR EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01363756-I1
02/24/2026
Special inspection requirement — Final
YUNHO LEE
02/19/2026
Filed — Alteration
B01301741-I1
02/09/2026
Violation issued (HPD, closed)
C
02/09/2026
Violation issued (HPD, closed)
C
01/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/27/2026
Violation issued (HPD, closed)
C
01/27/2026
Violation issued (HPD, closed)
B
01/27/2026
Violation issued (HPD, closed)
B
01/22/2026
Special inspection requirement — Lighting controls
XIU CHEN
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
01/22/2026
Special inspection requirement — Maintenance information
XIU CHEN
01/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
XIU CHEN
01/22/2026
Special inspection requirement — Energy Code Compliance Inspections
XIU CHEN
01/22/2026
Special inspection requirement — Interior lighting power
XIU CHEN
01/21/2026
Permit issued — Plumbing
B01301745-I1-PL
01/13/2026
Filed — Alteration
INTERIOR ALTERATION WITHIN EXISTING TENANT SPACE ON 1ST FLOOR IN EXISTINGBUILDING: NEW NON-BEARING INTERIOR PARTITIONS NEW INTERIOR FINISHES NEW MILLWORK NEW LIGHTING FIXTURES. NO CHANGE TO EXISTING ZONING GROUP AND USES.
B01282190-P1
01/13/2026
Special inspection requirement — Lighting controls
XIU CHEN
01/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
01/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
XIU CHEN
01/13/2026
Special inspection requirement — Energy Code Compliance Inspections
XIU CHEN
01/13/2026
Special inspection requirement — Interior lighting power
XIU CHEN
01/13/2026
Special inspection requirement — Maintenance information
XIU CHEN
12/19/2025
Filed — Alteration
INTERIOR ALTERATION WITHIN EXISTING TENANT SPACE ON 1ST FLOOR IN EXISTING BUILDING: MODIFY EXISTING / INSTALL NEW SPRINKLER HEADS PER NEW LAYOUT.
B01301750-P1
12/09/2025
Violation issued (HPD, closed)
B
11/27/2025
Violation issued (HPD, closed)
B
11/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
11/07/2025
Special inspection requirement — Sprinkler Systems
XIU CHEN
11/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
XIU CHEN
10/15/2025
Filed — Alteration
INTERIOR ALTERATION WITHIN EXISTING TENANT SPACE ON 1ST FLOOR IN EXISTING BUILDING: MODIFY EXISTING / INSTALL NEW SPRINKLER HEADS PER NEW LAYOUT.
B01301750-I1
10/15/2025
Filed — Alteration
INTERIOR ALTERATION WITHIN EXISTING TENANT SPACE ON 1ST FLOOR IN EXISTING BUILDING: NEW ELECTRICAL HOT WATER HEATER, NEW PLUMBING FIXTURES PER NEW FLOOR LAYOUT, NEW PLUMBING FIXTURE CALCULATIO,N NEW RESTROOMS
B01301745-I1
10/15/2025
Permit issued — General Construction
B01282190-I1-GC
10/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
XIU CHEN
10/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
10/13/2025
Special inspection requirement — Final
Jing Xie
10/13/2025
Special inspection requirement — Mechanical Systems
XIU CHEN
09/19/2025
Violation issued (HPD, closed)
A
09/11/2025
Filed — Alteration
INTERIOR ALTERATION WITHIN EXISTING TENANT SPACE ON 1ST FLOOR IN EXISTINGBUILDING: NEW NON-BEARING INTERIOR PARTITIONS NEW INTERIOR FINISHES NEW MILLWORK NEW LIGHTING FIXTURES. NO CHANGE TO EXISTING ZONING GROUP AND USES.
B01282190-I1
08/26/2025
Violation issued (HPD, closed)
C
07/14/2025
Violation issued (HPD, open)
B
07/02/2025
Violation issued (HPD, closed)
B
05/28/2025
Violation issued (HPD, open)
B
05/28/2025
Violation issued (HPD, open)
B
05/28/2025
Violation issued (HPD, closed)
C
05/20/2025
Violation issued (HPD, closed)
C
Latest 60 of 153 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedRRP PLUMBING CORP08/20/2026
DOB NOWMechanical SystemsPermit IssuedDVE CONSTRUCTION INC08/20/2026
DOB NOWSignPermit IssuedMAD SIGNS INC03/13/2026
DOB NOWPlumbingSigned-offRRP PLUMBING CORP01/21/2026
DOB NOWGeneral ConstructionPermit IssuedDVE CONSTRUCTION INC10/15/2025
DOB NOWCurb CutSigned-offCHATEAU GC LLC08/19/2021
DOB NOWConstruction FenceSigned-offCHATEAU GC LLC12/11/2020
DOB NOWSupported ScaffoldSigned-offVAYA RESTORATION INC11/25/2020
DOB NOWConstruction FenceSigned-offCHATEAU GC LLC11/04/2020
DOB NOWConstruction FenceSigned-offCHATEAU GC LLC10/02/2020
DOB NOWBoiler EquipmentSigned-offBYPASS MECHANICAL CORP05/20/2020
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC12/20/2019
DOB NOWConstruction FenceSigned-offCHATEAU GC LLC12/17/2019
DOB NOWConstruction FenceSigned-offCHATEAU GC LLC11/12/2019
DOB NOWConstruction FenceSigned-offCHATEAU GC LLC10/03/2019
DOB NOWConstruction FenceSigned-offCHATEAU GC LLC09/24/2019
DOB NOWSupported ScaffoldSigned-offVAYA RESTORATION INC09/13/2019
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC06/26/2019
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I06/05/2019
DOB NOWConstruction FenceSigned-offCHATEAU GC LLC01/07/2019
DOB NOWConstruction FenceSigned-offCHATEAU GC LLC11/07/2018
DOB NOWConstruction FenceSigned-offCHATEAU GC LLC10/02/2018
DOB NOWConstruction FenceSigned-offCHATEAU GC LLC09/13/2018
DOB NOWConstruction FenceSigned-offCHATEAU GC LLC04/16/2018
DOB NOWSidewalk ShedSigned-offEMPIRE NY INSTALLATIONS I03/21/2018
BISPLISSUEDBYPASS MECHANICAL CORP11/09/2020
BIS—ISSUEDCHATEAU GC LLC11/02/2020
BISSPISSUEDPLUMBING WORKS CORP03/02/2020
BIS—ISSUEDCHATEAU GC LLC11/12/2019
BISEQISSUEDSPRING SCAFFOLDING LLC05/17/2019
BISSDISSUEDPLUMBING WORKS CORP09/19/2018
BISPLISSUEDBYPASS MECHANICAL CORP09/13/2018
BIS—ISSUEDCHATEAU GC LLC04/17/2018
BIS—ISSUEDCHATEAU GC LLC04/17/2018
BIS—ISSUEDCHATEAU GC LLC04/16/2018
BISSDISSUEDBLETSAS PLBNG & HTG CORP04/02/2018
BISEQISSUEDABECO CONSTRUCTION LLC08/28/2013
BIS—ISSUEDABECO CONSTRUCTION LLC08/28/2013
BISEQISSUEDBURBERRY BUILDERS LLC05/07/2013
BIS—ISSUEDBURBERRY BUILDERS LLC05/07/2013
+ 5 more permits on file
1 project · most recent 12/19/2025
FiledStatusContractorScope
12/19/2025Permit IssuedRRP PLUMBING CORP40 heads
1 project · most recent 12/19/2025
FiledStatusContractorScope
12/19/2025———
9 projects · most recent 03/17/2026
General Wiring
FiledStatusContractorScope
03/17/2026Permit IssuedVOLTRON ELECTRIC LLC—
12/04/2025CompleteR & T ELECTRICAL CORPGeneral Wiring
03/21/2024Permit IssuedHYLAN DATACOM & ELECL LLC2 meters, 1 new_meters
02/24/2023CompleteAXON ELEC'L CONTRG CORPGeneral Wiring
08/06/2021CompleteGRID CITY ELECTRIC, CORP50 meters, 1 new_meters
02/07/2020CompleteTUXEDO ELEC'L CONTR'G INC—
06/24/2019CompleteTOP SHELF ELECTRIC CORP—
04/26/2019CompleteAXON ELEC'L CONTRG CORP—
03/13/2018CompleteMEGA ELEC'L CONTR'G, INC—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/31/2026Fail-Final General Construction Non-Directive 14FailView ↗
04/13/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/14/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
09/08/2021Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
03/23/2026Fire-Resistant Penetrations and JointsXIU CHENspecial
03/23/2026Sprinkler SystemsXIU CHENspecial
03/23/2026Tenant Protection Plan ComplianceXIU CHENspecial
02/24/2026FinalYUNHO LEEprogress
01/22/2026Lighting controlsXIU CHENenergy_progress
01/22/2026Fire-Resistant Penetrations and JointsXIU CHENspecial
01/22/2026Maintenance informationXIU CHENenergy_progress
01/22/2026Tenant Protection Plan ComplianceXIU CHENspecial
01/22/2026Energy Code Compliance InspectionsXIU CHENprogress
01/22/2026Interior lighting powerXIU CHENenergy_progress
01/13/2026Lighting controlsXIU CHENenergy_progress
01/13/2026Fire-Resistant Penetrations and JointsXIU CHENspecial
01/13/2026Tenant Protection Plan ComplianceXIU CHENspecial
01/13/2026Energy Code Compliance InspectionsXIU CHENprogress
01/13/2026Interior lighting powerXIU CHENenergy_progress
01/13/2026Maintenance informationXIU CHENenergy_progress
11/07/2025Fire-Resistant Penetrations and JointsXIU CHENspecial
11/07/2025Sprinkler SystemsXIU CHENspecial
11/07/2025Tenant Protection Plan ComplianceXIU CHENspecial
10/15/2025Tenant Protection Plan ComplianceXIU CHENspecial
10/15/2025Fire-Resistant Penetrations and JointsXIU CHENspecial
10/13/2025FinalJing Xieprogress
10/13/2025Mechanical SystemsXIU CHENspecial
11/06/2020Heating SystemsSAMI HAJJAR P.Especial
11/06/2020HVAC and service water heating equipment STEVEN KLOCKEenergy_progress
Latest 25 of 30.
▾Documents — 394 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch6
09/03/2026B00026941-I1Request digital key ↗
09/03/2026B00030728-I1Request digital key ↗
08/19/2026B01282190-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold5
09/02/2026B00227549-I1Request digital key ↗
08/15/2026B00227549-P4Request digital key ↗
08/15/2026B00227549-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment4
09/02/2026B00235275-I1Request digital key ↗
08/15/2026B00235275-P1Request digital key ↗
08/15/2026B00235275-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00183429-I1Request digital key ↗
▸Applications & Permits69
▸BISPLAN / WORK APPROVAL APPLICATION42
04/24/2023320912358Open ↗
04/11/2023320195472Open ↗
11/17/2021340567121Open ↗
Showing 3 of 42 on file for this type
▸BISWORK PERMIT APPLICATION24
05/20/2021320912358Open ↗
05/04/2021340810689Open ↗
10/20/2020340674666Open ↗
Showing 3 of 24 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records8
▸BISZONING EXHIBIT I: CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISVERIFY TAX LOT1
03/27/2023320912358Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
07/13/2023320912358Open ↗
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications71
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
01/06/2020320912358Open ↗
04/03/2018321719182Open ↗
03/27/2018320912358Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/03/2026B00004345-I1Open ↗
09/03/2026B00026941-I1Open ↗
09/03/2026B00030728-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026B00235275-P2Open ↗
09/02/2026B00227549-I1Open ↗
08/31/2026B01282190-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026B00235275-P2Open ↗
09/01/2026B01301750-I1Open ↗
08/31/2026B01301745-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/29/2019340674666Open ↗
Showing 1 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
04/29/2021340810689Open ↗
04/29/2019340674666Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
04/29/2021340810689Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment29
▸BISSCHEDULE B - PLUMBING12
08/31/2021320912358Open ↗
08/12/2021320912358Open ↗
07/16/2021320912358Open ↗
Showing 3 of 12 on file for this type
▸BISEQUIPMENT USE PERMITS4
11/04/2021320912358Open ↗
11/04/2021320912358Open ↗
11/04/2021320912358Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
11/04/2021320912358Open ↗
11/04/2021320912358Open ↗
09/23/2021320912358Open ↗
▸BISSPRINKLER INSP REPORT : FP-853
05/07/2019321719191Open ↗
05/07/2019321719191Open ↗
09/21/2018321719191Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
05/25/2021320912358Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
05/04/2023320912358Open ↗
▸BISSPRINKLER/STANDPIPE ELECTRICAL LETTER1
08/18/2021321719191Open ↗
▸BISSTANDPIPE (SD) SIGNOFF1
05/04/2023320912358Open ↗
▸BISSTANDPIPE SYSTEMS1
04/26/2021321719182Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST5
11/24/2021340567121Open ↗
12/10/2018340567121Open ↗
Showing 2 of 5 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
11/24/2021340567121Open ↗
▸BISSTREET TREE SIGNOFF1
03/15/2023320912358Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
11/17/2021340810689Open ↗
08/20/2021321719191Open ↗
05/25/2021320912358Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
03/27/2018320912358Open ↗
03/27/2018320912358Open ↗
03/27/2018320912358Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/15/2023320912358Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00235275-I1Open ↗
▸Inspections & Test Reports42
▸BISTECHNICAL REPORT: RESPONSIBILITY33
11/17/2021340810689Open ↗
09/23/2021320912358Open ↗
09/23/2021320912358Open ↗
Showing 3 of 33 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
06/20/2018320912358Open ↗
03/27/2018320912358Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
07/02/2020320912358Open ↗
Showing 1 of 2 on file for this type
▸BISMASONRY MANUFACTURER'S STATEMENT-FORM 10H1
03/27/2018320912358Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
07/02/2020320912358Open ↗
▸BISHYDRO FLOW TEST LETTER1
09/21/2018321719191Open ↗
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs26
▸BISLETTERS - SUPPORTING DOCUMENTATION10
05/07/2019321719191Open ↗
Showing 1 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
02/12/2021320912358Open ↗
Showing 1 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
11/18/2021340810689Open ↗
09/17/2021321778368Open ↗
08/20/2021321719191Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER2
11/13/2019320912358Open ↗
09/24/2018321719182Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA LETTER OF DEFECT : FD-FALD1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT6
04/29/2021340810689Open ↗
Showing 1 of 6 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
05/25/2021320912358Open ↗
11/13/2019320912358Open ↗
11/08/2018320912358Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
11/17/2021340810689Open ↗
09/17/2021321778368Open ↗
08/18/2021321719191Open ↗
▸BISSTEEL AFFIDAVIT- FINAL1
03/15/2023320912358Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
11/08/2018320912358Open ↗
▸Filing & Intake Forms49
▸BISADDITIONAL INFORMATION33
04/26/2023320912358Open ↗
12/07/2021340567121Open ↗
11/24/2021340567121Open ↗
Showing 3 of 33 on file for this type
▸BISEFILING COVER SHEET13
11/07/2018321077632Open ↗
Showing 1 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
04/29/2021340810689Open ↗
04/29/2019340674666Open ↗
Showing 2 of 3 on file for this type
▸Other Documents14
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION6
11/24/2021340567121Open ↗
06/15/2021320912358Open ↗
02/17/2021321719191Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTax Abatement Miscellaneous1
11/18/2021340810689Open ↗
▸BISPRELIM STL AFF1
03/26/2018320912358Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type