← Back
Two stories - detached, small or mid-size
40 LAUREL AVENUE
STATEN ISLAND · Tompkinsville-Stapleton-Clifton-Fox Hills · BIN 5014422
💬 Discuss this project
1899Year Built
2Stories
A1Building Class
R3AZoning
1,040 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,501 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 14 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR201/19/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281201/19/2026
Building Lifecycle
All (17)Filed (2)Permit Issued (1)Special Inspection (14)
01/20/2026
Permit issued — Solar
S01344678-I1-SL
01/20/2026
Special inspection requirement — Adhesive-Based Solar Pedestal Bonding Systems
Mina Makar
01/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
01/20/2026
Special inspection requirement — Post-installed Anchors
Mina Makar
01/20/2026
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
01/20/2026
Special inspection requirement — Final
Mina Makar
01/20/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
01/19/2026
Filed — Alteration
installation of solar panels, rooftop, railed, grid-tied, 6 modules, 2.46 KW
S01344678-P1
01/19/2026
Special inspection requirement — Adhesive-Based Solar Pedestal Bonding Systems
Mina Makar
01/19/2026
Special inspection requirement — Post-installed Anchors
Mina Makar
01/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
01/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
01/19/2026
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
01/19/2026
Special inspection requirement — Final
Mina Makar
01/19/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
01/09/2026
Filed — Alteration
installation of solar panels, rooftop, railed, grid-tied, 6 modules, 2.46 KW
S01344678-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedMOMENTUM SOLAR01/20/2026
1 project · most recent 01/09/2026
FiledStatusContractorScope
01/09/2026CompleteISLAND ELECTRIC CORP—
1 project · most recent 01/19/2026
FiledStatusContractorScope
01/19/2026Permit IssuedMOMENTUM SOLAR12 panels, 4.92 kw, 106 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
01/20/2026Adhesive-Based Solar Pedestal Bonding SystemsMina Makarspecial
01/20/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
01/20/2026Fire-Resistant Penetrations and JointsMina Makarspecial
01/20/2026Post-installed AnchorsMina Makarspecial
01/20/2026Energy Code Compliance InspectionsMina Makarprogress
01/20/2026FinalMina Makarprogress
01/20/2026Air barrier - visual inspectionMina Makarenergy_progress
01/19/2026Adhesive-Based Solar Pedestal Bonding SystemsMina Makarspecial
01/19/2026Post-installed AnchorsMina Makarspecial
01/19/2026Fire-Resistant Penetrations and JointsMina Makarspecial
01/19/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
01/19/2026Energy Code Compliance InspectionsMina Makarprogress
01/19/2026FinalMina Makarprogress
01/19/2026Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026S01344678-P1Request digital key ↗
08/17/2026S01344678-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWSpecial Inspector Seal & Signature6
08/26/2026S01344678-P1Open ↗
08/26/2026S01344678-P1Open ↗
08/26/2026S01344678-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/26/2026S01344678-P1Open ↗
08/26/2026S01344678-P1Open ↗
08/23/2026S01344678-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026S01344678-P1Open ↗
08/17/2026S01344678-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026S01344678-I1Open ↗
08/17/2026S01344678-P1Open ↗