← Back
Cape Cod
40 GOVERNOR ROAD
STATEN ISLAND · Westerleigh-Castleton Corners · BIN 5009507
💬 Discuss this project
1950Year Built
1.5Stories
A0Building Class
R2Zoning
1,200 sfGross Floor Area
1Units
Cape Cod · 4,410 sf lot · 0.27 FAR built · Flood zone X
Locations of Work
Electrical
Roof2p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR204/24/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524104/24/2025
MXV SIA LLC9281103/08/2024
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (5)
06/13/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 31 Panels, 12.71 kW
S01011465-I1
05/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
05/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
05/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
05/29/2025
Special inspection requirement — Final
Mina Makar
05/29/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
04/24/2025
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 31 Panels, 12.71 kW
S01011465-P1
03/18/2024
Permit issued — Solar
S01011465-I1-SL
03/08/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 31 Panels, 12.71 kW
S01011465-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR03/18/2024
2 projects · most recent 03/04/2025
FiledStatusContractorScope
03/04/2025Permit IssuedCONTROL ELEC'L CONT'G COR1 meters, 1 new_meters
04/16/2024CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/29/2025Fire-Resistant Penetrations and JointsMina Makarspecial
05/29/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
05/29/2025Energy Code Compliance InspectionsMina Makarprogress
05/29/2025FinalMina Makarprogress
05/29/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026S01011465-I1Request digital key ↗
08/21/2026S01011465-P1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026S01011465-I1Open ↗
08/13/2026S01011465-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026S01011465-I1Open ↗
09/01/2026S01011465-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026S01011465-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026S01011465-I1Open ↗
08/13/2026S01011465-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01011465-I1Open ↗