← Back
BuildNYC
Four families
400 ROCKAWAY PARKWAY
BROOKLYN · BIN 3101949
💬 Discuss this project
1930Year Built
2Stories
C3Building Class
R6Zoning
3,198 sfGross Floor Area
4Units
Rent Stabilized11 Active Violations ▸FDNY Report ↗
Four families · 2,500 sf lot · 1.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofStructural Design for Interior Renovation of Existing ResideUnder Construction13p · 1 filing · 20 docs
Floor 2Structural Design for Interior Renovation of Existing ResideUnder Construction18p · 1 filing · 20 docs
Floor 1Structural Design for Interior Renovation of Existing ResideUnder Construction39p · 1 filing · 20 docs
CellarStructural Design for Interior Renovation of Existing ResideUnder Construction4p · 1 filing · 20 docs
BasementStructural Design for Interior Renovation of Existing ResideUnder Construction26p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Highline Realty Group1511/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/12/2026$999K—— → —$312/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Vasilios Artemiou PE211/06/2026
Adb Associates710/14/2026
Pramodray Shah, P.E105/13/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC Design File303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Revamp NYCGeneral Contractor309/07/2026
Revamp NYCScaffold107/09/2026
Brook Plumbing & HeatingFire Protection108/26/2026
Pipe Solutions AdvisPlumbing110/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RI Consulting Services8904711/06/2026
Building Lifecycle
11/06/2026
Filed — Alteration CO
Filing Mechanical application subsequent to primary job number B01281423-I1.
B01281423-P4
11/04/2026
Special inspection requirement — Sprinkler Systems
Md Istiaque Hasan
11/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Md Istiaque Hasan
11/04/2026
Special inspection requirement — Post-installed Anchors
Md Istiaque Hasan
10/23/2026
Signed off — Alteration CO
Filing Mechanical application subsequent to primary job number B01281423-I1.
B01281423-S5
91 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPipe Solutions Advis10/08/2026
DOB NOWStructuralSigned-offRevamp NYC09/01/2026
DOB NOWSprinklersPermit IssuedBrook Plumbing & Heating08/25/2026
DOB NOWGeneral ConstructionPermit IssuedRevamp NYC07/09/2026
DOB NOWConstruction FenceSigned-offRevamp NYC07/07/2026
DOB NOWMechanical SystemsPermit IssuedRevamp NYC07/07/2026
1 project · most recent 11/06/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
11/06/2026Signed-offRevamp NYCHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 11/06/2026
Sprinkler System
FiledStatusContractorScope
11/06/2026Permit IssuedBrook Plumbing & HeatingSprinkler System
1 project · most recent 11/06/2026
Storm Water/Sanitary
FiledStatusContractorScope
11/06/2026Permit IssuedPipe Solutions AdvisStorm, Water/Sanitary
3 projects · most recent 09/22/2026
General Wiring
FiledStatusContractorScope
09/22/2026Permit IssuedPower Direct ElectricGeneral Wiring
09/15/2026Permit IssuedAG Power ElectricGeneral Wiring
07/30/2026Permit IssuedAG Power Electric—
1 project · most recent 11/06/2026
Steel Wood
FiledStatusContractorScope
11/06/2026Permit IssuedPipe Solutions AdvisSteel, Wood
1 project · most recent 11/06/2026
Fence
FiledStatusContractorScope
11/06/2026Permit IssuedPipe Solutions AdvisFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/27/2026Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
11/04/2026Sprinkler SystemsMd Istiaque Hasanspecial
11/04/2026Fire-Resistant Penetrations and JointsMd Istiaque Hasanspecial
11/04/2026Post-installed AnchorsMd Istiaque Hasanspecial
10/13/2026Maintenance informationMd Istiaque Hasanenergy_progress
10/13/2026HVAC-R and service water piping design and insulationMd Istiaque Hasanenergy_progress
10/13/2026HVAC-R and service water heating system controlsMd Istiaque Hasanenergy_progress
10/13/2026HVAC-R and service water heating equipmentMd Istiaque Hasanenergy_progress
10/13/2026Fire-Resistant Penetrations and JointsMd Istiaque Hasanspecial
10/13/2026Energy Code Compliance InspectionsMd Istiaque Hasanprogress
08/21/2026Energy Code Compliance Inspections—progress
08/21/2026Maintenance information—energy_progress
08/21/2026HVAC-R and service water piping design and insulation—energy_progress
08/21/2026HVAC-R and service water heating equipment—energy_progress
08/21/2026HVAC-R and service water heating system controls—energy_progress
08/21/2026Fire-Resistant Penetrations and Joints—special
06/05/2026Energy Code Compliance Inspections—progress
06/05/2026HVAC-R and service water heating equipment—energy_progress
06/05/2026HVAC-R and service water piping design and insulation—energy_progress
06/05/2026Maintenance information—energy_progress
06/05/2026HVAC-R and service water heating system controls—energy_progress
06/05/2026Fire-Resistant Penetrations and Joints—special
05/13/2026Wood – Prefabricated I-JoistsMd Istiaque Hasanspecial
05/13/2026Structural Wood FrameMd Istiaque Hasanprogress
05/13/2026Structural Steel - DetailsMd Istiaque Hasanspecial
05/13/2026Structural Cold-Formed SteelMd Istiaque Hasanspecial
Latest 25 of 59.
46 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account