← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
40 EAST 20 STREET
MANHATTAN · Midtown South-Flatiron-Union Square · BIN 1016178
💬 Discuss this project
1911Year Built
7Stories
RMBuilding Class
M1-5MZoning
14,144 sfGross Floor Area
6Units
Rent Stabilized9 Open Violations 8 unresolved · 1 paperwork only ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 2,300 sf lot · 6.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneral
Roof1p · 1 filing · 20 docs
Floor 133p · 4 filings · 20 docs
Cellar45p · 4 filings · 20 docs
Site & exterior16p · 3 filings · 9 docs
Filed — no permit issued11p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WALSAM 40 EAST 201003/21/2026
STEEL SYSTEMS707/08/2026
KING FISH NYC LLC703/22/2026
40 EAST 20TH STREET CONDO203/21/2026
DIAMOND PROPERTIES203/21/2026
DPII203/21/2026
40 EAST 20TH STREET203/21/2026
DYNAMIC BRIDGE LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JEON CONSULTING1309/29/2025
ASHRAF CORP210/10/2022
RLM ENGINEERING PLLC409/30/2022
CATALDO ENGINEERING, P.C.107/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MUHAN SPACE CORPGeneral Contractor707/08/2026
EXCLUSIVE RESTORATION &General Contractor407/08/2026
AP PLUMBING & HVAC LLCPlumbing207/08/2026
CROSSFIELD PLBG.&HTG.CORPFire Protection207/08/2026
STEEL SYSTEMS LLCGeneral Contractor207/08/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
SATELLITE EAST PLBG. INCPlumbing107/08/2026
MICHAEL BAPTISTEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JEON CONSULTING51191109/29/2025
RLM ENGINEERING PLLC6913309/30/2022
Building Lifecycle
All (200)Filed (20)Permit Issued (13)Signed Off (5)Facade (FISP) (18)Violation (60)Inspection (14)Objection (40)Special Inspection (30)
04/29/2026
Violation issued (HPD, open)
A
11/21/2025
Permit issued — Sign
M01219158-I1-SG
11/17/2025
Violation issued (HPD, open)
I
10/15/2025
Signed off — Alteration CO
TO INSTALL NEW KITCHEN & TOILET DUCTS AND REPLACE HVAC SYSTEMS.
M01097240-S3
10/10/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/07/2025
Signed off — Alteration
TO INSTALL 10-F/S, 3-W/C, 3-LAV, 9-SINK, 2-ICE MAKER, 2-DISH WASHER, 1-HWH, 2-GREASE TRAP, 2-F/D, 5-GAS COOKING EQUIPMENT, & 2-ELECTRIC COOKING EQUIPMENT.
M01141636-I1
10/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BENJAMIN JEON
10/07/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
10/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/07/2025
Special inspection requirement — Lighting controls
BENJAMIN JEON
10/07/2025
Special inspection requirement — Interior lighting power
BENJAMIN JEON
10/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BENJAMIN JEON
09/29/2025
Filed — Alteration CO
TO INSTALL NEW KITCHEN & TOILET DUCTS AND REPLACE HVAC SYSTEMS.
M01097240-P5
09/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BENJAMIN JEON
09/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BENJAMIN JEON
09/29/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
09/29/2025
Special inspection requirement — Lighting controls
BENJAMIN JEON
09/29/2025
Special inspection requirement — Interior lighting power
BENJAMIN JEON
09/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
09/17/2025
Filed — Alteration
TO INSTALL NON-ILLUMINATED NON-FLASHING NON-ADVERTISING WALL-MOUNT BUSINESS SIGN.
M01219158-P1
09/12/2025
Filed — Alteration CO
TO INSTALL NEW KITCHEN & TOILET DUCTS AND REPLACE HVAC SYSTEMS.
M01097240-P4
09/09/2025
Objection resolved — Addressed
09/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/07/2025
Filed — Alteration CO
TO INSTALL NEW KITCHEN & TOILET DUCTS AND REPLACE HVAC SYSTEMS.
M01097240-P3
08/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BENJAMIN JEON
08/07/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
08/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/07/2025
Special inspection requirement — Lighting controls
BENJAMIN JEON
08/07/2025
Special inspection requirement — Interior lighting power
BENJAMIN JEON
08/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BENJAMIN JEON
06/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/04/2025
Violation issued (HPD, open)
A
05/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
BENJAMIN JEON
05/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
BENJAMIN JEON
05/28/2025
Special inspection requirement — Energy Code Compliance Inspections
BENJAMIN JEON
05/28/2025
Special inspection requirement — Final
BENJAMIN JEON
05/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
BENJAMIN JEON
05/28/2025
Special inspection requirement — Maintenance information
BENJAMIN JEON
05/28/2025
Special inspection requirement — Mechanical Systems
BENJAMIN JEON
05/28/2025
Special inspection requirement — Shutoff dampers
BENJAMIN JEON
05/28/2025
Special inspection requirement — Duct leakage testing, insulation and design
BENJAMIN JEON
05/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
BENJAMIN JEON
05/13/2025
Filed — Alteration CO
TO INSTALL NEW KITCHEN & TOILET DUCTS AND REPLACE HVAC SYSTEMS.
M01097240-P2
05/13/2025
Objection raised — Other
05/06/2025
Filed — Alteration
TO INSTALL NON-ILLUMINATED NON-FLASHING NON-ADVERTISING WALL-MOUNT BUSINESS SIGN.
M01219158-I1
04/21/2025
Signed off — Alteration CO
TO INSTALL NEW KITCHEN & TOILET DUCTS AND REPLACE HVAC SYSTEMS.
M01097240-S1
04/01/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/27/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/27/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
BENJAMIN JEON
03/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BENJAMIN JEON
03/26/2025
Permit issued — Mechanical Systems
M01097240-S3-MS
03/19/2025
Filed — Alteration CO
TO INSTALL NEW KITCHEN & TOILET DUCTS AND REPLACE HVAC SYSTEMS.
M01097240-P1
02/05/2025
Permit issued — Plumbing
M01141636-I1-PL
02/05/2025
Permit issued — Sprinklers
M01097240-S1-EW-SP
01/09/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/28/2024
Filed — Alteration CO
TO INSTALL NEW KITCHEN & TOILET DUCTS AND REPLACE HVAC SYSTEMS.
M01097240-S3
12/04/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/26/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
Latest 60 of 200 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedNEPTUNE SIGNS&AWNINGS INC11/21/2025
DOB NOWMechanical SystemsSigned-offMUHAN SPACE CORP03/26/2025
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG02/05/2025
DOB NOWSprinklersSigned-offCROSSFIELD PLBG.&HTG.CORP02/05/2025
DOB NOWSprinklersSigned-offCROSSFIELD PLBG.&HTG.CORP11/22/2024
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG11/20/2024
DOB NOWGeneral ConstructionPermit IssuedMUHAN SPACE CORP11/01/2024
DOB NOWGeneral ConstructionPermit IssuedMUHAN SPACE CORP07/22/2024
DOB NOWGeneral ConstructionSigned-offEXCLUSIVE RESTORATION &04/18/2023
DOB NOWGeneral ConstructionSigned-offEXCLUSIVE RESTORATION &12/08/2022
DOB NOWSidewalk ShedPermit IssuedSTEEL SYSTEMS LLC10/12/2022
DOB NOWSupported ScaffoldPermit IssuedSTEEL SYSTEMS LLC10/12/2022
DOB NOWPlumbingSigned-offSATELLITE EAST PLBG. INC03/25/2022
BISFPISSUEDMEGA MECHANICAL INC02/01/2019
BISFPISSUEDJEM FIRE PREVENTION INC06/23/2017
BISOTISSUEDLCS RESTORATION CORP05/18/2017
BISEQISSUEDAM BUILDING RESTORATION*05/10/2017
BISEQISSUEDAM BUILDING RESTORATION*05/10/2017
BISEQISSUEDDYNAMIC INSTALLATION CORP.04/21/2017
BISPLISSUEDEZ RUNER CONSTRUCTION CORP04/19/2017
BISFPISSUEDJEM FIRE PREVENTION INC10/06/2016
BISEQISSUEDARSENAL SCAFFOLD INC08/30/2016
BISEQISSUEDARSENAL SCAFFOLD INC08/29/2016
BISEQISSUEDARSENAL SCAFFOLD INC09/02/2015
BISEQISSUEDARSENAL SCAFFOLD INC09/01/2015
BISPLISSUEDEZ RUNER CONSTRUCTION CORP02/06/2014
BISOTISSUEDGEO CREATE SOLUTIONS INC01/30/2014
BISPLISSUEDDNA PLUMBING CONTR. INC09/26/2012
BISOTISSUEDDNA PLUMBING CONTRACTORS09/26/2012
BISOTISSUEDDNA PLUMBING CONTRACTORS09/23/2011
BISOTISSUEDDNA PLUMBING CONTRACTORS08/29/2011
BISPLISSUEDDNA PLUMBING CONTR. INC08/29/2011
BISSPISSUEDCASE PLUMBING LLC11/15/2005
BIS—ISSUEDORIENTAL CONSTRUCTION LLC10/01/2004
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.08/18/2004
BISPLISSUEDS & L PLUMBING INC08/21/2003
BISPLISSUEDMAINLAND PLBG & HTG INC10/31/2002
BIS—ISSUEDORIENTAL CONSTRUCTION INC07/18/2002
BISFPISSUEDACTIVE FIRE CONTROL CO02/08/2001
BISPLISSUEDDNA PLUMBING CONTR. INC10/12/2000
+ 8 more permits on file
1 project · most recent 09/29/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/29/2025Signed-offMUHAN SPACE CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM60NAM2 60,000 BTU · Condensing Unit ×16
MUZ-GS30NA2 30,000 BTU · Condensing Unit ×4
MXZ-SM48NAM2 48,000 BTU · Condensing Unit ×4
Trane MXZ-SM60NAM2 60,000 BTU · Condensing Unit ×4
MUZ-GS30NA2 30,000 BTU · Condensing Unit ×1
MXZ-SM48NAM2 48,000 BTU · Vrf Outdoor ×1
Ventilation
Trane TPVFYP054AM141A 1,040 CFM · Vrf Indoor ×5
1 project · most recent 09/29/2025
Sprinkler System
FiledStatusContractorScope
09/29/2025Signed-offCROSSFIELD PLBG.&HTG.CORPSprinkler System
3 projects · most recent 07/09/2025
General Wiring
FiledStatusContractorScope
07/09/2025CompleteKYL ELECTRIC LLCGeneral Wiring
08/02/2024CompleteKYL ELECTRIC LLC—
10/07/2022Permit IssuedTOP SHELF ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
10/10/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/01/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/27/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/27/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/09/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/04/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/26/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/05/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
02/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
10/07/2025Fire-Resistant Penetrations and JointsBENJAMIN JEONspecial
10/07/2025Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
10/07/2025Tenant Protection Plan Compliance—special
10/07/2025Lighting controlsBENJAMIN JEONenergy_progress
10/07/2025Interior lighting powerBENJAMIN JEONenergy_progress
10/07/2025Structural Stability – Alterations of existing buildingsBENJAMIN JEONspecial
09/29/2025Fire-Resistant Penetrations and JointsBENJAMIN JEONspecial
09/29/2025Structural Stability – Alterations of existing buildingsBENJAMIN JEONspecial
09/29/2025Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
09/29/2025Lighting controlsBENJAMIN JEONenergy_progress
09/29/2025Interior lighting powerBENJAMIN JEONenergy_progress
09/29/2025Tenant Protection Plan Compliance—special
08/07/2025Fire-Resistant Penetrations and JointsBENJAMIN JEONspecial
08/07/2025Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
08/07/2025Tenant Protection Plan Compliance—special
08/07/2025Lighting controlsBENJAMIN JEONenergy_progress
08/07/2025Interior lighting powerBENJAMIN JEONenergy_progress
08/07/2025Structural Stability – Alterations of existing buildingsBENJAMIN JEONspecial
05/28/2025HVAC-R and service water heating equipmentBENJAMIN JEONenergy_progress
05/28/2025Tenant Protection Plan ComplianceBENJAMIN JEONspecial
05/28/2025Energy Code Compliance InspectionsBENJAMIN JEONprogress
05/28/2025FinalBENJAMIN JEONprogress
05/28/2025HVAC-R and service water heating system controlsBENJAMIN JEONenergy_progress
05/28/2025Maintenance informationBENJAMIN JEONenergy_progress
05/28/2025Mechanical SystemsBENJAMIN JEONspecial
Latest 25 of 49.
▾Documents — 267 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
09/02/2026M00688114-I1Request digital key ↗
09/02/2026M00688114-P1Request digital key ↗
09/02/2026M00772538-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits53
▸BISPLAN / WORK APPROVAL APPLICATION18
03/07/2025123081645Open ↗
03/07/2025140639726Open ↗
03/07/2025140639717Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION18
01/28/2019140829263Open ↗
07/07/2017140559205Open ↗
05/09/2017140639726Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWLPC Approval/Permit17
09/02/2026M00688114-I1Open ↗
08/23/2026M01097240-P5Open ↗
08/23/2026M01097240-P3Open ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications84
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/02/2026M00688114-I1Open ↗
09/01/2026M08018164-I1Open ↗
09/01/2026M08018145-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/26/2026M00688864-I1Open ↗
09/12/2026M00688864-P2Open ↗
08/28/2026M01097240-S1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
09/27/2017140397247Open ↗
09/27/2017140397023Open ↗
06/28/2017122550024Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/26/2026M00688864-I1Open ↗
09/19/2026M00688114-I1Open ↗
09/12/2026M00688864-P2Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
01/28/2019140829263Open ↗
05/09/2017140639726Open ↗
05/09/2017140639717Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
01/28/2019140829263Open ↗
05/09/2017140639726Open ↗
05/09/2017140639717Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
01/28/2019140829263Open ↗
05/09/2017140639726Open ↗
05/09/2017140639717Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
04/26/2017123081645Open ↗
10/26/2015122550024Open ↗
01/27/2014121895814Open ↗
▸Trade Schedules & Equipment6
▸BISSELF-CERT PLUMBING NOTICE3
04/07/2014121895814Open ↗
04/11/2013120727366Open ↗
03/14/2013120727366Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
10/24/2016121895814Open ↗
01/22/2014121895814Open ↗
▸BISSCHEDULE B - PLUMBING1
06/21/2011120727366Open ↗
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist4
08/23/2026M01097240-P5Open ↗
08/23/2026M01097240-P4Open ↗
08/23/2026M01097240-P3Open ↗
Showing 3 of 4 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES3
05/09/2017140639726Open ↗
05/09/2017140639717Open ↗
04/26/2017123081645Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026M01097240-I1Open ↗
▸Environmental & Asbestos23
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/02/2026M00688114-I1Open ↗
08/26/2026M01072421-I1Open ↗
08/26/2026M01072421-P1Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
01/28/2019140829263Open ↗
08/31/2015140397247Open ↗
01/22/2014121895814Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
06/21/2011120727366Open ↗
05/27/2011120702597Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
05/25/2017122550024Open ↗
▸Energy Compliance7
▸BISTR8: Energy Code Progress Inspections2
01/27/2014121895814Open ↗
12/28/2012120727366Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
06/28/2017122550024Open ↗
10/26/2015122550024Open ↗
▸BISEN2 - As Built Energy Analysis2
12/27/2012120727366Open ↗
06/28/2017122550024Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/31/2015140397023Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY6
02/01/2019140829263Open ↗
01/28/2019140829263Open ↗
05/09/2017140639726Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSOIL REPORT4
08/23/2026M01097240-P3Open ↗
08/23/2026M01097240-P4Open ↗
08/23/2026M01097240-P5Open ↗
Showing 3 of 4 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
02/25/2025140639717Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/14/2026M01097240-I1Open ↗
▸Approvals, Objections & Sign-offs25
▸BISLANDMARKS APPROVAL11
01/28/2019140829263Open ↗
06/28/2017122550024Open ↗
05/09/2017140639726Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
03/06/2025123081645Open ↗
03/06/2025140639717Open ↗
09/27/2017140397247Open ↗
Showing 3 of 6 on file for this type
▸BISLANDMARKS SIGNOFF3
02/27/2025140639726Open ↗
02/27/2025140639717Open ↗
02/25/2025123081645Open ↗
▸BISFINAL2
02/25/2025140639726Open ↗
02/25/2025140639717Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
06/21/2011120727366Open ↗
05/27/2011120702597Open ↗
▸BISSHED LETTER1
09/21/2016140397023Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
01/28/2019140829263Open ↗
06/28/2017122550024Open ↗
10/24/2016121895814Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms14
▸BISEFILING JOB APPLICATION COVER SHEET6
01/28/2019140829263Open ↗
05/09/2017140639726Open ↗
05/09/2017140639717Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET5
04/26/2017123081645Open ↗
10/26/2015122550024Open ↗
01/22/2014121895814Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
09/27/2017140397247Open ↗
09/27/2017140397023Open ↗
▸BISADDITIONAL INFORMATION1
04/26/2017123081645Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/23/2026M01097240-P4Open ↗
08/23/2026M01097240-P3Open ↗
08/23/2026M01097240-P5Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/05/2016140559205Open ↗