RoofUnder Construction106p · 7 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
The plans enclosed herein depict the extent, sequence, and means and methods for the proposed partial demolition of the building filed in conjunction with Alt-CO # M00975056.
On file for this project
20 documents
Latest 3 of 7 filings on this floor.
PenthouseUnder Construction89p · 2 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Proposed ST work filed in conjunction with Alt-CO-GC # M00975056-I1. The scope consists of new elevator / stair shafts, new fill-in framing for the existing shafts opening, new roof framing replacement and new roof bulkhead as shown on plans.
On file for this project
120 documents · 4 drawing sheets
PROPOSE TEMPORARY MOCK-UP STRUCTURE ON EXISTING ROOFTOP FOR 15 DAYS MAXIMUM. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
Floor 6Under Construction88p · 5 filings · 20 docs
ArchitectureDMFire ProtectionPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
The plans enclosed herein depict the extent, sequence, and means and methods for the proposed partial demolition of the building filed in conjunction with Alt-CO # M00975056.
On file for this project
20 documents · 1 drawing sheet
Propose temporary manual dry standpipe system for the construction filed in conjunction with Alt-CO-GC # M00975056-I1.
On file for this project
4 documents
Proposed ST work filed in conjunction with Alt-CO-GC # M00975056-I1. The scope consists of new elevator / stair shafts, new fill-in framing for the existing shafts opening, new roof framing replacement and new roof bulkhead as shown on plans.
On file for this project
120 documents
Latest 3 of 5 filings on this floor.
Floor 5Under Construction99p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
The plans enclosed herein depict the extent, sequence, and means and methods for the proposed partial demolition of the building filed in conjunction with Alt-CO # M00975056.
On file for this project
20 documents
Propose temporary manual dry standpipe system for the construction filed in conjunction with Alt-CO-GC # M00975056-I1.
On file for this project
4 documents
Proposed ST work filed in conjunction with Alt-CO-GC # M00975056-I1. The scope consists of new elevator / stair shafts, new fill-in framing for the existing shafts opening, new roof framing replacement and new roof bulkhead as shown on plans.
On file for this project
120 documents · 5 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 4Under Construction97p · 5 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
The plans enclosed herein depict the extent, sequence, and means and methods for the proposed partial demolition of the building filed in conjunction with Alt-CO # M00975056.
On file for this project
20 documents
Propose temporary manual dry standpipe system for the construction filed in conjunction with Alt-CO-GC # M00975056-I1.
On file for this project
4 documents
Proposed ST work filed in conjunction with Alt-CO-GC # M00975056-I1. The scope consists of new elevator / stair shafts, new fill-in framing for the existing shafts opening, new roof framing replacement and new roof bulkhead as shown on plans.
On file for this project
120 documents · 4 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 3Under Construction100p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
The plans enclosed herein depict the extent, sequence, and means and methods for the proposed partial demolition of the building filed in conjunction with Alt-CO # M00975056.
On file for this project
20 documents
Propose temporary manual dry standpipe system for the construction filed in conjunction with Alt-CO-GC # M00975056-I1.
On file for this project
4 documents
Proposed ST work filed in conjunction with Alt-CO-GC # M00975056-I1. The scope consists of new elevator / stair shafts, new fill-in framing for the existing shafts opening, new roof framing replacement and new roof bulkhead as shown on plans.
On file for this project
120 documents · 6 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 2Under Construction94p · 5 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
The plans enclosed herein depict the extent, sequence, and means and methods for the proposed partial demolition of the building filed in conjunction with Alt-CO # M00975056.
On file for this project
20 documents
Propose temporary manual dry standpipe system for the construction filed in conjunction with Alt-CO-GC # M00975056-I1.
On file for this project
4 documents
Proposed ST work filed in conjunction with Alt-CO-GC # M00975056-I1. The scope consists of new elevator / stair shafts, new fill-in framing for the existing shafts opening, new roof framing replacement and new roof bulkhead as shown on plans.
On file for this project
120 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 1Under Construction90p · 5 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
The plans enclosed herein depict the extent, sequence, and means and methods for the proposed partial demolition of the building filed in conjunction with Alt-CO # M00975056.
On file for this project
20 documents
Propose temporary manual dry standpipe system for the construction filed in conjunction with Alt-CO-GC # M00975056-I1.
On file for this project
4 documents
Proposed ST work filed in conjunction with Alt-CO-GC # M00975056-I1. The scope consists of new elevator / stair shafts, new fill-in framing for the existing shafts opening, new roof framing replacement and new roof bulkhead as shown on plans.
On file for this project
120 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
CellarUnder Construction95p · 4 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Standpipe · Supported Scaffold
Propose temporary manual dry standpipe system for the construction filed in conjunction with Alt-CO-GC # M00975056-I1.
On file for this project
4 documents
Proposed ST work filed in conjunction with Alt-CO-GC # M00975056-I1. The scope consists of new elevator / stair shafts, new fill-in framing for the existing shafts opening, new roof framing replacement and new roof bulkhead as shown on plans.
On file for this project
120 documents · 8 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents
Latest 3 of 4 filings on this floor.