← Back
BuildNYC
Large suburban residence
40 WOODHAVEN AVENUE
STATEN ISLAND · BIN 5133372
💬 Discuss this project
1971Year Built
2Stories
A3Building Class
R1-1Zoning
3,540 sfGross Floor Area
1Units
Large suburban residence · 29,480 sf lot · 0.12 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Unit 3PS10p · 3 filings · 19 docs
CellarInterior renovation and roof replacement10p · 2 filings · 18 docs
Basement1p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jian Engineering211/02/2022
Arquitectura Varela107/06/2022
Chen Consulting Engineering105/12/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ryan Design Architecture303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dumani ConstructionGeneral Contractor1107/08/2026
Dumani ConstructionScaffold603/21/2026
A&H Express Plumbing & HeatingPlumbing107/08/2026
EH Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ryan Design Architecture7159105/12/2022
Building Lifecycle
04/29/2025
Signed off — Alteration
INTERIOR RENOVATION AND ROOF REPAIR and REPLACEMENT in exisiting 1 FAMILY DETACHED HOUSE
S00696737-I1
04/28/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/03/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/25/2025
Signed off — Alteration
remodel kitchen and remove 1/2 bath on first floor add shower to master bath and add 3 fixture bath in basment
S00736133-I1
02/24/2025
Signed off — Alteration
S00770371-I1
30 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offDumani Construction10/21/2024
DOB NOWPlumbingSigned-offA&H Express Plumbing & Heating09/18/2024
DOB NOWGeneral ConstructionSigned-offDumani Construction09/22/2023
DOB NOWGeneral ConstructionSigned-offDumani Construction05/04/2023
DOB NOWConstruction FenceSigned-offDumani Construction08/23/2022
DOB NOWGeneral ConstructionSigned-offDumani Construction08/23/2022
DOB NOWConstruction FenceSigned-offDumani Construction07/07/2022
DOB NOWGeneral ConstructionSigned-offDumani Construction06/29/2022
DOB NOWPlumbingSigned-offEH Plumbing & Heating05/31/2022
1 project · most recent 06/15/2022
General Wiring
FiledStatusContractorScope
06/15/2022CompleteA & R Electrical ContractingGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/28/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/03/2025Fail-Final General Construction Non-Directive 14FailView ↗
12/27/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/04/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/04/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
05/09/2022Interior lighting powerDaniel Ryanenergy_progress
05/09/2022Fenestration areasDaniel Ryanenergy_progress
05/09/2022Fenestration air leakageDaniel Ryanenergy_progress
05/09/2022Fenestration and door U-factor and product ratingsDaniel Ryanenergy_progress
03/30/2022Subgrade InspectionsDaniel Ryanspecial
03/30/2022Concrete - Cast-In-PlaceDaniel Ryanspecial
03/15/2022Energy Code Compliance InspectionsDaniel Ryanprogress
19 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account