ECB04/10/2026FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN DOB VIOLATION #112125CE31201PT CONTROL #376425. THIS ORDER MANDATES THAT COMPLETE CONSTRUCTION DOCUMENTS(COS) ADDRESSING ALL PERMITS OBJECTIONS ISSUE$25K due
ECB12/10/2025FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN DOB VIOLATION #112125CE31201PT CONTROL #376425. THIS ORDER MANDATED THAT COMPLETE CONSTRUCTION DOCUMENTS(CDS) ADDRESSING ALL PREVIOUS REGISTERED DESI$2K due
DOB11/21/2025DETACHD WOOD-FRAMD BLDG STRUCTURLY COMPROMISD FROM UNPERMTTD STRUCTRAL /FOUNDATION WRK PER 1/07/25 FLYNN,PE RPT,EMERG STABILIZATN DONE; REVSD CDS MISSING AND NO PERMIT OBTAINED. REMEDY: PROVIDE REVISED DETAILED CDS + NARRATIVE ADDRESSING CSENGINEERNG OBJECTIONS; SUBMIT BY 11/28/25 AND FILE/OBTAIN PERMITS BY 12/05/25
DOB10/29/2025FTC-W/COMMISSIONER'S ORDER CONTAINED IN VIO#102825CE31201PT(CONTROL# 376421).REMEDY:COMPLY W/CODE.PROVIDE BUILDABLE DETAILED SIGNED&SEALED SKETCHES,CS INFO & SCHEDULE TO CS ENGINEERING FOR CONSIDERATION COMMENCE WORK UNDER PE & CS OVER SIGHT BY 9AM 11/3/25
DOB10/28/2025EMERGNCY WRK-2STRY+CELLAR WOOD FRM'D BLDG, PART. DEMO'D STRUCTLY COMP- ROMISED. FDN/U.P. WORK W/O PERMIT, ROOF DESTABILIZED,INCOMPLETE LATERAL & GRAVITY LOAD PATH. DANGER OF COLLAPSE. REMEDY: SUBMIT S/S DOCS FOR EMERGNCY WRK BY 4PM, 10/28/25. STRT BY 12PM, 10/29. FILE W/I 48 HRS. FT SUPERVSN BY CS AND PE REQUIRED
DOB10/28/20252-STY+C DETACHD WD FRM BLDG PART DEMO'D, STRUCTURALLY COMPROMISED & EXPOSED. 1-STY REAR ADD'N DEMO'D & REPLACED W NEW 2-STY ADD'N, NO PERMITS. UNSUPPORTED WALLS, SHORING FAIL, DESTABLZED FNDN, COLLAPSE RISK. REMEDY: STRT VISUAL INSPECTION 10/29/25. NYS PE TO PROVIDE MONITORNG PLAN,TAKE DAILY READNGS,BASELINE BY 10/31,ALERT DOB OF CHNGS
DOB10/22/2025ATOI, OBSERVED AT EXP. 3, WORK WITHOUT A PERMIT OR D.O.B APPROVAL FOR VERTICAL AND HORIZONTAL ENLARGEMENT. ALL 3 FLOORS ARE ERECTED WITH WALLS, WOOD FRAMING, NEW FLOOR JOISTS ON EACH FLOOR. ALSO, THE EXTENSION AT REAR IS NOT PROPERLY SUPPORTED. THERE ALSO CUT OUTS FOR WINDOWS ON EACH LEVELS.
DOB10/22/2025OBSERVED HORIZONTAL/ VERTICAL ENLARGEMENT AT EXP. 3 FROM THE GROUND TO THE 3RD FLOOR, INCLUDING NEW JOISTS AND WALLS, THE INSTALLATION OF TEMPORARY SHORING AT THE INTERIOR 3RD-FLOOR REAR, AND THE REMOVAL OF INTERIOR PARTITIONS THROUGHOUT AND SIGNIFICANT DEBRIS BUILD-UP AT EXTERIOR EXPS. 3 & 4 POSSIBLY SURCHARGING EXISTING CMU FENCE WALL.
DOB05/22/2025FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER . NOTED : AT TIME OF INSPECTION OBSERVED AT EXPOSURE 1 AT PORCH ,THERE IS HOLES IN THE CEILING , ,THE STOOP AND CONCRETE FLOOR HAS CRACKS AT VARIOUS LOCATIONS, ALSO THE BASE OF THE COLUMNS HAS DETERIORATED ,AND CAN COLLAPSE, THIS IS HAZARDOUS , AND NEED TO BE ADDRESSED IMMEDIATELY .
ECB05/22/2025FAILURE TO MAINTAIN IN CODE COMPLIANT MANNER . NOTED : AT TIME OF INSPECTION , OBSERVED AT EXPOSURE 1 LOOSE SHINGLES AT ROOF LEVEL, ALSO HOLES AT CEILING ABOVE THE PORCH , THE STOOP, AND PORCH HAS CRACKS AT VAR$12K due
HPD01/26/2010SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY
HPD01/26/2010SECTION 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES RANGE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY
HPD01/21/2010SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY
ECB11/03/2025FAILURE TO COMPLY WITH A COMMISSIONER'S ORDER TO PROVIDE AN N1-ENGINEERING REPORT WITHIN 7 DAYS OF THE OBSERVED CONDITIONS RELATED TO COMPLAINT # 3A32236 & 3A34204 ON 10/22/2025,THE REPORT SHOULD HAVE BEEN RECEHearing held — result not yet published$2K proposed
ECB10/28/2025OBSERVED AT TIME OF INSPECTION WORK DONE AT THE SUBJECT LOCATION WHILE A FULL SWO IS IN EFFECT., COMPLY WITH STOP WORK ORDERHearing held — result not yet published$10K proposed
ECB10/21/2025FSWO ISSUED AT TIME OF INSPECTION OBSERVED AT EXPOSURE 3 WORK WITHOUT A PERMIT OR D.O.B APPROVAL VERTICAL AND HORIZONTAL ENLARGEMENT ALL THREE FLOORS ERECTED WITH WALLS WOOD FRAMING,NEW FLOOR JOIST ON EACH FLOOHearing held — result not yet published$2K proposed
ECB10/21/2025FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER AT TIME OF INSPECTION OBSERVED EXCESSIVE AMOUNT OF CONSTRUCTION WOOD DEBRIS EXCEED 10 CUBIT YARD OF COMBUSTIBLE MATERIAL TRASH AT THE REAR YARD CAN CAUSE AHearing held — result not yet published$1K proposed
ECB02/19/2016FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER:FAILURE TO MAINTAIN BOILER:OBSERVATION HAS BEEN MADE IN BSMT BOILER MISSING SPILL SWITCH & VENT (DAMPER) PHOTO TAKEN.REM:MAINTAIN BOILER.Nothing owed — awaiting certificate of correction
ECB10/15/2002WORK WITHOUT A PERMIT. WORK NOTED: PARTITIONS ERECTED TO CREATE SEPARATE ROOM PLUS FUCE 3PC BATHROOM INSTALLED I BASEMENT OF PREMISES NO KITCHEN IN BASEMENT. REMEDY; OBTAIN PERMITS AND APPROVALS IF FEASIBLE ORNothing owed — awaiting certificate of correction