Single or multiple dwelling with stores or offices
400 MYRTLE AVENUE
BROOKLYN · BIN 3344740
💬 Discuss this project
1925Year Built
4Stories
S9Building Class
R7AZoning
6,345 sfGross Floor Area
7Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 400 MYRTLE AVENUE LLC · 2,250 sf lot · 2.82 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Roof5p · 2 filings · 15 docs
Cellar2p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ATLAS NYC PROPERTY MANAGEMENT1207/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ELEVATED ENGINEERING, PLLC509/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM CONSULTING GROUP, INC.503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JACOBS TELECOMMUN. INCGeneral Contractor407/08/2026
RELAINCE-TECH INCGeneral Contractor407/08/2026
HUDSON PLMBING & MCH, LLCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ELEVATED ENGINEERING PLLC3692308/09/2024
Building Lifecycle
All (27)Filed (5)Permit Issued (6)Inspection (2)Objection (6)Special Inspection (8)
06/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/26/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
09/05/2024
Filed — Alteration
Installation of gas meter and gas piping as per plans. No change to occupancy, use, or egress.
B00748532-P1
08/14/2024
Special inspection requirement — Mechanical Systems
NICHOLAS BARILE
08/14/2024
Special inspection requirement — Final
NICHOLAS BARILE
08/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
NICHOLAS BARILE
08/09/2024
Filed — Alteration
Installation of non-emergency gas fired generator on roof. No change to occupancy, use, or egress.
B00748520-P1
08/01/2024
Permit issued — Antenna
B00748508-I1-AN
08/01/2024
Permit issued — Plumbing
B00748532-I1-PL
08/01/2024
Permit issued — Mechanical Systems
B00748520-I1-MS
08/01/2024
Special inspection requirement — Final
NICHOLAS BARILE
08/01/2024
Special inspection requirement — Tenant Protection Plan Compliance
08/01/2024
Special inspection requirement — Mechanical Systems
NICHOLAS BARILE
08/01/2024
Special inspection requirement — Tenant Protection Plan Compliance
NICHOLAS BARILE
06/22/2023
Permit issued — Antenna
B00748508-I1-AN
06/20/2023
Permit issued — Mechanical Systems
B00748520-I1-MS
06/20/2023
Permit issued — Plumbing
B00748532-I1-PL
04/12/2023
Objection resolved — Addressed
04/12/2023
Objection resolved — Addressed
04/12/2023
Objection resolved — Addressed
03/28/2023
Objection raised — Inspections
03/28/2023
Objection raised — Scope
03/28/2023
Objection raised — Zoning
03/22/2023
Filed — Alteration
Installation of non-emergency gas fired generator on roof. No change to occupancy, use, or egress.
B00748520-I1
03/22/2023
Filed — Alteration
Installation of gas meter and gas piping as per plans. No change to occupancy, use, or egress.
B00748532-I1
03/22/2023
Filed — Alteration
AT&T - Installation of new steel dunnage platform with related cabinets on roof. Installation of GPS antenna. Related service connection. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
B00748508-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaPermit IssuedARMENTUM DIGITAL INFRASTR08/01/2024
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC08/01/2024
DOB NOWMechanical SystemsPermit IssuedARMENTUM DIGITAL INFRASTR08/01/2024
DOB NOWAntennaPermit IssuedRELAINCE-TECH INC06/22/2023
DOB NOWMechanical SystemsPermit IssuedRELAINCE-TECH INC06/20/2023
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC06/20/2023
1 project · most recent 08/09/2024
Generators
FiledStatusContractorScopeMake / Model / Capacity
08/09/2024Permit IssuedJACOBS TELECOMMUN. INCGenerators
Generators
Polar Power V027G500TE002 Generator ×2
1 project · most recent 09/05/2024
Gas
FiledStatusContractorScope
09/05/2024Signed-offHUDSON PLMBING & MCH, LLCGas
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/26/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
09/09/2024Tenant Protection Plan Compliance—special
08/14/2024Mechanical SystemsNICHOLAS BARILEspecial
08/14/2024FinalNICHOLAS BARILEprogress
08/14/2024Tenant Protection Plan ComplianceNICHOLAS BARILEspecial
08/01/2024FinalNICHOLAS BARILEprogress
08/01/2024Tenant Protection Plan Compliance—special
08/01/2024Mechanical SystemsNICHOLAS BARILEspecial
08/01/2024Tenant Protection Plan ComplianceNICHOLAS BARILEspecial
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026B00748532-P1Request digital key ↗
08/27/2026B00748532-I1Request digital key ↗
08/24/2026B00748520-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026B00748532-P1Open ↗
08/27/2026B00748532-I1Open ↗
08/24/2026B00748520-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B00748520-P1Open ↗
09/02/2026B00748520-P1Open ↗
08/25/2026B00748520-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026B00748520-P1Open ↗
08/25/2026B00748520-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026B00748532-P1Open ↗
08/27/2026B00748532-I1Open ↗
08/24/2026B00748520-I1Open ↗
Showing 3 of 5 on file for this type