← Back
BuildNYC
Church, synagogue, chapel
Memorial Baptist Church
401 16TH STREET · Name © OpenStreetMap contributors · BIN 3026652
💬 Discuss this project
1921Year Built
1Stories
M1Building Class
R6BZoning
13,650 sfGross Floor Area
1Units
4 Active Violations 0 unresolved · 4 paperwork only 1 old, status unconfirmed ▸FDNY Report ↗
Church, synagogue, chapel · 9,121 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMemorial Baptist Church1p · 1 filing · 16 docs
Floor 1Memorial Baptist Church4p · 1 filing · 1 doc
CellarMemorial Baptist Church4p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Memorial Baptist Church807/08/2026
NYC Department of Housing Preservation and Development607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kems Engineering and Construction401/05/2026
Enthink Engineers106/02/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Lewsan Consultants803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mark Contracting NYScaffold607/08/2026
Petri PBG & HeatingPlumbing207/08/2026
Petri Plumbing & Heatingspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC Special Inspections8355401/05/2026
Building Lifecycle
All (42)Filed (5)Permit Issued (7)Signed Off (3)Violation (12)Inspection (5)Special Inspection (10)
03/16/2026
Signed off — Alteration
INSTALL TWO (2) NEW DIRECT-VENT GAS-FIRED OT WATER BOILERS IN CELLAR.
B01291843-S2
03/16/2026
Signed off — Alteration
INSTALL TWO (2) NEW DIRECT-VENT GAS-FIRED OT WATER BOILERS IN CELLAR.
B01291843-S1
03/16/2026
Signed off — Alteration
INSTALL TWO (2) NEW DIRECT-VENT GAS-FIRED OT WATER BOILERS IN CELLAR.
B01291843-I1
01/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/07/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/07/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
01/05/2026
Filed — Alteration
INSTALL TWO (2) NEW DIRECT-VENT GAS-FIRED OT WATER BOILERS IN CELLAR.
B01291843-P1
12/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
12/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/25/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/06/2025
Permit issued — General Construction
B01291843-S2-GC
10/06/2025
Permit issued — Boiler Equipment
B01291843-I1-BE
10/06/2025
Permit issued — Plumbing
B01291843-S1-PL
09/29/2025
Filed — Alteration
INSTALL TWO (2) NEW DIRECT-VENT GAS-FIRED OT WATER BOILERS IN CELLAR.
B01291843-S2
09/29/2025
Filed — Alteration
INSTALL TWO (2) NEW DIRECT-VENT GAS-FIRED OT WATER BOILERS IN CELLAR.
B01291843-S1
09/29/2025
Filed — Alteration
INSTALL TWO (2) NEW DIRECT-VENT GAS-FIRED OT WATER BOILERS IN CELLAR.
B01291843-I1
09/26/2025
Special inspection requirement — Heating Systems
ABDALLAH ELCHERBINI
09/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
09/26/2025
Special inspection requirement — Maintenance information
Steven Bendoraitis
09/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
09/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
09/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
09/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
09/23/2025
Special inspection requirement — Final
Steven Bendoraitis
04/15/2024
Permit issued — Sidewalk Shed
B00530236-I1-SH
02/08/2024
Permit issued — Sidewalk Shed
B00530236-I1-SH
02/10/2023
Permit issued — Sidewalk Shed
B00530236-I1-SH
12/20/2022
Violation issued (ECB, closed)
Construction
08/17/2021
Permit issued — Sidewalk Shed
B00530236-I1-SH
07/21/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/12/2021
Violation issued (ECB, open)
Construction
06/02/2021
Filed — Alteration
B00530236-I1
04/30/2021
Violation issued (ECB, open)
Construction
04/30/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/26/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/20/2009
Violation issued (ECB, closed)
Construction
11/15/2009
Violation issued (ECB, closed)
Unknown
05/30/2008
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
08/01/2007
Violation issued (ECB, open)
Unknown
10/27/2006
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
03/06/2005
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPetri Plumbing & Heating10/06/2025
DOB NOWBoiler EquipmentSigned-offPetri PBG & Heating10/06/2025
DOB NOWPlumbingSigned-offPetri PBG & Heating10/06/2025
DOB NOWSidewalk ShedPermit IssuedMark Contracting NY04/15/2024
DOB NOWSidewalk ShedPermit IssuedMark Contracting NY02/08/2024
DOB NOWSidewalk ShedPermit IssuedMark Contracting NY02/10/2023
DOB NOWSidewalk ShedPermit IssuedMark Contracting NY08/17/2021
2 projects · most recent 06/10/2021
General Wiring
FiledStatusContractorScope
06/10/2021Permit IssuedRichard Neu—
07/22/2019CompleteWilldan Electrical of NYGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/07/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/07/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/25/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
01/06/2026Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
12/11/2025Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
09/26/2025Heating SystemsABDALLAH ELCHERBINIspecial
09/26/2025Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
09/26/2025Maintenance informationSteven Bendoraitisenergy_progress
09/26/2025Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
09/25/2025HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
09/25/2025HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
09/25/2025HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
09/23/2025FinalSteven Bendoraitisprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Memorial Baptist ChurchReligiousCellar, Floor 1
Project B01291843 Alteration · LOC Issued · 09/29/2025
Project B00530236 Alteration · Permit Entire · 06/02/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00530236-I1Request digital key ↗
08/20/2026B01291843-P1Request digital key ↗
08/20/2026B01291843-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00530236-I1Open ↗
08/20/2026B01291843-S1Open ↗
08/13/2026B01291843-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026B01291843-I1Open ↗
09/23/2026B01291843-I1Open ↗
09/23/2026B01291843-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B01291843-I1Open ↗
09/01/2026B01291843-P1Open ↗
08/30/2026B01291843-S2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/20/2026B01291843-S1Open ↗
08/13/2026B01291843-P1Open ↗
08/13/2026B01291843-S2Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/20/2026B01291843-S1Open ↗
08/13/2026B01291843-P1Open ↗
08/13/2026B01291843-I1Open ↗
Showing 3 of 4 on file for this type