Condo, residential tower (mixed-use, multi-family elevator) [derived]
40 EAST 21 STREET
MANHATTAN · Midtown South-Flatiron-Union Square · BIN 1085465
💬 Discuss this project
1907Year Built
11Stories
RMBuilding Class
M1-5MZoning
16,922 sfGross Floor Area
12Units
Rent Stabilized7 Open Violations ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 40/21 CORPORATION · 2,300 sf lot · 7.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalFire ProtectionEquipmentCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 2 docs
Floor 115p · 1 filing · 15 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 14p · 1 filing · 3 docs
Site & exterior5p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
40 21 HOLDING903/21/2026
THE 40/21 CONDOMINIUM603/21/2026
BELLET CONSTRUCTION CO INC503/22/2026
RENNON CONSTRUCTION503/22/2026
PYRAMID RESTORATION NY209/13/2026
EQUITIES TIME203/22/2026
GARCIA103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
INGA OREN ARCHITECT, P.C.308/02/2023
ASHRAF CORP104/20/2022
ENTHINK ENGINEERS LLC101/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ISTAY CONSULTING603/21/2026
RENNON CONSTRUCTION103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RE-BRICK CONSTRUCTION INCGeneral Contractor303/21/2026
VOLTAGE ELECTRIC CORPElectrical203/22/2026
RENNON CONSTRUCTION CORPGeneral Contractor203/21/2026
GREGORY PAPANTONIOUElectrical103/21/2026
LADIKOS, DIMITRIOSElectrical103/21/2026
MP & L METAL INCElectrical103/21/2026
BEKKERMAN, MIKHAILElectrical103/21/2026
DOUG'S PLBG & HTG SERV COFire Protection107/08/2026
CITI CONTRACTING OF NEW YGeneral Contractor107/08/2026
VINCENT VERDEROSAElectrical103/21/2026
DREYFUS, ARTHURElectrical103/21/2026
GRANDERSON, MERVYNElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MIKE POLYCHRONIADES8407208/02/2023
STEEL CORE ENGINEERING PL1098104/19/2023
Building Lifecycle
All (73)Filed (6)Permit Issued (5)Signed Off (3)Facade (FISP) (15)Violation (36)Inspection (2)Special Inspection (6)
04/02/2026
Permit issued — Suspended Scaffold
M01378714-I1-SC
03/26/2026
Filed — Alteration
inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Diego Buri Cumbe
M01378714-I1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/14/2023
Signed off — Alteration
Modification of the existing sprinkler system. Provide 2 new concealed sprinkler heads and piping. Remove existing 1" pipe back to main and provide new fittings and piping as required. All existing sprinkler heads to remain.
M00856172-I1
12/12/2023
Signed off — Alteration
Modification of the existing sprinkler system. Provide 2 new concealed sprinkler heads and piping. Remove existing 1" pipe back to main and provide new fittings and piping as required. All existing sprinkler heads to remain.
M00856172-S1
08/03/2023
Special inspection requirement — Sprinkler Systems
mike polychroniades
08/02/2023
Filed — Alteration
Modification of the existing sprinkler system. Provide 2 new concealed sprinkler heads and piping. Remove existing 1" pipe back to main and provide new fittings and piping as required. All existing sprinkler heads to remain.
M00856172-P1
07/24/2023
Special inspection requirement — Sprinkler Systems
mike polychroniades
06/15/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/12/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/24/2023
Permit issued — Sprinklers
M00856172-S1-EW-SP
05/22/2023
Permit issued — General Construction
M00856172-I1-GC
05/08/2023
Filed — Alteration
Modification of the existing sprinkler system. Provide 2 new concealed sprinkler heads and piping. Remove existing 1" pipe back to main and provide new fittings and piping as required. All existing sprinkler heads to remain.
M00856172-S1
04/19/2023
Filed — Alteration
Modification of the existing sprinkler system. Provide 2 new concealed sprinkler heads and piping. Remove existing 1" pipe back to main and provide new fittings and piping as required. All existing sprinkler heads to remain.
M00856172-I1
04/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
04/10/2023
Special inspection requirement — Energy Code Compliance Inspections
Alexander Sheyman
04/10/2023
Special inspection requirement — Lighting in dwelling units
Alexander Sheyman
04/06/2023
Special inspection requirement — Final
Alexander Sheyman
03/08/2023
Signed off — Alteration
INSTALLATION OF 25' NEW SIDEWALK SHED AT 40 E 21st STREET AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
M00720186-I1
08/23/2022
Cycle 9 facade report submitted
08/23/2022
Cycle 9 facade report signed — SAFE
08/17/2022
Cycle 9 facade inspection completed
04/21/2022
Permit issued — Sidewalk Shed
M00720186-I1-SH
04/20/2022
Filed — Alteration
INSTALLATION OF 25' NEW SIDEWALK SHED AT 40 E 21st STREET AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
M00720186-I1
02/22/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/18/2022
Permit issued — Sidewalk Shed
M00661680-I1-SH
01/13/2022
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00661680-I1
09/07/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/16/2021
Violation issued (HPD, closed)
A
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/26/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/26/2017
Cycle 8 facade report submitted
09/26/2017
Cycle 8 facade inspection completed
09/26/2017
Cycle 8 facade report signed — SAFE
08/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/18/2017
Cycle 8 facade report signed — SWARMP
02/21/2017
Cycle 8 facade report submitted
02/04/2017
Cycle 8 facade inspection completed
01/03/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/11/2013
Violation issued (ECB, closed)
Elevators
06/06/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/05/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/17/2012
Cycle 7 facade report submitted
02/13/2012
Cycle 7 facade report signed — SAFE
01/13/2012
Cycle 7 facade inspection completed
12/17/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/18/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/10/2008
Violation issued (ECB, closed)
Elevators
06/04/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/10/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/19/2007
Cycle 6 facade report submitted
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/17/2007
Cycle 6 facade report signed — SWARMP
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/03/2005
Cycle 6 facade inspection completed
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY04/02/2026
DOB NOWSprinklersSigned-offDOUG'S PLBG & HTG SERV CO05/24/2023
DOB NOWGeneral ConstructionSigned-offCITI CONTRACTING OF NEW Y05/22/2023
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP04/21/2022
DOB NOWSidewalk ShedPermit IssuedRE-BRICK CONSTRUCTION INC02/18/2022
BISPLISSUEDGO GREENER PLUMBING LLC02/04/2019
BISMHISSUEDA. BONADUCE, INC01/28/2019
BISOTISSUEDA. BONADUCE, INC01/28/2019
BISPLISSUEDEBM PLUMBING CORP11/07/2018
BISMHISSUEDA&L CONSTRUCTION SRVCS09/21/2018
BISOTISSUEDKM POSIDON CORP08/25/2017
BISEQISSUEDEVEREST SCAFFOLDING INC09/29/2016
BISPLISSUEDSAFETY PLMBG & HTG LLC07/16/2014
BISOTISSUEDBETON BUILDERS INC06/19/2014
BISEQISSUEDEVEREST SCAFFOLDING INC08/10/2011
BISPLISSUEDPAUL QUINN PLBG & HTG INC12/20/2002
BISPLISSUEDARMON MECHANICAL INC12/14/1999
BISOTISSUEDDDC SREVICE, INC.11/19/1999
BISEQISSUEDROCKLEDGE SCAFFOLD CORP03/16/1999
BISEQISSUEDROCKLEDGE SCAFFOLD CORP07/15/1998
BISMHISSUEDSADDLER RIVER SERVICES INC07/30/1997
BISPLRE-ISSUEDK.M.D MECHANICAL 1443 LLC09/05/1996
BIS—ISSUEDVIKING RENOVATION CORP04/23/1996
8 projects · most recent 06/04/2023
General Wiring
FiledStatusContractorScope
06/04/2023CompleteARMA ELECTRIC INC—
04/27/2022Permit IssuedHIGH QUALITY ELECTRIC OF—
01/13/2022Permit IssuedRICHARD NEU—
02/05/2020CompleteVOLTAGE ELECTRIC CORP—
02/06/2019Permit IssuedPHILIP A. ROBINSONGeneral Wiring
11/05/2018CompleteVOLTAGE ELECTRIC CORPGeneral Wiring
10/03/2018CompleteVOLTAGE ELECTRIC CORP—
09/07/2018CompleteVOLTAGE ELECTRIC CORP—
1 project · most recent 01/13/2022
Sidewalk Shed
FiledStatusContractorScope
01/13/2022Permit IssuedRE-BRICK CONSTRUCTION INCSidewalk Shed
1 project · most recent 03/26/2026
FiledStatusContractorScope
03/26/2026Permit IssuedSTREAMLINE CONSULTANTS NY—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/15/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/12/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/03/2023Sprinkler Systemsmike polychroniadesspecial
07/24/2023Sprinkler Systemsmike polychroniadesspecial
04/10/2023Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
04/10/2023Energy Code Compliance InspectionsAlexander Sheymanprogress
04/10/2023Lighting in dwelling unitsAlexander Sheymanenergy_progress
04/06/2023FinalAlexander Sheymanprogress
▾Documents — 158 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/06/2026M01378714-I1Request digital key ↗
09/03/2026M00661680-I1Request digital key ↗
09/02/2026M00720186-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits22
▸BISWORK PERMIT APPLICATION12
02/04/2019123483943Open ↗
01/28/2019123483943Open ↗
01/28/2019123483943Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
01/25/2019123483943Open ↗
01/25/2019123483943Open ↗
06/06/2018123568308Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWLPC Approval/Permit1
08/13/2026M00856172-I1Open ↗
▸Seals & Professional Certifications42
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
08/19/2019123568308Open ↗
08/19/2019123568308Open ↗
01/25/2019123483943Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
01/25/2019123483943Open ↗
01/25/2019123483943Open ↗
08/28/2017123303861Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
01/25/2019123483943Open ↗
01/25/2019123483943Open ↗
08/28/2017123303861Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/03/2026M00661680-I1Open ↗
09/02/2026M00720186-I1Open ↗
08/31/2026M00856172-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026M00856172-P1Open ↗
08/24/2026M00856172-I1Open ↗
08/22/2026M00856172-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026M00856172-I1Open ↗
08/24/2026M00856172-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/28/2016140556351Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/28/2016140556351Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/17/2011120789450Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
01/25/2019123483943Open ↗
06/06/2018123568308Open ↗
06/24/2014122042850Open ↗
▸BISEQUIPMENT USE PERMITS2
09/18/2015122042850Open ↗
09/01/2015122042850Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
02/11/2015122042850Open ↗
12/09/2014122042850Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
09/18/2015122042850Open ↗
09/01/2015122042850Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
10/05/2021123483943Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
10/05/2021123483943Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes4
01/25/2019123483943Open ↗
06/06/2018123568308Open ↗
08/28/2017123303861Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
01/25/2019123483943Open ↗
06/06/2018123568308Open ↗
08/28/2017123303861Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/31/2026M00856172-S1Open ↗
08/13/2026M00856172-P1Open ↗
08/13/2026M00856172-I1Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
08/19/2019123568308Open ↗
01/25/2019123483943Open ↗
01/25/2019123483943Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
08/19/2019123568308Open ↗
10/03/2017123303861Open ↗
09/18/2015122042850Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/06/2021123483943Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
10/06/2021123483943Open ↗
▸BISELECTRIC MOTORS1
10/05/2021123483943Open ↗
▸BISLIGHTING CONTROLS1
10/05/2021123483943Open ↗
▸BIS* HVAC INSULATION AND SEALING1
10/05/2021123483943Open ↗
▸BISINTERIOR LIGHTING POWER1
10/05/2021123483943Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/30/2020102435438Open ↗
09/28/2016140556351Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/05/2021123483943Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
10/05/2021123483943Open ↗
▸BISMECHANICAL SYSTEMS1
10/05/2021123483943Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
10/03/2017123303861Open ↗
▸Approvals, Objections & Sign-offs17
▸BISLANDMARKS APPROVAL7
08/19/2019123568308Open ↗
01/25/2019123483943Open ↗
08/08/2018123568308Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
10/06/2021123483943Open ↗
11/30/2020102435438Open ↗
08/19/2019123568308Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL1
10/05/2021123483943Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/17/2011120789450Open ↗
▸BISLANDMARKS SIGNOFF1
10/05/2021123483943Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M00661680-I1Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT11
11/30/2020102435438Open ↗
08/19/2019123568308Open ↗
01/25/2019123483943Open ↗
Showing 3 of 11 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
10/06/2021123483943Open ↗
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET5
01/25/2019123483943Open ↗
01/25/2019123483943Open ↗
06/06/2018123568308Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
08/19/2019123568308Open ↗
02/04/2019123483943Open ↗
10/03/2017123303861Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
09/28/2016140556351Open ↗
08/17/2011120789450Open ↗
▸BISADDITIONAL INFORMATION1
09/09/2014122042850Open ↗
▸Other Documents2
▸BISSupporting Document: Fee Exempt1
06/30/2014122042850Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01378714-I1Open ↗