← Back
Elevator apt, semi-fireproof with stores
40 PRINCE STREET
MANHATTAN · BIN 1079948
💬 Discuss this project
1900Year Built
7Stories
D7Building Class
C6-2Zoning
45,990 sfGross Floor Area
27Units
Rent Stabilized6 Open Violations 4 unresolved · 2 paperwork only ▸FISP: SAFE
Elevator apt, semi-fireproof with stores · Owner of record: D K PROPERTY INC · 9,085 sf lot · 5.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof1p · 1 filing · 5 docs
Floor 32p · 2 filings · 20 docs
Floor 23p · 2 filings · 20 docs
Floor 1
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
D K PROPERTY7207/08/2026
OWNERS REP507/08/2026
D K PROPERTY INC ANDREWS103/22/2026
D K PROPERTIES2703/22/2026
OWNER OF 40 PRINCE ST303/22/2026
345 WEST 4TH - 306 WEST 13TH OWNERS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AR ARCHITECTURE DPC611/10/2025
JOHN D NAKROSIS JR BLDG DESIGN510/07/2024
FMO ENGINEERING PC109/26/2023
PAUL PERDEK, PROF. ENG. PLLC204/21/2022
MRCE104/30/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOYD CONSULTING203/21/2026
AR ARCHITECTURE DPC403/21/2026
AE DESIGN SOLUTION403/21/2026
JOHN D NAKROSIS JR BLDG DESIGN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DEMAR MECHANICAL INCPlumbing307/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor207/08/2026
JBJ CONCRETE RENOVATIONSGeneral Contractor203/21/2026
CITY GAS HTG SVC CO INCPlumbing207/08/2026
RE-CON ELECTRIC INCElectrical103/22/2026
TCR RESTORATION & CONST*General Contractor107/08/2026
D.K. PROPERTY, INCGeneral Contractor107/08/2026
EVERLAST SOLUTIONS CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983111/10/2025
MURRAY ENGINEERING PC14341010/14/2025
AR ARCHITECTURE DPC6643105/15/2025
EMPIRE DESIGN CORP5474205/29/2024
FMO ENGINEERING PC1798109/26/2023
Building Lifecycle
All (147)Filed (16)Permit Issued (12)Signed Off (7)Facade (FISP) (20)Violation (59)Inspection (8)Special Inspection (25)
05/06/2026
Signed off — Alteration
Repl. exist. boilers/h.w. heaters (< 350 MBtu/h) in new boiler rms. to serve Apts. 2C, 3B, 3C. Repair gas line to Apt. 2C from meter in cel. only; exist. gas risers to remain. No change in use, egress or occ.
M00509354-S2
04/23/2026
Signed off — Alteration
Repl. exist. boilers/h.w. heaters (< 350 MBtu/h) in new boiler rms. to serve Apts. 2C, 3B, 3C. Repair gas line to Apt. 2C from meter in cel. only; exist. gas risers to remain. No change in use, egress or occ.
M00509354-I1
04/23/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/19/2026
Signed off — Alteration
Repl. exist. boilers/h.w. heaters (< 350 MBtu/h) in new boiler rms. to serve Apts. 2C, 3B, 3C. Repair gas line to Apt. 2C from meter in cel. only; exist. gas risers to remain. No change in use, egress or occ.
M00509354-S4
01/19/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/15/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/25/2025
Permit issued — Boiler Equipment
M00509354-S4-BE
11/10/2025
Filed — Alteration
Repl. exist. boilers/h.w. heaters (< 350 MBtu/h) in new boiler rms. to serve Apts. 2C, 3B, 3C. Repair gas line to Apt. 2C from meter in cel. only; exist. gas risers to remain. No change in use, egress or occ.
M00509354-S4
11/01/2025
Special inspection requirement — Heating Systems
MARISA HARTE
10/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/14/2025
Filed — Alteration
Repl. exist. boilers/h.w. heaters (< 350 MBtu/h) in new boiler rms. to serve Apts. 2C, 3B, 3C. Repair gas line to Apt. 2C from meter in cel. only; exist. gas risers to remain. No change in use, egress or occ.
M00509354-P6
10/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Murray
10/12/2025
Special inspection requirement — Energy Code Compliance Inspections
John Nakrosis
10/07/2025
Filed — Alteration
Repl. exist. boilers/h.w. heaters (< 350 MBtu/h) in new boiler rms. to serve Apts. 2C, 3B, 3C. Repair gas line to Apt. 2C from meter in cel. only; exist. gas risers to remain. No change in use, egress or occ.
M00509354-P5
10/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Murray
10/02/2025
Special inspection requirement — Energy Code Compliance Inspections
John Nakrosis
09/29/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/15/2025
Filed — Alteration
Repl. exist. boilers/h.w. heaters (< 350 MBtu/h) in new boiler rms. to serve Apts. 2C, 3B, 3C. Repair gas line to Apt. 2C from meter in cel. only; exist. gas risers to remain. No change in use, egress or occ.
M00509354-P4
09/05/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/25/2025
Permit issued — Plumbing
M00509354-I1-PL
07/08/2025
Permit issued — General Construction
M00509354-S2-GC
05/15/2025
Filed — Alteration
Repl. exist. boilers/h.w. heaters (< 350 MBtu/h) in new boiler rms. to serve Apts. 2C, 3B, 3C. Repair gas line to Apt. 2C from meter in cel. only; exist. gas risers to remain. No change in use, egress or occ.
M00509354-S2
05/15/2025
Special inspection requirement — Final
Arthur Rabinovich
05/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Arthur Rabinovich
05/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
Arthur Rabinovich
05/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
Arthur Rabinovich
05/01/2025
Cycle 9 facade report signed — SAFE
03/28/2025
Cycle 9 facade report submitted
03/24/2025
Signed off — Alteration
Limited repair of the east, west, and south facades. No change in use, egress, or occupancy.
M00928110-I1
03/06/2025
Cycle 9 facade inspection completed
12/28/2024
Cycle 9 facade report submitted
12/16/2024
Cycle 9 facade report signed — UNSAFE
12/11/2024
Cycle 9 facade inspection completed
10/23/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/07/2024
Filed — Alteration
Repl. exist. boilers/h.w. heaters (< 350 MBtu/h) in new boiler rms. to serve Apts. 2C, 3B, 3C. Repair gas line to Apt. 2C from meter in cel. only; exist. gas risers to remain. No change in use, egress or occ.
M00509354-P3
09/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Murray
09/27/2024
Special inspection requirement — Energy Code Compliance Inspections
John Nakrosis
09/24/2024
Signed off — Alteration
Relocation/reconstruction of existing boiler rooms in units 2C, 3B, 3C. No change in egress, occupancy or use due to this filing.
M08017326-I1
09/09/2024
Special inspection requirement — Final
John Nakrosis
09/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
Robert Murray
09/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Murray
09/09/2024
Special inspection requirement — Fire-Resistance Rated Construction
John Nakrosis
09/06/2024
Filed — Alteration
Relocation/reconstruction of existing boiler rooms in units 2C, 3B, 3C. No change in egress, occupancy or use due to this filing.
M08017326-P1
09/04/2024
Permit issued — General Construction
M08017326-I1-GC
07/18/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/01/2024
Filed — Alteration
Relocation/reconstruction of existing boiler rooms in units 2C, 3B, 3C. No change in egress, occupancy or use due to this filing.
M08017326-I1
06/17/2024
Filed — Alteration
Repl. exist. boilers/h.w. heaters (< 350 MBtu/h) in new boiler rms. to serve Apts. 2C, 3B, 3C. Repair gas line to Apt. 2C from meter in cel. only; exist. gas risers to remain. No change in use, egress or occ.
M00509354-P2
06/05/2024
Permit issued — Suspended Scaffold
M01049854-I1-SC
06/03/2024
Filed — Alteration
Repl. exist. boilers/h.w. heaters (< 350 MBtu/h) in new boiler rms. to serve Apts. 2C, 3B, 3C. Repair gas line to Apt. 2C from meter in cel. only; exist. gas risers to remain. No change in use, egress or occ.
M00509354-P1
06/03/2024
Cycle 9 facade report signed — UNSAFE
06/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Murray
06/03/2024
Special inspection requirement — Energy Code Compliance Inspections
John Nakrosis
05/30/2024
Permit issued — Plumbing
M00509354-I1-PL
05/30/2024
Cycle 9 facade report submitted
05/29/2024
Filed — Alteration
M01049854-I1
05/24/2024
Cycle 9 facade inspection completed
05/10/2024
Special inspection requirement — Post-installed Anchors
Md Rashid
05/10/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Md Rashid
05/09/2024
Permit issued — General Construction
M00928110-I1-GC
04/01/2024
Violation issued (HPD, closed)
A
Latest 60 of 147 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offDEMAR MECHANICAL INC11/25/2025
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC08/25/2025
DOB NOWGeneral ConstructionSigned-offEVERLAST SOLUTIONS CORP07/08/2025
DOB NOWGeneral ConstructionSigned-offD.K. PROPERTY, INC09/04/2024
DOB NOWSuspended ScaffoldPermit IssuedTCR RESTORATION & CONST06/05/2024
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC05/30/2024
DOB NOWGeneral ConstructionSigned-offTCR RESTORATION & CONST*05/09/2024
DOB NOWPlumbingSigned-offCITY GAS HTG SVC CO INC08/29/2023
DOB NOWPlumbingSigned-offCITY GAS HTG SVC CO INC10/28/2022
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC04/21/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC03/23/2022
DOB NOWStructuralPermit IssuedJBJ CONCRETE RENOVATIONS05/24/2021
BIS—ISSUEDD.K. PROPERTY, INC05/05/2023
BISMHISSUEDD.K. PROPERTY, INC05/05/2023
BISOTISSUEDPA AVALANCHE CONSTRUCTION04/11/2022
BIS—ISSUEDD.K. PROPERTY, INC02/15/2022
BISMHISSUEDD.K. PROPERTY, INC02/15/2022
BISMHISSUEDD.K. PROPERTY, INC12/27/2021
BIS—ISSUEDD.K. PROPERTY, INC12/27/2021
BISOTISSUEDPA AVALANCHE CONSTRUCTION10/25/2021
BISOTISSUEDD.K. PROPERTY, INC03/16/2021
BIS—ISSUEDD.K. PROPERTY, INC03/04/2021
BISMHISSUEDD.K. PROPERTY, INC03/04/2021
BISMHISSUEDD.K. PROPERTY, INC01/03/2020
BIS—ISSUEDD.K. PROPERTY, INC01/03/2020
BISOTISSUEDD.K. PROPERTY, INC01/03/2020
BISOTISSUEDD.K. PROPERTY, INC06/04/2019
BIS—ISSUEDD.K. PROPERTY, INC01/07/2019
BISMHISSUEDD.K. PROPERTY, INC01/07/2019
BIS—ISSUEDD.K. PROPERTY, INC12/11/2017
BISMHISSUEDD.K. PROPERTY, INC12/11/2017
BISMHISSUEDAARON BOLLMAN AND CO INC07/31/2017
BISOTISSUEDAARON BOLLMAN AND CO INC07/25/2017
BIS—ISSUEDD.K. PROPERTY, INC12/13/2016
BISMHISSUEDD.K. PROPERTY, INC12/13/2016
BIS—ISSUEDD.K. PROPERTY, INC11/24/2015
BISMHISSUEDD.K. PROPERTY, INC11/24/2015
BISMHISSUEDD.K. PROPERTY, INC12/11/2014
BIS—ISSUEDD.K. PROPERTY, INC12/02/2014
BISPLISSUEDPLUMBING & HTG DOCTOR INC12/19/2013
+ 22 more permits on file
1 project · most recent 11/10/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/10/2025Signed-offDEMAR MECHANICAL INCGas, Water/Sanitary
2 projects · most recent 05/20/2024
General Wiring
FiledStatusContractorScope
05/20/2024Permit IssuedRE-CON ELECTRIC INCGeneral Wiring
03/20/2022CompleteV. VASS ELECTRIC CORP—
1 project · most recent 04/30/2021
FiledStatusContractorScope
04/30/2021Permit IssuedJBJ CONCRETE RENOVATIONS1 scope_items
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/23/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/15/2025Pass-Final Boiler Equipment InspectionPassView ↗
10/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/29/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/05/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
11/01/2025Heating SystemsMARISA HARTEspecial
10/12/2025Fire-Resistant Penetrations and JointsRobert Murrayspecial
10/12/2025Energy Code Compliance InspectionsJohn Nakrosisprogress
10/02/2025Fire-Resistant Penetrations and JointsRobert Murrayspecial
10/02/2025Energy Code Compliance InspectionsJohn Nakrosisprogress
05/15/2025FinalArthur Rabinovichprogress
05/15/2025Fire-Resistant Penetrations and JointsArthur Rabinovichspecial
05/15/2025Tenant Protection Plan ComplianceArthur Rabinovichspecial
05/15/2025Fire-Resistance Rated ConstructionArthur Rabinovichprogress
09/27/2024Fire-Resistant Penetrations and JointsRobert Murrayspecial
09/27/2024Energy Code Compliance InspectionsJohn Nakrosisprogress
09/09/2024FinalJohn Nakrosisprogress
09/09/2024Tenant Protection Plan ComplianceRobert Murrayspecial
09/09/2024Fire-Resistant Penetrations and JointsRobert Murrayspecial
09/09/2024Fire-Resistance Rated ConstructionJohn Nakrosisprogress
06/03/2024Fire-Resistant Penetrations and JointsRobert Murrayspecial
06/03/2024Energy Code Compliance InspectionsJohn Nakrosisprogress
05/10/2024Post-installed AnchorsMd Rashidspecial
05/10/2024Alternative Materials - OTCR Buildings Bulletin NumberMd Rashidspecial
08/31/2023Structural Stability – Alterations of existing buildingsFRANCESCO MOspecial
08/31/2023Tenant Protection Plan ComplianceMd Rashidspecial
08/31/2023Post-installed AnchorsFRANCESCO MOspecial
08/31/2023MasonryFRANCESCO MOspecial
08/31/2023Construction Operations Influencing Adjacent StructuresFRANCESCO MOspecial
08/31/2023FinalFRANCESCO MOprogress
▾Documents — 236 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
09/03/2026M00494065-I1Request digital key ↗
09/02/2026M00702739-I1Request digital key ↗
09/02/2026M00720936-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits48
▸BISWORK PERMIT APPLICATION31
04/21/2023120764039Open ↗
04/21/2023121829067Open ↗
04/19/2023121829067Open ↗
Showing 3 of 31 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION17
02/14/2023140844512Open ↗
01/25/2023140844512Open ↗
12/30/2021140844512Open ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications52
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/02/2026M00702739-I1Open ↗
08/29/2026M00928110-I1Open ↗
08/26/2026M08017326-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/23/2026M00509354-S4Open ↗
09/01/2026M00509354-S2Open ↗
09/01/2026M00509354-S2Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
07/02/2018123312101Open ↗
12/09/2013121829067Open ↗
05/14/2013121342172Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026M00509354-S2Open ↗
09/01/2026M00509354-S2Open ↗
09/01/2026M00509354-S1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/22/2019140844512Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/05/2008110415168Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/22/2019140844512Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/05/2008110415168Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/22/2019140844512Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING3
12/09/2013121829067Open ↗
01/23/2012120764039Open ↗
07/22/2011120764039Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
06/29/2018123312101Open ↗
06/29/2018123312101Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
01/29/2014121829067Open ↗
01/29/2014121829067Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES2
04/22/2019140844512Open ↗
07/27/2017123312101Open ↗
▸BISSTREET TREE CHECKLIST1
07/22/2011120764039Open ↗
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/29/2026M00928110-I1Open ↗
08/26/2026M08017326-P1Open ↗
08/26/2026M08017326-I1Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
12/17/2021140844512Open ↗
04/22/2019140844512Open ↗
07/27/2017123312101Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/22/2011120764039Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
12/05/2008110415168Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
07/02/2018123312101Open ↗
07/02/2018123312101Open ↗
12/09/2013121829067Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/08/2021140844512Open ↗
04/22/2019140844512Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/17/2023140844512Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/17/2023140844512Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/22/2019140844512Open ↗
▸BISTR8: Energy Code Progress Inspections1
01/23/2012120764039Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/02/2018123312101Open ↗
▸BISNYCECC ANALYSIS1
04/22/2019140844512Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00494065-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY6
02/17/2023140844512Open ↗
12/08/2021140844512Open ↗
12/08/2021140844512Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
07/02/2018123312101Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
02/17/2023140844512Open ↗
▸BISMASONRY1
02/17/2023140844512Open ↗
▸Approvals, Objections & Sign-offs13
▸BISADMINISTRATIVE OBJECTIONS3
08/20/2012121342172Open ↗
07/22/2011120764039Open ↗
12/05/2008110415168Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
12/15/2021140844512Open ↗
10/25/2021140844512Open ↗
04/23/2021140844512Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE3
02/14/2013120764039Open ↗
07/22/2011120764039Open ↗
01/23/2012120764039Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/16/2023140844512Open ↗
07/02/2018123312101Open ↗
▸BISFINAL1
02/17/2023140844512Open ↗
▸BISCCD1-Construction Code Determination1
01/23/2012120764039Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT12
03/16/2023140844512Open ↗
02/22/2023140844512Open ↗
12/08/2021140844512Open ↗
Showing 3 of 12 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
12/05/2008110415168Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/17/2023140844512Open ↗
▸Filing & Intake Forms24
▸BISADDITIONAL INFORMATION10
02/14/2023140844512Open ↗
12/30/2021140844512Open ↗
12/17/2021140844512Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM8
04/21/2023120764039Open ↗
04/21/2023121829067Open ↗
04/19/2023121829067Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET5
07/27/2017123312101Open ↗
12/09/2013121829067Open ↗
08/15/2012121342172Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
04/22/2019140844512Open ↗
▸Other Documents14
▸DOB NOWProof of Historic Building9
08/21/2026M00509354-P5Open ↗
08/21/2026M00509354-P4Open ↗
08/21/2026M00509354-P3Open ↗
Showing 3 of 9 on file for this type
▸BISPLOT DIAGRAM1
07/22/2011120764039Open ↗
▸BISCHIMNEYS AND VENTS1
02/17/2023140844512Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/23/2012120764039Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01049854-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01049854-I1Open ↗