General warehouse
400 THATFORD AVENUE
BROOKLYN · BIN 3326671
💬 Discuss this project
1930Year Built
1Stories
E1Building Class
M1-4/R6AZoning
16,740 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
General warehouse · Owner of record: 400 THATFORD RESIDENCE LLC · 14,000 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction46p · 4 filings · 20 docs
Bulkhead2p · 1 filing · 6 docs
Penthouse2p · 2 filings · 6 docs
Floor 62p · 2 filings · 6 docs
Floor 51p · 1 filing
Floor 4
Floor 3Under Construction50p · 2 filings · 20 docs
Floor 2Under Construction49p · 3 filings · 20 docs
Floor 1Under Construction51p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KAY BUILDERS403/22/2026
SHY ANNE CASUALS INC403/22/2026
2973 WEBB AVE203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/10/2024$6.0M—400 THATFORD HOLDINGS LLC → 400 THATFORD RESIDENCE LLC$358/sf building
01/31/2020$4.5M—— → —$266/sf building
01/31/2019$3.2M—SHY ANNE CASUALS, INC. → STONEHILL 400 LLC$191/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SPEEDY EXPEDITING3803/21/2026
ELLIPSES DESIGN603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KAY BUILDERS INCGeneral Contractor1207/08/2026
RIGHTWAY PLBG AND HTG INCFire Protection207/08/2026
CS BRIDGE CORPGeneral Contractor207/08/2026
MPI PLUMBING CORPPlumbing207/08/2026
INFINITY MANAGEMENT NY LLGeneral Contractor107/08/2026
PRECISION BUILDERS USAGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161507/14/2026
ENGINEERING CONSULTING SE2050210/20/2022
AUTOMATED DESIGN CONSULTA895208/01/2022
Building Lifecycle
All (132)Filed (30)Permit Issued (20)Signed Off (6)Violation (24)Inspection (13)Objection (9)Special Inspection (30)
08/19/2026
Violation issued (HPD, open)
B
07/14/2026
Filed — Alteration
Installation of Active Sub-Slab Depressurization System (SSDS) NYC OER Project Nos. 21 TMP 1253K, 21EH-A264K filed in conjunction with Alteration B01047985-I1
B01183776-P1
07/14/2026
Special inspection requirement — Final
FAHAD FATEH
07/14/2026
Special inspection requirement — Mechanical Systems
FAHAD FATEH
07/13/2026
Special inspection requirement — Final
FAHAD FATEH
07/13/2026
Special inspection requirement — Mechanical Systems
FAHAD FATEH
05/18/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/18/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/08/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/28/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/28/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
04/28/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
04/28/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
04/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/28/2026
Special inspection requirement — Air barrier — testing
FAHAD FATEH
04/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
04/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
04/28/2026
Special inspection requirement — Metering
FAHAD FATEH
04/28/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
04/28/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
04/28/2026
Special inspection requirement — Permanent certificate
FAHAD FATEH
04/28/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
FAHAD FATEH
04/28/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
04/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
04/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/14/2026
Permit issued — General Construction
B01047985-I1-GC
03/15/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
03/15/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
03/15/2026
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
03/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
03/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
03/10/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
03/09/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/06/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
03/04/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
03/04/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
02/25/2026
Special inspection requirement — Ventilation and air distribution system
FAHAD FATEH
02/25/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/24/2026
Signed off — Alteration
B00542169-I1
02/24/2026
Filed — Alteration CO
UNDERGROUND PLUMBING FILED IN CONJUNCTION WITH ALT # B01047985-I1
B01047985-P8
02/24/2026
Signed off — Alteration CO
UNDERGROUND PLUMBING FILED IN CONJUNCTION WITH ALT # B01047985-I1
B01047985-S5
02/19/2026
Objection resolved — Addressed
02/16/2026
Objection raised — Other
02/10/2026
Violation issued (ECB, closed)
Construction
02/09/2026
Permit issued — Mechanical Systems
B01047985-S2-MS
02/06/2026
Permit issued — Construction Fence
B01047985-S5-FN
02/06/2026
Permit issued — General Construction
B01047985-I1-GC
02/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/03/2026
Violation issued (ECB, closed)
Unknown
02/03/2026
Violation issued (ECB, closed)
Site Safety
01/30/2026
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01238122-I1
01/30/2026
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01237191-I1
01/20/2026
Filed — Alteration CO
UNDERGROUND PLUMBING FILED IN CONJUNCTION WITH ALT # B01047985-I1
B01047985-P7
12/23/2025
Signed off — Alteration CO
UNDERGROUND PLUMBING FILED IN CONJUNCTION WITH ALT # B01047985-I1
B01047985-S1
12/23/2025
Signed off — Alteration CO
UNDERGROUND PLUMBING FILED IN CONJUNCTION WITH ALT # B01047985-I1
B01047985-S6
12/03/2025
Filed — Alteration CO
UNDERGROUND PLUMBING FILED IN CONJUNCTION WITH ALT # B01047985-I1
B01047985-P6
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKAY BUILDERS INC04/14/2026
DOB NOWMechanical SystemsSigned-offKAY BUILDERS INC02/09/2026
DOB NOWConstruction FenceSigned-offKAY BUILDERS INC02/06/2026
DOB NOWGeneral ConstructionPermit IssuedKAY BUILDERS INC02/06/2026
DOB NOWPlumbingSigned-offYG SERVICES INC10/28/2025
DOB NOWStandpipeSigned-offRIGHTWAY PLBG AND HTG INC09/10/2025
DOB NOWSprinklersSigned-offRIGHTWAY PLBG AND HTG INC09/10/2025
DOB NOWMechanical SystemsSigned-offKAY BUILDERS INC08/04/2025
DOB NOWGeneral ConstructionPermit IssuedKAY BUILDERS INC07/31/2025
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP06/11/2025
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP06/11/2025
DOB NOWEarth WorkSigned-offKAY BUILDERS INC04/28/2025
DOB NOWMechanical SystemsPermit IssuedKAY BUILDERS INC03/10/2025
DOB NOWFoundationSigned-offKAY BUILDERS INC03/05/2025
DOB NOWPlumbingSigned-offYG SERVICES INC03/05/2025
DOB NOWFoundationSigned-offKAY BUILDERS INC02/19/2025
DOB NOWStructuralSigned-offKAY BUILDERS INC02/18/2025
DOB NOWConstruction FenceSigned-offKAY BUILDERS INC02/12/2025
DOB NOWConstruction FenceSigned-offINFINITY MANAGEMENT NY LL10/24/2023
DOB NOWConstruction FenceSigned-offPRECISION BUILDERS USA06/14/2022
2 projects · most recent 07/14/2026
Others Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/14/2026Permit IssuedKAY BUILDERS INCOthers
Other
Radonaway GX5 Pro 98 CFM · Exhaust Fan ×2
Stego 20 Mil Vapor Barrier 1 CFM ×2
02/24/2026Permit IssuedKAY BUILDERS INCHeating and Air Conditioning Systems, Heating Systems
Heat / Cool
Samsung AR12DXFAMWKXCV 12,000 BTU · Heat Pump Outdoor ×44
AR15DXFAMWKXCV 15,000 BTU · Vrf Indoor ×22
AR18DXFAMWKXCV 18,000 BTU · Heat Pump Outdoor ×18
Amana PTH153J30 14,400 BTU · Ptac ×28
Daikin AR15DXFAMWKXCV 15,000 BTU · Heat Pump Outdoor ×24
Heating
Qmark LFK-151F 1,500 BTU · Electric Heater ×8
MUH0381 3 kW · Electric Heater ×6
1 project · most recent 02/24/2026
Sprinkler System
FiledStatusContractorScope
02/24/2026Signed-offRIGHTWAY PLBG AND HTG INCSprinkler System
1 project · most recent 02/24/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/24/2026Signed-offMPI PLUMBING CORPGas, Storm, Water/Sanitary
3 projects · most recent 04/26/2026
General Wiring
FiledStatusContractorScope
04/26/2026CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
06/09/2025CompleteNASH ELECTRIC SERVICES IN—
05/05/2025CompleteHIVOLTS ELECTRICAL INC—
1 project · most recent 10/20/2022
Concrete
FiledStatusContractorScope
10/20/2022——Concrete
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
05/18/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/18/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/08/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/10/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/09/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/06/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/04/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
03/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 96
DateRequirementInspectorRole
07/14/2026FinalFAHAD FATEHprogress
07/14/2026Mechanical SystemsFAHAD FATEHspecial
07/13/2026FinalFAHAD FATEHprogress
07/13/2026Mechanical SystemsFAHAD FATEHspecial
04/28/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
04/28/2026Interior lighting powerFAHAD FATEHenergy_progress
04/28/2026Maintenance informationFAHAD FATEHenergy_progress
04/28/2026MeteringFAHAD FATEHenergy_progress
04/28/2026Permanent certificateFAHAD FATEHenergy_progress
04/28/2026Fenestration air leakageFAHAD FATEHenergy_progress
04/28/2026Air barrier — testing FAHAD FATEHenergy_progress
04/28/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
04/28/2026Fenestration areasFAHAD FATEHenergy_progress
04/28/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
04/28/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
04/28/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
04/28/2026Alternative Materials - OTCR Buildings Bulletin NumberFAHAD FATEHspecial
04/28/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
04/28/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/15/2026Maintenance informationFAHAD FATEHenergy_progress
03/15/2026Post-installed AnchorsFAHAD FATEHspecial
03/15/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/15/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
03/15/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
03/15/2026HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
Latest 25 of 96.
▾Documents — 250 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch30
09/01/2026B00542169-I1Request digital key ↗
08/30/2026B00702547-I1Request digital key ↗
08/30/2026B00702547-P1Request digital key ↗
Showing 3 of 30 on file for this type
▸Applications & Permits31
▸BISPLAN / WORK APPROVAL APPLICATION25
02/10/2026320520566Open ↗
02/02/2026321600353Open ↗
01/30/2026320329550Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWHPD - Permit Notice4
08/21/2026B01047985-I1Open ↗
08/13/2026B01047985-I1Open ↗
08/13/2026B01047985-P5Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
01/28/2026320520566Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
12/04/2024340841619Open ↗
▸Zoning, Tax Lot & Property Records15
▸DOB NOWZD1: DOB Zoning Diagram4
08/21/2026B01047985-P9Open ↗
08/21/2026B01047985-I1Open ↗
08/13/2026B01047985-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWRestrictive Declaration/Easement 13
08/21/2026B01047985-P9Open ↗
08/21/2026B01047985-I1Open ↗
08/13/2026B01047985-P5Open ↗
▸DOB NOWRestrictive Declaration/Easement 23
08/21/2026B01047985-I1Open ↗
08/21/2026B01047985-P9Open ↗
08/13/2026B01047985-P5Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/21/2026B01047985-P9Open ↗
08/13/2026B01047985-P5Open ↗
08/13/2026B01047985-I1Open ↗
▸BISZONING DIAGRAM1
06/22/2021321600353Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/21/2026B01047985-I1Open ↗
▸Seals & Professional Certifications74
▸DOB NOWDPL-1: Design Professional Seal & Signature30
09/01/2026B00542169-I1Open ↗
08/30/2026B00702547-P1Open ↗
08/30/2026B00702547-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/05/2026B01183776-P1Open ↗
09/01/2026B01047985-P4Open ↗
08/29/2026B01047985-P8Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/05/2026B01183776-P1Open ↗
09/01/2026B01047985-P4Open ↗
09/01/2026B01047985-P4Open ↗
Showing 3 of 20 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/20/2022340841619Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/20/2022340841619Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/30/2012320520566Open ↗
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST3
12/04/2024340841619Open ↗
09/15/2022340841619Open ↗
06/22/2021321600353Open ↗
▸DOB NOWStreet Tree Checklist3
08/21/2026B01047985-P9Open ↗
08/13/2026B01047985-I1Open ↗
08/13/2026B01047985-P5Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/04/2024340841619Open ↗
▸DOB NOWStreet Tree Sign Off1
08/21/2026B01047985-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/21/2026B01047985-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01047985-I1Open ↗
▸Environmental & Asbestos47
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
08/30/2026B00702547-I1Open ↗
08/30/2026B00702547-P1Open ↗
08/30/2026B00707355-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWOER: Notice to Proceed14
08/21/2026B01047985-S4Open ↗
08/21/2026B01047985-I1Open ↗
08/13/2026B00702547-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWOER: Notice of Satisfaction7
08/22/2026B01183776-I1Open ↗
08/21/2026B01047985-S4Open ↗
08/13/2026B01047985-S6Open ↗
Showing 3 of 7 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
09/15/2022340841619Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/22/2021321600353Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/22/2026B01183776-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/30/2012320520566Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
06/22/2021321600353Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT2
08/13/2026B00702547-P1Open ↗
08/13/2026B00702547-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/22/2021321600353Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00702547-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00702547-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISSCHEDULE A - OCCUPANCY / USE5
02/11/2022321600353Open ↗
02/09/2022321600353Open ↗
02/08/2022321600353Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
07/30/2012320520566Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
06/22/2021321600353Open ↗
07/30/2012320520566Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
12/04/2024340841619Open ↗
09/15/2022340841619Open ↗
01/26/2022321600353Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
07/30/2012320520566Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/20/2022340841619Open ↗
▸Other Documents22
▸DOB NOWPlot Diagram5
08/21/2026B01047985-P9Open ↗
08/13/2026B01047985-P5Open ↗
08/13/2026B01047985-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial3
08/21/2026B01047985-P9Open ↗
08/13/2026B01047985-I1Open ↗
08/13/2026B01047985-P5Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/21/2026B01047985-P9Open ↗
08/13/2026B01047985-I1Open ↗
08/13/2026B01047985-P5Open ↗
▸DOB NOWProperty Ownership Certification3
08/21/2026B01047985-P9Open ↗
08/13/2026B01047985-P5Open ↗
08/13/2026B01047985-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
11/14/2022340841619Open ↗
09/15/2022340841619Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00702547-I1Open ↗
08/13/2026B01047985-S6Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
06/22/2021321600353Open ↗
▸BISSupporting Document: Fee Exempt1
09/15/2022340841619Open ↗
▸BISSupporting Document: Fee Deferment1
06/22/2021321600353Open ↗
▸DOB NOWFinal Survey1
08/21/2026B01047985-I1Open ↗