← Back
Converted dwellings or rooming house
40 WEST 70 STREET
MANHATTAN · Upper West Side-Lincoln Square · BIN 1028518
💬 Discuss this project
1892Year Built
4Stories
C5Building Class
R8BZoning
—Gross Floor Area
10Units
8 Open Violations 4 unresolved · 4 paperwork only ▸
Converted dwellings or rooming house · 3.45 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.102/11/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RALEIGH POWELL LIC ELECElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808102/11/2025
Building Lifecycle
All (21)Filed (1)Permit Issued (1)Signed Off (1)Violation (13)Inspection (1)Special Inspection (4)
05/22/2025
Signed off — Alteration
REPLACE BOILER AND OIL BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01174449-I1
04/15/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/25/2025
Permit issued — Boiler Equipment
M01174449-I1-BE
02/11/2025
Filed — Alteration
REPLACE BOILER AND OIL BURNER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01174449-I1
02/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
02/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Bazini
02/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Bazini
01/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
11/02/2022
Violation issued (HPD, closed)
I
12/26/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/26/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/26/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/01/2019
Violation issued (ECB, open)
Construction
10/01/2019
Violation issued (ECB, open)
Construction
10/01/2019
Violation issued (ECB, open)
Quality of Life
10/01/2019
Violation issued (ECB, open)
Construction
10/02/2015
Violation issued (HPD, closed)
I
03/20/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/20/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offROCKWAY FUEL OIL CORP03/25/2025
BISEQISSUEDDPC NEW YORK, INC04/07/2016
BISEQISSUEDDPC NEW YORK, INC03/31/2016
1 project · most recent 02/10/2025
Boiler Controls
FiledStatusContractorScope
02/10/2025CompleteRALEIGH POWELL LIC ELECBoiler Controls
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/15/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
02/11/2025HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
02/11/2025HVAC-R and service water piping design and insulationJoseph Bazinienergy_progress
02/11/2025HVAC-R and service water heating system controlsJoseph Bazinienergy_progress
01/30/2025Tenant Protection Plan ComplianceJoseph Bazinispecial
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/24/2026M01174449-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION2
03/16/2016140466449Open ↗
03/16/2016140470256Open ↗
▸BISWORK PERMIT APPLICATION2
04/07/2016140470256Open ↗
03/31/2016140466449Open ↗
▸DOB NOWLPC Approval/Permit1
08/13/2026M01174449-I1Open ↗
▸Seals & Professional Certifications10
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
03/16/2016140466449Open ↗
03/16/2016140470256Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/16/2016140466449Open ↗
03/16/2016140470256Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
03/16/2016140466449Open ↗
03/16/2016140470256Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026M01174449-I1Open ↗
09/23/2026M01174449-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026M01174449-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026M01174449-I1Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES2
04/07/2016140470256Open ↗
03/16/2016140466449Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M01174449-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/16/2016140466449Open ↗
03/16/2016140470256Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLANDMARKS APPROVAL2
03/16/2016140466449Open ↗
03/16/2016140470256Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET2
03/16/2016140466449Open ↗
03/16/2016140470256Open ↗