Elevator cooperative
East Midtown Plaza
401 1 AVENUE · Gramercy · BIN 1084710
💬 Discuss this project
1970Year Built
27Stories
D4Building Class
C1-9AZoning
927,591 sfGross Floor Area
522Units
LL97 CoveredRent Stabilized107 Open Violations 85 unresolved · 22 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: EAST MIDTOWN PLAZA · 104,861 sf lot · 8.85 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalEquipmentOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 12 docs
Site & exterior1 filing · 3 docs
Filed — no permit issued3 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EAST MIDTOWN PLAZA HOUSING4509/01/2026
PLATINUM SERVICES NY507/19/2026
PYRAMID RESTORATION NY507/08/2026
EAST MIDTOWN PLAZA503/21/2026
COOPER SQUARE REALTY AAF EAST MI203/21/2026
EMP C/O COOPER SQUARE REALTY103/21/2026
EMP C O COOPER SQUARE REALTY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ORSAR ENGINEERING106/02/2026
DJM CONSULTING ENGINEERING106/01/2026
ASHRAF CORP107/18/2025
RIMKUS NEW YORK PLLC104/01/2025
OSPINO ENGINEERING PLLC103/10/2025
SUPERSTRUCTURES ENG. + ARCH.101/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIMKUS NEW YORK PLLC203/21/2026
LOMBARDO BUILDING CONSULTANTS403/21/2026
HIERARCH-E203/21/2026
SUPERSTRUCTURES ENG + ARCH103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PYRAMID RESTORATION NY LLGeneral Contractor707/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor207/19/2026
BENJAMIN DREBINElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ORSAR ENGINEERING PLLC8338106/02/2026
RIMKUS NEW YORK, PLLC8123104/01/2025
ATLAS ATC ENGINEERING INC8011101/20/2023
Building Lifecycle
All (106)Filed (10)Permit Issued (10)Facade (FISP) (18)Violation (42)Objection (8)Special Inspection (18)
07/17/2026
Permit issued — Sidewalk Shed
M01258205-I1-SH
07/17/2026
Special inspection requirement — Post-installed Anchors
07/17/2026
Special inspection requirement — Duct leakage testing, insulation and design
Liad Itzhaky
07/10/2026
Objection resolved — Addressed
07/07/2026
Objection raised — Scope
07/01/2026
Objection resolved — Addressed
06/29/2026
Objection resolved — Addressed
06/29/2026
Objection resolved — Addressed
06/25/2026
Objection raised — Scope
06/25/2026
Objection raised — Admin
06/25/2026
Objection raised — Inspections
06/02/2026
Filed — Alteration
DESIGN AND INSTALLATION OF A NEW KITCHEN EXHAUST; MAKE UP AIR UNIT AND PRECIPITATOR AS SHOWN ON THE DRAWINGS. PROVIDE TYPE I EXHAUST DUCT DISTRIBUTION, CLEANOUTS AND A LOUVER AS SHOWN ON THE DRAWINGS.
M01406128-I1
06/01/2026
Filed — Alteration
MECHANICAL WORK IN CEL AND 1ST FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01386213-I1
05/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/21/2026
Special inspection requirement — Final
Liad Itzhaky
05/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Liad Itzhaky
05/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Liad Itzhaky
05/21/2026
Special inspection requirement — Mechanical Systems
Liad Itzhaky
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/12/2026
Special inspection requirement — Energy Code Compliance Inspections
05/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/12/2026
Special inspection requirement — Maintenance information
04/13/2026
Special inspection requirement — Final
04/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/13/2026
Special inspection requirement — Mechanical Systems
03/12/2026
Cycle 9 facade report signed — SWARMP
03/09/2026
Cycle 9 facade inspection completed
01/14/2026
Violation issued (ECB, open)
Construction
12/30/2025
Cycle 9 facade report submitted
12/04/2025
Permit issued — Suspended Scaffold
M00804604-S1-SC
08/19/2025
Permit issued — Suspended Scaffold
M00804604-S1-SC
07/21/2025
Permit issued — Sidewalk Shed
M01258205-I1-SH
07/18/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01258205-I1
05/07/2025
Permit issued — General Construction
M00804604-I1-GC
04/01/2025
Filed — Alteration
M01146777-I1
03/14/2025
Permit issued — Suspended Scaffold
M00804604-S1-SC
03/10/2025
Filed — Alteration
Suspended Scaffold installation as per plans filed herewith in conjunction with CD5 SR23-723 under M00965605-I1 filing.
M00804604-S1
02/12/2025
Filed — Alteration
suspended scaffold post approval amendment of CD5 SR23-723
M00965605-P3
02/07/2025
Filed — Alteration
suspended scaffold post approval amendment of CD5 SR23-723
M00965605-P2
07/24/2024
Permit issued — Suspended Scaffold
M00965605-P1-SC
07/17/2024
Filed — Alteration
suspended scaffold post approval amendment of CD5 SR23-723
M00965605-P1
05/06/2024
Permit issued — General Construction
M00804604-I1-GC
05/02/2024
Violation issued (HPD, closed)
C
12/29/2023
Permit issued — Suspended Scaffold
M00965605-I1-SC
12/11/2023
Filed — Alteration
suspended scaffold post approval amendment of CD5 SR23-723
M00965605-I1
07/06/2023
Violation issued (ECB, closed)
Construction
05/11/2023
Permit issued — General Construction
M00804604-I1-GC
02/13/2023
Cycle 9 facade report submitted
02/09/2023
Cycle 9 facade report signed — UNSAFE
02/07/2023
Cycle 9 facade inspection completed
01/20/2023
Filed — Alteration
Suspended Scaffold installation as per plans filed herewith in conjunction with CD5 SR23-723 under M00965605-I1 filing.
M00804604-I1
12/27/2022
Special inspection requirement — Final
David May
12/27/2022
Special inspection requirement — Masonry
GIORGI KHARDZEISHVILI
12/27/2022
Special inspection requirement — Tenant Protection Plan Compliance
GIORGI KHARDZEISHVILI
12/27/2022
Special inspection requirement — Post-installed Anchors
GIORGI KHARDZEISHVILI
09/27/2022
Violation issued (HPD, open)
B
09/27/2022
Violation issued (HPD, open)
C
09/27/2022
Violation issued (HPD, closed)
A
09/27/2022
Violation issued (HPD, closed)
C
09/27/2022
Violation issued (HPD, open)
B
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC07/17/2026
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY12/04/2025
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY08/19/2025
DOB NOWSidewalk ShedPermit IssuedPLATINUM SERVICES NY LLC07/21/2025
DOB NOWGeneral ConstructionPermit IssuedPYRAMID RESTORATION NY LL05/07/2025
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY03/14/2025
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY07/24/2024
DOB NOWGeneral ConstructionPermit IssuedPYRAMID RESTORATION NY LL05/06/2024
DOB NOWSuspended ScaffoldPermit IssuedSTREAMLINE CONSULTANTS NY12/29/2023
DOB NOWGeneral ConstructionPermit IssuedPYRAMID RESTORATION NY LL05/11/2023
BISSPISSUEDENOBRAC PLUMBING, INC12/01/2020
BISOTISSUEDSKYLINE RESTORATION INC02/28/2019
BISOTISSUEDSKYLINE RESTORATION INC02/28/2019
BISSPISSUEDENOBRAC PLUMBING, INC04/20/2018
BISOTISSUEDSKYLINE RESTORATION INC02/26/2018
BISOTISSUEDSKYLINE RESTORATION INC02/26/2018
BISPLISSUEDENOBRAC PLUMBING, INC02/14/2018
BISOTISSUEDSKYLINE RESTORATION INC01/24/2018
BISOTISSUEDSKYLINE RESTORATION INC01/24/2018
BISOTISSUEDSKYLINE RESTORATION INC03/07/2017
BISOTISSUEDSKYLINE RESTORATION INC03/03/2017
BISOTISSUEDSKYLINE RESTORATION INC03/03/2017
BISSPISSUEDENOBRAC PLUMBING, INC02/13/2017
BISPLISSUEDENOBRAC PLUMBING, INC02/13/2017
BISPLISSUEDENOBRAC PLUMBING, INC02/13/2017
BISOTISSUEDSKYLINE RESTORATION INC01/31/2017
BISOTISSUEDSKYLINE RESTORATION INC12/29/2016
BISOTISSUEDSKYLINE RESTORATION INC03/01/2016
BISSPISSUEDENOBRAC PLUMBING, INC02/04/2016
BISPLISSUEDENOBRAC PLUMBING, INC02/04/2016
BISEQISSUEDSPRING SCAFFOLDING LLC01/25/2016
BISOTISSUEDSKYLINE RESTORATION INC01/18/2016
BISPLISSUEDENOBRAC PLUMBING, INC12/07/2015
BISOTISSUEDSKYLINE RESTORATION INC08/12/2015
BISOTISSUEDSKYLINE RESTORATION INC06/26/2014
BISOTISSUEDSKYLINE RESTORATION INC02/11/2014
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/13/2014
BIS—ISSUEDINTERBORO SIGN &ELECL MAI02/28/2012
BISPLISSUEDMB MECHANICAL CORP01/25/2012
BISOTISSUEDBROWN & WHITE WINE & LIQU12/09/2011
+ 20 more permits on file
2 projects · most recent 06/02/2026
Ventilation Systems Others
FiledStatusContractorScopeMake / Model / Capacity
06/02/2026——Ventilation Systems
Ventilation
Econ-Air EASIF-24-DD 4,827 CFM · Kitchen Exhaust ×1
ETA2-20D 4,000 CFM · Makeup Air ×1
Air Quality Engineering SMOKEMASTER F72B 4,827 CFM ×1
06/01/2026——Others
Other
Recold JW-35C 60 tons ×1
6 projects · most recent 07/21/2025
General Wiring
FiledStatusContractorScope
07/21/2025Permit IssuedRICHARD NEU—
07/24/2024CompleteKTB ELECTRIC INC.General Wiring
05/17/2023CompleteE-J ELEC. INSTALLATION COGeneral Wiring
05/20/2019CompleteS.A.L. ELECTRIC CO INC.—
04/03/2019Permit IssuedMECHANICAL CONST SYS CORPGeneral Wiring
06/22/2018CompleteDELTA POWER ELECTRICALGeneral Wiring
1 project · most recent 07/18/2025
Sidewalk Shed
FiledStatusContractorScope
07/18/2025Permit IssuedPLATINUM SERVICES NY LLCSidewalk Shed
2 projects · most recent 03/10/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
03/10/2025Permit IssuedSTREAMLINE CONSULTANTS NYSuspended Scaffold (SC)
02/12/2025Permit Issued—Suspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
07/17/2026Post-installed Anchors—special
07/17/2026Duct leakage testing, insulation and designLiad Itzhakyenergy_progress
05/21/2026Tenant Protection Plan Compliance—special
05/21/2026FinalLiad Itzhakyprogress
05/21/2026Energy Code Compliance InspectionsLiad Itzhakyprogress
05/21/2026Fire-Resistant Penetrations and JointsLiad Itzhakyspecial
05/21/2026Mechanical SystemsLiad Itzhakyspecial
05/12/2026Fire-Resistant Penetrations and Joints—special
05/12/2026Energy Code Compliance Inspections—progress
05/12/2026HVAC-R and service water heating system controls—energy_progress
05/12/2026Maintenance information—energy_progress
04/13/2026Final—progress
04/13/2026Tenant Protection Plan Compliance—special
04/13/2026Mechanical Systems—special
12/27/2022FinalDavid Mayprogress
12/27/2022MasonryGIORGI KHARDZEISHVILIspecial
12/27/2022Tenant Protection Plan ComplianceGIORGI KHARDZEISHVILIspecial
12/27/2022Post-installed AnchorsGIORGI KHARDZEISHVILIspecial
▾Documents — 215 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/24/2026M00965605-P3Request digital key ↗
08/24/2026M00965605-P2Request digital key ↗
08/24/2026M00965605-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits35
▸BISPLAN / WORK APPROVAL APPLICATION20
10/22/2020122369338Open ↗
10/13/2020122369338Open ↗
10/05/2020122369338Open ↗
Showing 3 of 20 on file for this type
▸BISWORK PERMIT APPLICATION15
12/03/2020122369338Open ↗
03/20/2017122367526Open ↗
01/03/2017122369374Open ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications54
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION26
06/21/2017121706234Open ↗
01/26/2017140450893Open ↗
01/03/2017122369374Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026M00804604-S1Open ↗
08/24/2026M00804604-I1Open ↗
08/24/2026M01146777-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/15/2015122369338Open ↗
01/16/2014121847314Open ↗
02/22/2012120979218Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/28/2026M01406128-I1Open ↗
08/28/2026M01406128-I1Open ↗
08/25/2026M00804604-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026M01406128-I1Open ↗
08/28/2026M01406128-I1Open ↗
08/28/2026M01406128-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
01/20/2016140450893Open ↗
06/15/2015122369338Open ↗
01/16/2014121847314Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
02/22/2012120979218Open ↗
12/09/2011120887148Open ↗
11/29/2010120538258Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/20/2016140450893Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/20/2016140450893Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING3
10/13/2020122369338Open ↗
01/19/2012120887148Open ↗
12/09/2011120887148Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/15/2015122369338Open ↗
05/26/2015122367526Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
12/09/2011120887148Open ↗
▸Environmental & Asbestos16
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
02/22/2012120979218Open ↗
12/09/2011120887148Open ↗
09/02/2011120749191Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026M00804604-I1Open ↗
08/24/2026M01146777-I1Open ↗
08/15/2026M01386213-I1Open ↗
Showing 3 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
12/02/2020122367526Open ↗
01/03/2017122369374Open ↗
02/13/2014121706234Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
01/16/2014121847314Open ↗
11/29/2010120538258Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/15/2015122369338Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/28/2015122367526Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
06/21/2017121706234Open ↗
08/19/2015122367526Open ↗
06/15/2015122369338Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
12/02/2020122367526Open ↗
12/02/2020122367526Open ↗
12/02/2020122367526Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
12/02/2020122367526Open ↗
11/17/2020122369338Open ↗
06/21/2017121706234Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
01/20/2016140450893Open ↗
▸BISTECHNICAL REPORT: ENERGY1
09/02/2011120749191Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY6
12/02/2020122367526Open ↗
12/02/2020122367526Open ↗
12/02/2020122367526Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
12/08/2020122367526Open ↗
08/28/2015122367526Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
08/28/2015122367526Open ↗
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
08/19/2015122367526Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
08/19/2015122367526Open ↗
▸Approvals, Objections & Sign-offs19
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
12/08/2020122367526Open ↗
12/03/2020122367526Open ↗
12/03/2020122369338Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
08/02/2013121706234Open ↗
02/22/2012120979218Open ↗
12/02/2011120887148Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/12/2016122369338Open ↗
02/10/2016122369338Open ↗
05/24/2013120538258Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/24/2026M01146777-I1Open ↗
08/13/2026M01258205-I1Open ↗
▸BISSHED LETTER1
11/18/2011120538258Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT15
12/03/2020122369338Open ↗
12/03/2020122369338Open ↗
12/02/2020122367526Open ↗
Showing 3 of 15 on file for this type
▸Filing & Intake Forms18
▸BISEFILING COVER SHEET10
06/15/2015122369338Open ↗
06/02/2015122369374Open ↗
05/26/2015122367526Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION5
10/23/2020122369338Open ↗
07/02/2018122367526Open ↗
08/08/2016140450893Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
12/03/2020122369338Open ↗
05/04/2018122367526Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/20/2016140450893Open ↗
▸Other Documents13
▸DOB NOWManufacturer's Specifications5
08/24/2026M00965605-P2Open ↗
08/24/2026M00965605-P1Open ↗
08/24/2026M00965605-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWCalculations5
08/24/2026M00965605-I1Open ↗
08/24/2026M00965605-P2Open ↗
08/24/2026M00965605-P1Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/03/2020122369338Open ↗
08/28/2015122367526Open ↗
▸BISUnknown1
04/20/2018122369338Open ↗