← Back
BuildNYC
Two stories - detached, small or mid-size
40 MAGNOLIA AVENUE
STATEN ISLAND · BIN 5174783
💬 Discuss this project
2021Year Built
2Stories
A1Building Class
R3XZoning
1,584 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,300 sf lot · 0.48 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Attic1 filing · 2 docs
Floor 25p · 2 filings · 6 docs
Floor 1JRB 9' Curb Cut Installation6p · 3 filings · 8 docs
Sub-Basement5p · 2 filings · 6 docs
Site & exteriorProposed 8' construction fence1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Riderallc1003/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Lobue & Valenziano401/06/2022
A Tech Engineering NYC104/23/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LO Bue Valenziano AIA803/21/2026
A Tech Engineering NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Palermo ConstructionGeneral Contractor203/21/2026
Palermo ConstructionScaffold203/21/2026
JB Buzco PlumbingPlumbing207/08/2026
Building Lifecycle
01/24/2022
Signed off — Alteration
INSTALLATION OF 9' CURB CUT FOR 40 MAGNOLIA AVENUE.
S00568725-I1
01/24/2022
Signed off — Alteration
INSTALLATION OF PIPING AND PLUMBING FIXTURES FOR A TWO FAMILY DWELLING.
S00520780-I1
01/18/2022
Signed off — Alteration
Installation of new fire sprinkler system with valves and meters for same. Filed in conjunction with new building application # 540184094.
S00428068-I1
01/10/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/06/2022
Filed — Alteration
INSTALLATION OF PIPING AND PLUMBING FIXTURES FOR A TWO FAMILY DWELLING.
S00520780-P1
17 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offPalermo Construction08/18/2021
DOB NOWPlumbingSigned-offJB Buzco Plumbing05/14/2021
DOB NOWPlumbingSigned-offJB Buzco Plumbing05/14/2021
DOB NOWConstruction FenceSigned-offPalermo Construction12/23/2020
BIS—ISSUEDPalermo Construction12/01/2021
1 project · most recent 08/03/2021
General Wiring
FiledStatusContractorScope
08/03/2021CompleteB & R Electrical ContractingGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/10/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
07/22/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/22/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/26/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
51 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account