LL97 Covered1 Open Violation ▸FISP: SAFEFDNY Report ↗
General warehouse · Owner of record: 19-20 BUSH TERMINAL OWNER LP · 223,374 sf lot · 5.93 FAR built · Flood zone X500
Locations of Work
StructuralMechanicalPlumbing
Roof2p · 1 filing · 20 docs
Floor 51p · 1 filing · 4 docs
Floor 4
Floor 3
Floor 21p · 1 filing · 13 docs
Floor 11p · 1 filing · 13 docs
Basement1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
INDUSTRY CITY3607/08/2026
OWNERS REP503/22/2026
CM&B CONSTRUCTION203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANDREW MAASS1703/21/2026
JACK JAFFA & ASSOCIATES403/21/2026
KUSHNER STUDIOS103/21/2026
WILLIAM VITACCO ASSOCIATES203/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSTRUCTION MANAGEMENT &General Contractor607/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor603/21/2026
BLUEWATER PLBG& HTG INCPlumbing507/08/2026
NEWGRANGE CONSTRUCTION COGeneral Contractor303/21/2026
TRISTATE PLBG SVCSPlumbing303/22/2026
PATRIOT ELECTRIC CORPElectrical203/22/2026
G.A.M.C.N.Y. LLCGeneral Contractor203/21/2026
ORBIT PLBG & HTG INCPlumbing207/08/2026
TRISTATE PLBG SVCS CORPPlumbing107/08/2026
ASHLAR MECHANICAL CORPFire Protection107/08/2026
WJP BUILDERS CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SKYLINE ENGINEERING, PLLC267812/22/2020
SIA INSPECTIONS LLC7306211/05/2020
KENDALL ENGINEERING PC4154111/05/2019
Building Lifecycle
All (77)Filed (23)Permit Issued (16)Signed Off (9)Facade (FISP) (9)Violation (1)Objection (2)Special Inspection (17)
02/21/2023
Cycle 9 facade report submitted
02/21/2023
Cycle 9 facade report signed — SAFE
01/06/2023
Cycle 9 facade inspection completed
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/28/2021
Signed off — Alteration
B00335144-I1
05/07/2021
Signed off — Alteration
Filing herewith for plumbing work as per plans for whole foods fit out
B00335156-I1
04/26/2021
Signed off — Alteration
Filing herewith for boiler work as per plans for whole foods fit out. No Change to use, egress or occupancy.
B00337868-I1
03/04/2021
Objection resolved — Addressed
03/03/2021
Signed off — Alteration
INstallation of 1 new toilet exhaust fan connected to 1 new louver
B00421319-I1
03/03/2021
Signed off — Alteration
Plumbing work to partial 5th floor as per plans filed herewith
B00420010-I1
02/25/2021
Objection raised — Other
02/24/2021
Filed — Alteration
Plumbing work related to interior renovation as shown on plans filed herewith. PAA filed to add Kitchen Fire Suppression System Emergency Shut Off Valves (6).
B00361835-P1
02/23/2021
Permit issued — Mechanical Systems
B00421319-I1-MS
02/12/2021
Filed — Alteration
Filing herewith for plumbing work as per plans for whole foods fit out
B00335156-P3
01/27/2021
Permit issued — Plumbing
B00420010-I1-PL
01/21/2021
Filed — Alteration
Filing herewith for boiler work as per plans for whole foods fit out. No Change to use, egress or occupancy.
B00337868-P4
01/12/2021
Permit issued — Mechanical Systems
B00361829-I1-MS
01/08/2021
Permit issued — Boiler Equipment
B00337868-I1-BE
01/04/2021
Permit issued — Plumbing
B00335156-I1-PL
12/22/2020
Filed — Alteration
Filing herewith for boiler work as per plans for whole foods fit out. No Change to use, egress or occupancy.
B00337868-P3
12/22/2020
Filed — Alteration
B00335144-P6
12/07/2020
Signed off — Alteration
B00346549-I1
12/07/2020
Signed off — Alteration
B00357161-I1
11/24/2020
Permit issued — Plumbing
B00361835-I1-PL
11/09/2020
Special inspection requirement — Mechanical Systems
Matthew Wavro
11/09/2020
Special inspection requirement — Final
Matthew Wavro
11/05/2020
Filed — Alteration
INstallation of 1 new toilet exhaust fan connected to 1 new louver
B00421319-I1
11/05/2020
Filed — Alteration
Plumbing work to partial 5th floor as per plans filed herewith
B00420010-I1
11/04/2020
Filed — Alteration
Filing herewith for boiler work as per plans for whole foods fit out. No Change to use, egress or occupancy.
B00337868-P2
10/29/2020
Special inspection requirement — Post-installed Anchors
SOFIA KAPELYAN
10/29/2020
Special inspection requirement — Mechanical Systems
JEFF AKERMAN
10/29/2020
Special inspection requirement — Post-installed Anchors
SOFIA KAPELYAN
10/29/2020
Special inspection requirement — Final
SOFIA KAPELYAN
10/29/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
JEFF AKERMAN
10/21/2020
Signed off — Alteration
B00335159-I1
09/01/2020
Filed — Alteration
B00335144-P3
08/31/2020
Filed — Alteration
Filing herewith for boiler work as per plans for whole foods fit out. No Change to use, egress or occupancy.
B00337868-P1
08/27/2020
Special inspection requirement — Mechanical Systems
Matthew Wavro
08/27/2020
Special inspection requirement — Final
Matthew Wavro
08/21/2020
Filed — Alteration
Filing herewith for plumbing work as per plans for whole foods fit out
B00335156-P2
07/24/2020
Special inspection requirement — Structural Steel - Welding
Matthew Wavro
07/24/2020
Special inspection requirement — Post-installed Anchors
Matthew Wavro
07/24/2020
Special inspection requirement — Final
Matthew Wavro
07/24/2020
Special inspection requirement — Concrete - Cast-In-Place
Matthew Wavro
07/21/2020
Permit issued — Construction Fence
B00356134-I1-FN
07/17/2020
Filed — Alteration
B00335159-P2
07/16/2020
Permit issued — Boiler Equipment
B00337868-I1-BE
07/02/2020
Filed — Alteration
B00335144-P2
07/02/2020
Filed — Alteration
Filing herewith for plumbing work as per plans for whole foods fit out
B00335156-P1
07/01/2020
Special inspection requirement — Mechanical Systems
Matthew Wavro
07/01/2020
Special inspection requirement — Final
Matthew Wavro
06/23/2020
Permit issued — Sidewalk Shed
B00357161-I1-SH
06/17/2020
Permit issued — Construction Fence
B00356134-I1-FN
06/15/2020
Filed — Alteration
B00357161-I1
06/12/2020
Permit issued — Structural
B00335159-I1-ST
06/11/2020
Permit issued — Sprinklers
B00351295-I1-EW-SP
06/10/2020
Permit issued — Mechanical Systems
B00335144-I1-MS
06/05/2020
Filed — Alteration
B00335144-P1
06/05/2020
Filed — Alteration
B00335159-P1
06/05/2020
Permit issued — Supported Scaffold
B00346549-I1-SF
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offWJP BUILDERS CORP02/23/2021
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC01/27/2021
DOB NOWMechanical SystemsSigned-offNEWGRANGE CONSTRUCTION CO01/12/2021
DOB NOWBoiler EquipmentSigned-offBLUEWATER PLBG& HTG INC01/08/2021
DOB NOWPlumbingSigned-offBLUEWATER PLBG& HTG INC01/04/2021
DOB NOWPlumbingSigned-offTRISTATE PLBG SVCS CORP11/24/2020
DOB NOWConstruction FenceSigned-offCONSTRUCTION MANAGEMENT &07/21/2020
DOB NOWBoiler EquipmentSigned-offBLUEWATER PLBG& HTG INC07/16/2020
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC06/23/2020
DOB NOWConstruction FenceSigned-offCONSTRUCTION MANAGEMENT &06/17/2020
DOB NOWStructuralSigned-offCONSTRUCTION MANAGEMENT &06/12/2020
DOB NOWSprinklersSigned-offASHLAR MECHANICAL CORP06/11/2020
DOB NOWMechanical SystemsSigned-offCONSTRUCTION MANAGEMENT &06/10/2020
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC06/05/2020
DOB NOWPlumbingSigned-offBLUEWATER PLBG& HTG INC06/02/2020
DOB NOWMechanical SystemsSigned-offGAMCNY11/08/2019
4 projects · most recent 03/10/2021
General Wiring
FiledStatusContractorScope
03/10/2021CompleteKINGS ELECTRIC CO., INC.General Wiring
08/31/2020CompletePATRIOT ELECTRIC CORPGeneral Wiring
06/29/2020CompleteV. VASS ELECTRIC CORP—
05/12/2020CompletePATRIOT ELECTRIC CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
11/09/2020Mechanical SystemsMatthew Wavrospecial
11/09/2020FinalMatthew Wavroprogress
10/29/2020Post-installed AnchorsSOFIA KAPELYANspecial
10/29/2020Mechanical SystemsJEFF AKERMANspecial
10/29/2020Post-installed AnchorsSOFIA KAPELYANspecial
10/29/2020FinalSOFIA KAPELYANprogress
10/29/2020Fire-Resistant Penetrations and JointsJEFF AKERMANspecial
08/27/2020Mechanical SystemsMatthew Wavrospecial
08/27/2020FinalMatthew Wavroprogress
07/24/2020Structural Steel - WeldingMatthew Wavrospecial
07/24/2020Post-installed AnchorsMatthew Wavrospecial
07/24/2020FinalMatthew Wavroprogress
07/24/2020Concrete - Cast-In-PlaceMatthew Wavrospecial
07/01/2020Mechanical SystemsMatthew Wavrospecial
07/01/2020FinalMatthew Wavroprogress
06/03/2020Mechanical SystemsMatthew Wavrospecial
06/03/2020FinalMatthew Wavroprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Whole Foods MarketRestaurant / Food ServiceCellar, Floor 1, Roof
Project B00335156 Alteration · LOC Issued · 04/30/2020
Project B00335144 Alteration · LOC Issued · 04/22/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 83 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch - Plumbing8
09/02/2026B00335156-I1Request digital key ↗
09/02/2026B00420010-I1Request digital key ↗
09/01/2026B00361835-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems7
09/02/2026B00245310-I1Request digital key ↗
09/02/2026B00335144-P1Request digital key ↗
09/02/2026B00335144-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment5
09/02/2026B00337868-P4Request digital key ↗
09/02/2026B00337868-I1Request digital key ↗
08/15/2026B00337868-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Structural3
09/02/2026B00335159-I1Request digital key ↗
08/15/2026B00335159-P1Request digital key ↗
08/15/2026B00335159-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00346549-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00357161-I1Request digital key ↗
▸Seals & Professional Certifications39
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/02/2026B00357161-I1Open ↗
09/02/2026B00420010-I1Open ↗
09/02/2026B00421319-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/19/2026B00420010-I1Open ↗
09/19/2026B00420010-I1Open ↗
09/01/2026B00421319-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B00421319-I1Open ↗
08/28/2026B00335144-P2Open ↗
08/24/2026B00335144-P6Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/02/2026B00420010-I1Open ↗
09/02/2026B00421319-I1Open ↗
08/13/2026B00335144-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B00335156-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B00245310-I1Open ↗
08/13/2026B00335144-I1Open ↗