| Owner | Filings | Most Recent |
|---|---|---|
| COLLIERS | 22 | 09/15/2026 |
| TOMM ELECTRIC | 3 | 07/08/2026 |
| 23RD STREET | 4 | 03/22/2026 |
| 23 STREET | 4 | 03/22/2026 |
| 23RD STREET PROPERTIES | 74 | 03/22/2026 |
| 23 STREET PROERTIES | 4 | 03/22/2026 |
| 23 STREER PROPERTIE | 1 | 03/22/2026 |
| 23RD STREET PROPERTY | 1 | 03/22/2026 |
| 23 RD STREET PROPERTIE | 3 | 03/22/2026 |
| 23 STREET PROP | 2 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| RIGID STRUCTURAL DESIGN, LLC | 1 | 08/20/2026 |
| GEORGE BOYLE | 7 | 07/07/2026 |
| AN ENGINEERING, PLLC | 2 | 07/02/2026 |
| GENSLER | 4 | 01/08/2026 |
| AMA CONSULTING ENGINEERS, PC | 16 | 08/27/2025 |
| THE EIPEL ENGINEERING GROUP, D.P.C. | 2 | 08/25/2025 |
| TOHFAZ UDDIN PE PC | 2 | 06/10/2025 |
| WALTER T. GORMAN, P.E., P.C. | 2 | 02/05/2025 |
| INDETAIL ARCHITECTURAL AND ENGIN | 1 | 11/12/2024 |
| CFS ENGINEERING, DPC | 2 | 11/15/2023 |
| GARY R. O'CONNOR, AIA | 1 | 09/06/2023 |
| ENTHINK ENGINEERS LLC | 1 | 06/09/2021 |
| KABBANI HANRAHAN ASSOCIATES | 1 | 04/12/2021 |
| KARBON ENGINEERING SERVICES, LLC | 6 | 12/18/2020 |
| EXL STRUCTURAL CONSULTANTS | 1 | 01/22/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| WILLIAM VITACCO ASSOCIATES | 23 | 03/21/2026 |
| DVA Advisors | 13 | 03/21/2026 |
| WALTER T GORMAN PE | 4 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 3 | 03/21/2026 |
| SANARK CONSULTING ENGINEERING D P C | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| PHASE 3 INTERIORS LLC | General Contractor | 12 | 08/18/2026 |
| L&K PARTNERS, INC | General Contractor | 10 | 08/14/2026 |
| JC CONTRACTING.MGMT LLC | General Contractor | 5 | 07/08/2026 |
| KING HOIST & SCAFFOLDING | General Contractor | 4 | 07/02/2026 |
| A&A PLUMBING CORP | Plumbing | 4 | 07/08/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 3 | 03/21/2026 |
| PSI PARTNERS | Plumbing | 3 | 03/22/2026 |
| GRUSHINSKY PIPNG & HTG IN | Fire Protection | 3 | 07/08/2026 |
| UNITED PLBG MECHANICAL INC | Plumbing | 2 | 07/08/2026 |
| LT FIRE PROTECTION CORP | Fire Protection | 2 | 07/08/2026 |
| PSI PARTNERS, LLC | Fire Protection | 2 | 07/08/2026 |
| EVEREST SCAFFOLDING INC | General Contractor | 2 | 03/21/2026 |
| INTERSYSTEM CONSTRUCTION | General Contractor | 2 | 09/15/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 2 | 07/08/2026 |
| RETAIL CONSTRU & SIGNAGE | General Contractor | 1 | 04/09/2026 |
| TOMM ELECTRIC LLC | General Contractor | 1 | 07/08/2026 |
| AHEARN-HOLTZMAN, INC | General Contractor | 1 | 07/08/2026 |
| NOTO, CHARLES | Electrical | 1 | 03/21/2026 |
| FRANK ZIZZO | Electrical | 1 | 03/21/2026 |
| DEGENNARO III, CHARLES | Electrical | 1 | 03/21/2026 |
| NORTHEAST ELEC'L CONTR'S | Electrical | 1 | 03/22/2026 |
| BEIL, SHELDON | Electrical | 1 | 03/21/2026 |
| MOSKOWITZ STUART | Electrical | 1 | 03/21/2026 |
| JEWNANDAN, RAJESH | Electrical | 1 | 03/21/2026 |
| JAROSLAW KURACH | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| JS BUILDING CONSULTING | 4959 | 24 | 07/07/2026 |
| CNS INSPECTION SERVICES | 7566 | 2 | 08/25/2025 |
| THE EIPEL ENGINEERING GRO | 2714 | 3 | 08/25/2025 |
| MILROSE CONSULTANTS LLC | 2003 | 2 | 11/15/2023 |
| W. ALLEN ENGINEERING PLLC | 664 | 4 | 12/18/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | INTERSYSTEM CONSTRUCTION | 09/14/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | INTERSYSTEM CONSTRUCTION | 08/20/2026 |
| DOB NOW | General Construction | Permit Issued | PHASE 3 INTERIORS LLC | 08/17/2026 |
| DOB NOW | Structural | Permit Issued | L&K PARTNERS, INC | 08/13/2026 |
| DOB NOW | General Construction | Permit Issued | L&K PARTNERS, INC | 08/13/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | KING HOIST & SCAFFOLDING | 06/30/2026 |
| DOB NOW | Structural | Permit Issued | L&K PARTNERS, INC | 06/29/2026 |
| DOB NOW | General Construction | Permit Issued | L&K PARTNERS, INC | 06/29/2026 |
| DOB NOW | Structural | Permit Issued | L&K PARTNERS, INC | 06/26/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | L&K PARTNERS, INC | 06/25/2026 |
| DOB NOW | General Construction | Permit Issued | PHASE 3 INTERIORS LLC | 05/28/2026 |
| DOB NOW | Structural | Permit Issued | PHASE 3 INTERIORS LLC | 05/12/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | PHASE 3 INTERIORS LLC | 05/05/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 05/05/2026 |
| DOB NOW | General Construction | Permit Issued | PHASE 3 INTERIORS LLC | 04/17/2026 |
| DOB NOW | General Construction | Permit Issued | L&K PARTNERS, INC | 06/27/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | L&K PARTNERS, INC | 06/26/2025 |
| DOB NOW | Structural | Permit Issued | L&K PARTNERS, INC | 06/20/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | KING HOIST & SCAFFOLDING | 06/12/2025 |
| DOB NOW | Sprinklers | Signed-off | MORA FIRE PROTECTION LLC | 06/04/2025 |
| DOB NOW | General Construction | Permit Issued | L&K PARTNERS, INC | 06/02/2025 |
| DOB NOW | Sprinklers | Signed-off | GRUSHINSKY PIPNG & HTG IN | 05/27/2025 |
| DOB NOW | Sprinklers | Permit Issued | AGGRESSIVE FIRE PROT LLC | 05/20/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | KING HOIST & SCAFFOLDING | 04/24/2025 |
| DOB NOW | General Construction | Signed-off | PHASE 3 INTERIORS LLC | 01/09/2025 |
| DOB NOW | Sprinklers | Signed-off | GRUSHINSKY PIPNG & HTG IN | 01/09/2025 |
| DOB NOW | Mechanical Systems | Signed-off | PHASE 3 INTERIORS LLC | 01/08/2025 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 01/08/2025 |
| DOB NOW | General Construction | Signed-off | RETAIL CONSTRU & SIGNAGE | 10/07/2024 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 05/20/2024 |
| DOB NOW | Sprinklers | Signed-off | MORA FIRE PROTECTION LLC | 05/16/2024 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 05/14/2024 |
| DOB NOW | Mechanical Systems | Signed-off | PHASE 3 INTERIORS LLC | 05/13/2024 |
| DOB NOW | General Construction | Signed-off | PHASE 3 INTERIORS LLC | 05/13/2024 |
| DOB NOW | Sprinklers | Signed-off | GRUSHINSKY PIPNG & HTG IN | 05/10/2024 |
| DOB NOW | General Construction | Signed-off | PHASE 3 INTERIORS LLC | 05/10/2024 |
| DOB NOW | Mechanical Systems | Signed-off | PHASE 3 INTERIORS LLC | 05/10/2024 |
| DOB NOW | General Construction | Signed-off | JRM CONSTRUCTION MGMT LLC | 11/30/2023 |
| DOB NOW | Mechanical Systems | Signed-off | JRM CONSTRUCTION MGMT LLC | 11/22/2023 |
| DOB NOW | General Construction | Signed-off | TOMM ELECTRIC LLC | 09/11/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/27/2025 | Permit Issued | PHASE 3 INTERIORS LLC | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric PEFY-P48NMAU-E4 48,000 BTU · Vrf Indoor ×17 PEFY-P96NMHSU-E-OA 99,000 BTU · Vrf Indoor ×5 PQHY-P360TSLMU-A2 360,000 BTU · Vrf Outdoor ×5 PQHY-P120TSLMU-A2 120,000 BTU · Vrf Outdoor ×2 PQHY-P192TLMU-A2 179,000 BTU · Vrf Outdoor ×2 PEFY-P36NMHSU-E-OA 35,000 BTU · Vrf Indoor ×1 PQHY-P144TLMU-A2 140,000 BTU · Vrf Outdoor ×1 Ventilation Greenheck G-060-VG 100 CFM · Exhaust Fan ×1 |
| 11/21/2024 | Permit Issued | L&K PARTNERS, INC | Ventilation Systems | Ventilation |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/27/2025 | — | — | Sprinkler System |
| 11/21/2024 | Permit Issued | AGGRESSIVE FIRE PROT LLC | 113 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/27/2025 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/12/2026 | Permit Issued | AURORA ELECL CONTG INC | — |
| 05/19/2025 | Complete | CANDELA SYSTEMS CORP DBA | Lighting |
| 01/23/2025 | Complete | ATTRACTIVE LIGHTING ELECL | General Wiring |
| 06/24/2024 | Complete | USIS ELECTRIC INC | General Wiring |
| 12/20/2023 | Complete | POWERONE ELECT'L CONTRG | — |
| 07/20/2023 | Permit Issued | CENTURY ELECTRIC LLC | General Wiring |
| 06/10/2021 | Complete | BOROWIDE ELECT'L CONTR'S | — |
| 11/21/2019 | Complete | NORTHEAST ELEC'L CONTR'S | General Wiring |
| 10/29/2019 | Complete | USIS ELECTRIC INC | General Wiring |
| 10/29/2019 | Cancelled | USIS ELECTRIC INC | General Wiring |
| 10/29/2019 | Cancelled | USIS ELECTRIC INC | General Wiring |
| 10/28/2019 | Cancelled | USIS ELECTRIC INC | General Wiring |
| 10/28/2019 | Cancelled | USIS ELECTRIC INC | General Wiring |
| 05/02/2019 | Permit Issued | MULTI-PHASE ELEC'L SVCS | General Wiring |
| 02/26/2019 | Complete | USIS ELECTRIC INC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/20/2026 | Permit Issued | INTERSYSTEM CONSTRUCTION | Steel |
| 08/27/2025 | Permit Issued | PHASE 3 INTERIORS LLC | Steel, Concrete, Masonry, Wood |
| 11/21/2024 | Permit Issued | L&K PARTNERS, INC | Steel, Masonry, Wood |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/20/2026 | Permit Issued | INTERSYSTEM CONSTRUCTION | Scaffold, Sidewalk Shed |
| 04/24/2025 | Permit Issued | KING HOIST & SCAFFOLDING | Scaffold |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/14/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/10/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/29/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/17/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 07/17/2026 | Certified Gas-Gas-Piping-Underground | Certified | View ↗ |
| 07/13/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 07/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/10/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/12/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/05/2026 | No Access-Final PL - Up to 3 Requested Floors | No Access | View ↗ |
| 09/08/2025 | Fail-Final Curb Cut Non-Directive 14 | Fail | View ↗ |
| 09/03/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/28/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/01/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/18/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/18/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/17/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/17/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/17/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/16/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/14/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/30/2025 | Fail-Final Curb Cut Non-Directive 14 | Fail | View ↗ |
| 04/14/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/09/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/05/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/13/2026 | Interior lighting power | Julian Saavedra | energy_progress |
| 05/13/2026 | Lighting controls | Julian Saavedra | energy_progress |
| 04/08/2026 | Final | Julian Saavedra | progress |
| 04/08/2026 | Fire-Resistant Penetrations and Joints | Julian Saavedra | special |
| 04/07/2026 | Fenestration areas | Julian Saavedra | energy_progress |
| 04/07/2026 | Fenestration and door U-factor and product ratings | Julian Saavedra | energy_progress |
| 04/07/2026 | Fenestration air leakage | Julian Saavedra | energy_progress |
| 08/19/2025 | Heating Systems | Julian Saavedra | special |
| 08/19/2025 | Fire-Resistant Penetrations and Joints | Julian Saavedra | special |
| 08/19/2025 | Electrical motors and elevators | Julian Saavedra | energy_progress |
| 08/19/2025 | Maintenance information | Julian Saavedra | energy_progress |
| 08/19/2025 | Interior lighting power | Julian Saavedra | energy_progress |
| 08/19/2025 | HVAC-R and service water piping design and insulation | Julian Saavedra | energy_progress |
| 08/19/2025 | Duct leakage testing, insulation and design | Julian Saavedra | energy_progress |
| 08/19/2025 | Exterior lighting power | Julian Saavedra | energy_progress |
| 08/19/2025 | Post-installed Anchors | Julian Saavedra | special |
| 08/19/2025 | Post-installed Anchors | Julian Saavedra | special |
| 08/19/2025 | Shutoff dampers | Julian Saavedra | energy_progress |
| 08/19/2025 | HVAC-R and service water heating system controls | Julian Saavedra | energy_progress |
| 08/19/2025 | HVAC-R and service water heating equipment | Julian Saavedra | energy_progress |
| 08/19/2025 | Fire-Resistant Penetrations and Joints | Julian Saavedra | special |
| 07/30/2025 | Fire-Resistant Penetrations and Joints | Julian Saavedra | special |
| 07/30/2025 | Final | Julian Saavedra | progress |
| 07/01/2025 | Fire-Resistant Penetrations and Joints | Julian Saavedra | special |
| 07/01/2025 | Fire-Resistance Rated Construction | Julian Saavedra | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Ramp | Office | Floor 2 | Project M01061389 Project M00955212 |
| Home Depot | Retail | Floor 1 | Project M00881392 |
| Xandr | Office | — | Project M00297824 |