400 BROADWAY
MANHATTAN · BIN 1002334
💬 Discuss this project
1865Year Built
4Stories
O2Building Class
M1-5Zoning
12,200 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Office only, 2-6 stories · Owner of record: 400 BROADWAY OWNER LLC · 3,053 sf lot · 4 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 2 filings · 20 docs
Floor 42p · 1 filing · 9 docs
Floor 34p · 2 filings · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 1
CellarUnder Construction5p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
APICHA CHC1307/08/2026
521 BROADWAY GROUP1607/08/2026
STANDARD CONSTRUCTION607/08/2026
ACE GROUP NY CORP.503/22/2026
ETNA CONTRACTING203/22/2026
521 BROADWAY2803/22/2026
TECH CONSTRUCTION103/22/2026
400 BROADWAY ASSOCIATES2803/22/2026
OWNER OF 400 BROADWAY103/22/2026
SHAH GROUP ENTERPRISES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
zenesis group603/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
GREEN STUDIO203/21/2026
APICHA CHC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AHMAD WAZNEGeneral Contractor603/21/2026
THE WZ GROUP LLCGeneral Contractor407/08/2026
A & C HTG SERVICES, INCPlumbing407/08/2026
STANDARD CONSTRUCTION CORGeneral Contractor307/08/2026
ACE GROUP NY CORPGeneral Contractor303/21/2026
PAUL SIGNSScaffold107/08/2026
ECI CONTRACTING GROUP INCGeneral Contractor109/07/2026
RIGHT TEMP MECHANICAL INCGeneral Contractor109/12/2026
SAHARA CONTRACTING CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COSTA ARCHITECTS & ENGINE1321108/18/2026
CHEN ENGINEERING SERVICES1826101/13/2026
ZENESIS ENGINEERING/ARCHI1473204/13/2021
Building Lifecycle
All (93)Filed (14)Permit Issued (15)Signed Off (7)Violation (35)Inspection (4)Objection (5)Special Inspection (13)
09/10/2026
Permit issued — Mechanical Systems
M01392159-I1-MS
09/03/2026
Permit issued — General Construction
M01339236-I1-GC-CX
08/18/2026
Filed — Alteration
installation of a 2 ton HVAC split system
M01392159-I1
04/23/2026
Special inspection requirement — Mechanical Systems
PAUL ANTONIO
04/23/2026
Special inspection requirement — Final
PAUL ANTONIO
02/09/2026
Objection resolved — Resolved
02/09/2026
Objection resolved — Resolved
01/28/2026
Objection raised — Admin
01/28/2026
Objection raised — Scope
01/28/2026
Objection raised — Admin
01/13/2026
Filed — Alteration
VAULT REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01339236-I1
12/23/2025
Special inspection requirement — Structural Steel - Welding
HENLIA CHEN
12/23/2025
Special inspection requirement — Structural Steel - Details
HENLIA CHEN
12/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
HENLIA CHEN
12/23/2025
Special inspection requirement — Final
Marie Ennis
01/28/2025
Signed off — Alteration
INSTALL NEW SECURITY DOORS AT SECONDARY CORRIDORS, RELOCATE OFFICE DOOR, ENCLOSE WORK AREA TO CREATE NEW BIO-HAZARD ROOM & PROVIDE NEW DOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00939268-I1
08/21/2024
Permit issued — General Construction
M00939268-I1-GC
08/14/2024
Filed — Alteration
INSTALL NEW SECURITY DOORS AT SECONDARY CORRIDORS, RELOCATE OFFICE DOOR, ENCLOSE WORK AREA TO CREATE NEW BIO-HAZARD ROOM & PROVIDE NEW DOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00939268-P1
08/13/2024
Special inspection requirement — Final
RAJENDRA PARIKH
05/08/2024
Permit issued — Sidewalk Shed
M01046176-I1-SH
05/07/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01046176-I1
03/12/2024
Signed off — Alteration
Proposed Pin-Mounted Lettering & Logo atop 2 Existing Facades. No Change in Use, Egress, or Occupancy.
M00358541-I1
12/04/2023
Signed off — Alteration
INSTALLATION OF PROTECTIVE GUARDRAIL AT ROOF LEVEL ADJACENT TO HVAC EQUIPMENT & DUNNAGE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00940625-I1
11/27/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 400 BROADWAY, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M00816597-I1
11/20/2023
Violation issued (FDNY_NOV, closed)
10/12/2023
Permit issued — General Construction
M00940625-I1-GC
10/04/2023
Filed — Alteration
INSTALLATION OF PROTECTIVE GUARDRAIL AT ROOF LEVEL ADJACENT TO HVAC EQUIPMENT & DUNNAGE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00940625-I1
09/27/2023
Special inspection requirement — Final
RAJENDRA PARIKH
09/26/2023
Filed — Alteration
INSTALL NEW SECURITY DOORS AT SECONDARY CORRIDORS, RELOCATE OFFICE DOOR, ENCLOSE WORK AREA TO CREATE NEW BIO-HAZARD ROOM & PROVIDE NEW DOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00939268-I1
08/29/2023
Permit issued — Sign
M00358541-I1-SG
07/10/2023
Permit issued — Construction Fence
M00816597-I1-FN
03/15/2023
Signed off — Alteration
REMOVAL AND REPLACEMENT OF EXISTING HVAC EQUIPMENT WITH NEW. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00445564-I1
01/23/2023
Permit issued — Construction Fence
M00816597-I1-FN
01/21/2023
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 400 BROADWAY, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M00816597-I1
07/13/2022
Signed off — Alteration
REMOVAL AND REPLACEMENT OF EXISTING HVAC EQUIPMENT WITH NEW. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00445564-S4
06/23/2022
Signed off — Alteration
REMOVAL AND REPLACEMENT OF EXISTING HVAC EQUIPMENT WITH NEW. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00445564-S1
06/03/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/19/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/09/2022
Filed — Alteration
REMOVAL AND REPLACEMENT OF EXISTING HVAC EQUIPMENT WITH NEW. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00445564-P2
05/04/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/15/2022
Filed — Alteration
REMOVAL AND REPLACEMENT OF EXISTING HVAC EQUIPMENT WITH NEW. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00445564-P1
03/31/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/30/2022
Permit issued — Mechanical Systems
M00445564-I1-MS
01/27/2022
Permit issued — Plumbing
M00445564-S1-PL
01/27/2022
Permit issued — Boiler Equipment
M00445564-S4-BE
09/17/2021
Permit issued — Boiler Equipment
M00445564-S4-BE
09/17/2021
Permit issued — Plumbing
M00445564-S1-PL
09/14/2021
Permit issued — General Construction
M00445564-I1-GC
09/10/2021
Permit issued — General Construction
M00445564-I1-MS
07/26/2021
Filed — Alteration
Proposed Pin-Mounted Lettering & Logo atop 2 Existing Facades. No Change in Use, Egress, or Occupancy.
M00358541-P1
07/22/2021
Special inspection requirement — Final
RAJENDRA PARIKH
04/13/2021
Filed — Alteration
REMOVAL AND REPLACEMENT OF EXISTING HVAC EQUIPMENT WITH NEW. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00445564-S4
04/12/2021
Special inspection requirement — Heating Systems
RAJENDRA PARIKH
03/02/2021
Filed — Alteration
REMOVAL AND REPLACEMENT OF EXISTING HVAC EQUIPMENT WITH NEW. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00445564-S1
02/10/2021
Filed — Alteration
REMOVAL AND REPLACEMENT OF EXISTING HVAC EQUIPMENT WITH NEW. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00445564-I1
01/28/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAJENDRA PARIKH
12/30/2020
Special inspection requirement — Mechanical Systems
RAJENDRA PARIKH
12/30/2020
Special inspection requirement — Final
RAJENDRA PARIKH
07/28/2020
Filed — Alteration
Proposed Pin-Mounted Lettering & Logo atop 2 Existing Facades. No Change in Use, Egress, or Occupancy.
M00358541-I1
04/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedRIGHT TEMP MECHANICAL INC09/10/2026
DOB NOWGeneral ConstructionPermit IssuedECI CONTRACTING GROUP INC09/03/2026
DOB NOWGeneral ConstructionSigned-offTHE WZ GROUP LLC08/21/2024
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP05/08/2024
DOB NOWGeneral ConstructionSigned-offTHE WZ GROUP LLC10/12/2023
DOB NOWSignSigned-offPAUL SIGNS, INC08/29/2023
DOB NOWConstruction FenceSigned-offSTANDARD CONSTRUCTION COR07/10/2023
DOB NOWConstruction FenceSigned-offSTANDARD CONSTRUCTION COR01/23/2023
DOB NOWMechanical SystemsSigned-offAHMAD WAZNE03/30/2022
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP01/27/2022
DOB NOWBoiler EquipmentSigned-offDMC PLBG & HTG CORP01/27/2022
DOB NOWBoiler EquipmentSigned-offDMC PLBG & HTG CORP09/17/2021
DOB NOWPlumbingSigned-offDMC PLBG & HTG CORP09/17/2021
DOB NOWGeneral ConstructionSigned-offSAHARA CONTRACTING CORP09/14/2021
DOB NOWGeneral ConstructionSigned-offAHMAD WAZNE09/10/2021
BISOTISSUEDSTANDARD CONSTRUCTION COR05/16/2023
BISOTISSUEDSTANDARD CONSTRUCTION COR01/09/2023
BISOTISSUEDSTANDARD CONSTRUCTION COR07/16/2022
BISOTISSUEDETNA CONTRACTING INC04/29/2020
BISEQISSUEDETNA CONTRACTING INC04/29/2020
BISOTISSUEDETNA CONTRACTING INC04/29/2020
BISOTISSUEDCITY CODE CONSTRUCTION LL05/15/2019
BISOTISSUEDETNA CONTRACTING INC05/14/2019
BISOTISSUEDETNA CONTRACTING INC05/14/2019
BISPLISSUEDBT'S PLUMBING AND HEATING05/13/2019
BISOTISSUEDCITY CODE CONSTRUCTION LL04/09/2019
BISOTISSUEDCITY CODE CONSTRUCTION LL05/22/2018
BISOTISSUEDETNA CONTRACTING INC05/15/2018
BISOTISSUEDETNA CONTRACTING INC05/15/2018
BISEQISSUEDETNA CONTRACTING INC05/15/2018
BISOTISSUEDCITY CODE CONSTRUCTION LL05/11/2018
BISSPISSUEDMETFLOW FIRE CONTROL LLC05/11/2018
BISPLISSUEDBT'S PLUMBING AND HEATING05/11/2018
BISOTISSUEDETNA CONTRACTING INC05/12/2017
BISEQISSUEDETNA CONTRACTING INC05/12/2017
BISOTISSUEDETNA CONTRACTING INC05/12/2017
BISOTISSUEDDKR CONSTRUCTION CO CORP02/03/2017
BISOTISSUEDNORTH STAR GENERAL CONTR11/15/2016
BISSPISSUEDJ. CAIAZZO PLBG & HTG CORP09/27/2016
BISEQISSUEDSHAH GROUP ENTERPRISES IN06/02/2016
+ 25 more permits on file
1 project · most recent 08/18/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/18/2026Permit IssuedRIGHT TEMP MECHANICAL INCHeating and Air Conditioning Systems
Heat / Cool
Daikin Daikin - RZA24AAVJU 24,000 BTU · Condensing Unit ×1
1 project · most recent 05/16/2018
General Wiring
FiledStatusContractorScope
05/16/2018Permit IssuedRM ELECTRIC CO., INC.General Wiring
1 project · most recent 01/13/2026
Steel Concrete
FiledStatusContractorScope
01/13/2026Permit IssuedECI CONTRACTING GROUP INCSteel, Concrete
1 project · most recent 05/07/2024
Sidewalk Shed
FiledStatusContractorScope
05/07/2024Permit IssuedACE GROUP NY CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/03/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/19/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/31/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
04/23/2026Mechanical SystemsPAUL ANTONIOspecial
04/23/2026FinalPAUL ANTONIOprogress
12/23/2025Structural Steel - WeldingHENLIA CHENspecial
12/23/2025Structural Steel - DetailsHENLIA CHENspecial
12/23/2025Structural Stability – Alterations of existing buildingsHENLIA CHENspecial
12/23/2025FinalMarie Ennisprogress
08/13/2024FinalRAJENDRA PARIKHprogress
09/27/2023FinalRAJENDRA PARIKHprogress
07/22/2021FinalRAJENDRA PARIKHprogress
04/12/2021Heating SystemsRAJENDRA PARIKHspecial
01/28/2021Fire-Resistant Penetrations and JointsRAJENDRA PARIKHspecial
12/30/2020Mechanical SystemsRAJENDRA PARIKHspecial
12/30/2020FinalRAJENDRA PARIKHprogress
▾Documents — 434 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch11
09/03/2026M00445564-P2Request digital key ↗
09/03/2026M00445564-P1Request digital key ↗
09/03/2026M00445564-S4Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/03/2026M00445564-S1Request digital key ↗
08/15/2026M00445564-P1Request digital key ↗
08/15/2026M00445564-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Sign2
09/03/2026M00358541-I1Request digital key ↗
09/03/2026M00358541-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/03/2026M00445564-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/03/2026M00445564-I1Request digital key ↗
▸Applications & Permits101
▸BISPLAN / WORK APPROVAL APPLICATION49
06/03/2024122757105Open ↗
07/30/2021140927460Open ↗
07/21/2021140927460Open ↗
Showing 3 of 49 on file for this type
▸BISWORK PERMIT APPLICATION39
07/16/2022140927460Open ↗
05/14/2019121625349Open ↗
05/14/2019121625349Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWLPC Approval/Permit11
09/03/2026M00358541-P1Open ↗
09/03/2026M00358541-I1Open ↗
08/19/2026M01339236-I1Open ↗
Showing 3 of 11 on file for this type
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
06/24/2021121625349Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications78
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION39
01/24/2020140502070Open ↗
05/23/2019123330591Open ↗
04/08/2019123330591Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/03/2026M00445564-P2Open ↗
09/03/2026M00445564-P1Open ↗
09/03/2026M00445564-S4Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026M01392159-I1Open ↗
09/01/2026M00445564-I1Open ↗
09/01/2026M00445564-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026M01392159-I1Open ↗
09/02/2026M00358541-P1Open ↗
09/01/2026M00445564-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
07/28/2020140927460Open ↗
01/27/2017123003659Open ↗
05/31/2016140502070Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
07/28/2020140927460Open ↗
05/31/2016140502070Open ↗
04/22/2016140486720Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/31/2016140502070Open ↗
04/22/2016140486720Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
02/08/2017123003659Open ↗
Showing 1 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment24
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
08/18/2017123330591Open ↗
08/18/2017123330591Open ↗
05/09/2016122273217Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS3
06/20/2017122273217Open ↗
06/20/2017122273217Open ↗
06/20/2017122273217Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
06/20/2017122273217Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes3
08/18/2017123330591Open ↗
01/27/2017123003659Open ↗
06/14/2016122757105Open ↗
▸BISDS1-Demolition Submittal Certification Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos30
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/03/2026M00445564-P1Open ↗
09/03/2026M00445564-S4Open ↗
09/03/2026M00445564-S1Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
07/28/2020140927460Open ↗
08/18/2017123330591Open ↗
01/27/2017123003659Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU2457MN151
06/24/2021121625349Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
04/17/2019123330591Open ↗
04/17/2019123330591Open ↗
02/08/2018123003659Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
02/08/2018123003659Open ↗
11/07/2016122273217Open ↗
10/25/2016122273217Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/07/2024122757105Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
05/31/2016140502070Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/08/2024122757105Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00445564-S4Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY5
03/12/2024140927460Open ↗
06/24/2021121625349Open ↗
07/28/2020140927460Open ↗
Showing 3 of 5 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
01/24/2020140502070Open ↗
04/06/2018104619600Open ↗
▸Approvals, Objections & Sign-offs61
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST29
06/14/2024122757105Open ↗
03/13/2024140927460Open ↗
06/24/2021121625349Open ↗
Showing 3 of 29 on file for this type
▸BISLANDMARKS APPROVAL13
06/18/2021121625349Open ↗
07/28/2020140927460Open ↗
05/23/2019123330591Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/07/2017123330591Open ↗
05/31/2016140502070Open ↗
Showing 2 of 3 on file for this type
▸BISLANDMARKS SIGNOFF3
06/10/2024122757105Open ↗
06/24/2021121625349Open ↗
02/08/2018123003659Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE3
08/23/2017104619600Open ↗
08/23/2017104619600Open ↗
Showing 2 of 3 on file for this type
▸BISFINAL1
06/08/2024122757105Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
06/18/2021121625349Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/19/2026M01392159-I1Open ↗
▸Cost, Insurance & Ownership33
▸BISCOST AFFIDAVIT32
06/14/2024122757105Open ↗
03/12/2024140927460Open ↗
06/24/2021121625349Open ↗
Showing 3 of 32 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/07/2024122757105Open ↗
▸Filing & Intake Forms57
▸BISBOROUGH INTAKE FORM19
03/06/2020104619600Open ↗
01/24/2020140502070Open ↗
12/16/2019104619600Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET18
08/18/2017123330591Open ↗
08/18/2017123330591Open ↗
01/27/2017123003659Open ↗
Showing 3 of 18 on file for this type
▸BISADDITIONAL INFORMATION17
07/21/2021140927460Open ↗
06/24/2021121625349Open ↗
01/24/2020140502070Open ↗
Showing 3 of 17 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
07/28/2020140927460Open ↗
05/31/2016140502070Open ↗
04/22/2016140486720Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/28/2020140927460Open ↗
Showing 1 of 2 on file for this type