← Back
BuildNYC
Parks / recreation facility
401 WEST 79TH STREET
MANHATTAN · BIN 1089425
💬 Discuss this project
1910Year Built
1Stories
Q1Building Class
PARKZoning
3,936 sfGross Floor Area
0Units
Parks / recreation facility · Owner of record: NYC Department of Parks and Recreation · 2,262,500 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 2Sprinkler head installation and replacementUnder Construction17p · 1 filing · 10 docs
Floor 1Sprinkler head installation and replacementUnder Construction133p · 6 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed installation1p · 1 filing · 3 docs
Filed — no permit issued15p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Parks and Recreation4208/26/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AECOM710/04/2024
HDR Architecture and Engineering408/06/2024
HDR307/25/2024
Brand Access Solutions110/13/2022
STV111/16/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV Associates3003/21/2026
A1 Expediting Service203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Safway AtlanticScaffold407/08/2026
Judlau ContractingGeneral Contractor307/08/2026
Dola Electrical CoElectrical203/21/2026
Olympic Plumbing & Heating ServicePlumbing207/08/2026
Sirina Fire ProtectionFire Protection208/26/2026
Tuxedo Electrical ContractingElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC Logistics Dba JPCL EN351605/01/2023
Building Lifecycle
All (67)Filed (16)Permit Issued (11)Inspection (2)Objection (8)Special Inspection (30)
08/25/2026
Permit issued — Sprinklers
M08053514-I1-EW-SP
02/06/2026
Permit issued — General Construction
M00568897-I1-GC
02/06/2026
Permit issued — Structural
M00493431-I1-ST
01/08/2026
Permit issued — Plumbing
M00812853-I1-PL
11/25/2025
Permit issued — General Construction
M00568897-I1-GC
11/19/2025
Special inspection requirement — Mechanical Systems
11/19/2025
Special inspection requirement — Ventilation and air distribution system
11/19/2025
Special inspection requirement — Final
11/19/2025
Special inspection requirement — Duct leakage testing, insulation and design
11/04/2025
Objection resolved — Addressed
09/30/2025
Permit issued — Sidewalk Shed
M00791634-I1-SH
09/02/2025
Permit issued — Sprinklers
M08053514-I1-EW-SP
07/28/2025
Objection raised — Scope
04/08/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/09/2025
Permit issued — Plumbing
M00812853-I1-PL
10/15/2024
Special inspection requirement — Sprinkler Systems
Asma Hashmi
10/04/2024
Filed — Alteration
PROPOSED INSTALLATION OF SOME PLUMBING FIXTURES.
M00812853-P2
10/01/2024
Special inspection requirement — Sprinkler Systems
09/26/2024
Permit issued — Sidewalk Shed
M00791634-I1-SH
08/15/2024
Special inspection requirement — Sprinkler Systems
Asma Hashmi
08/06/2024
Filed — Alteration
PROPOSED INSTALLATION AND REPLACEMENT OF SOME SPRINKLER HEADS.
M08053514-P1
08/06/2024
Filed — Alteration
PROPOSED INSTALLATION OF SOME PLUMBING FIXTURES.
M00812853-P1
08/06/2024
Filed — Alteration
Replace the entire HVAC systems with new ones including DX split systems, exhaust fans, air outlets, VAV boxes, electric unit heaters, fire-smoke dampers, exhaust fans and associated controls.
M00673086-P1
08/06/2024
Filed — Alteration CO
M00484859-P1
08/06/2024
Filed — Alteration
PROPOSED REPAIR AND RESTORATION OF STRUCTURES AND IMPROVE ACCESSIBILITY IN THE PARK. ALL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00484107-P1
08/06/2024
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Asma Hashmi
08/06/2024
Special inspection requirement — Fire-Resistance Rated Construction
Asma Hashmi
08/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Asma Hashmi
08/06/2024
Special inspection requirement — Lighting controls
Asma Hashmi
08/06/2024
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
08/06/2024
Special inspection requirement — Concrete - Cast-In-Place
Asma Hashmi
08/06/2024
Special inspection requirement — Sprayed fire-resistant materials
Asma Hashmi
08/06/2024
Special inspection requirement — Luminous Exit Path Markings
Asma Hashmi
08/06/2024
Special inspection requirement — Vestibules
Asma Hashmi
08/06/2024
Special inspection requirement — Masonry
Asma Hashmi
08/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
08/06/2024
Special inspection requirement — Interior lighting power
Asma Hashmi
07/26/2024
Special inspection requirement — Concrete - Cast-In-Place
07/26/2024
Special inspection requirement — Preliminary
Asma Hashmi
07/26/2024
Special inspection requirement — Structural Steel - Welding
Asma Hashmi
07/26/2024
Special inspection requirement — Final
Asma Hashmi
07/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Asma Hashmi
07/26/2024
Special inspection requirement — Structural Steel - Details
Asma Hashmi
07/26/2024
Special inspection requirement — Subgrade Inspections
Asma Hashmi
07/26/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Asma Hashmi
07/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
07/26/2024
Special inspection requirement — Concrete - Cast-In-Place
Asma Hashmi
07/26/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Asma Hashmi
07/25/2024
Filed — Alteration
PROPOSED STRUCTURAL WORK. ALL AS PER PLANS FILED HEREWITH
M00493431-P3
07/02/2024
Filed — Alteration
PROPOSED STRUCTURAL WORK. ALL AS PER PLANS FILED HEREWITH
M00493431-P2
09/28/2023
Permit issued — Sidewalk Shed
M00791634-I1-SH
05/01/2023
Filed — Alteration
PROPOSED INSTALLATION OF SOME PLUMBING FIXTURES.
M00812853-I1
04/04/2023
Filed — Alteration
Replace the entire HVAC systems with new ones including DX split systems, exhaust fans, air outlets, VAV boxes, electric unit heaters, fire-smoke dampers, exhaust fans and associated controls.
M00673086-I1
03/24/2023
Filed — Alteration
PROPOSED INSTALLATION AND REPLACEMENT OF SOME SPRINKLER HEADS.
M08053514-I1
10/14/2022
Permit issued — Sidewalk Shed
M00791634-I1-SH
10/13/2022
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00791634-I1
11/16/2021
Filed — Alteration
M00568897-I1
08/17/2021
Objection raised — Other
08/17/2021
Objection resolved — Addressed
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedSirina Fire Protection08/25/2026
DOB NOWGeneral ConstructionPermit IssuedJudlau Contracting02/06/2026
DOB NOWStructuralPermit IssuedJudlau Contracting02/06/2026
DOB NOWPlumbingPermit IssuedOlympic Plumbing & Heating Service01/08/2026
DOB NOWGeneral ConstructionPermit IssuedJudlau Contracting11/25/2025
DOB NOWSidewalk ShedPermit IssuedSafway Atlantic09/30/2025
DOB NOWSprinklersPermit IssuedSirina Fire Protection09/02/2025
DOB NOWPlumbingPermit IssuedOlympic Plumbing & Heating Service01/09/2025
DOB NOWSidewalk ShedPermit IssuedSafway Atlantic09/26/2024
DOB NOWSidewalk ShedPermit IssuedSafway Atlantic09/28/2023
DOB NOWSidewalk ShedPermit IssuedSafway Atlantic10/14/2022
1 project · most recent 08/06/2024
FiledStatusContractorScope
08/06/2024Permit IssuedSirina Fire Protection466 heads
1 project · most recent 10/04/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/04/2024Permit IssuedOlympic Plumbing & Heating ServiceGas, Storm, Water/Sanitary
2 projects · most recent 10/12/2022
FiledStatusContractorScope
10/12/2022Permit IssuedCorporate Electric Group—
04/18/2022Permit IssuedDagnachew & Associates1 meters, 1 new_meters
1 project · most recent 07/25/2024
Steel Concrete Masonry
FiledStatusContractorScope
07/25/2024Permit IssuedJudlau ContractingSteel, Concrete, Masonry
1 project · most recent 10/13/2022
Sidewalk Shed
FiledStatusContractorScope
10/13/2022Permit IssuedSafway AtlanticSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/08/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/08/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
11/19/2025Mechanical Systems—special
11/19/2025Duct leakage testing, insulation and design—energy_progress
11/19/2025Ventilation and air distribution system—energy_progress
11/19/2025Final—progress
10/15/2024Sprinkler SystemsAsma Hashmispecial
10/01/2024Sprinkler Systems—special
08/15/2024Sprinkler SystemsAsma Hashmispecial
08/06/2024Wall Panels, Curtain Walls, and VeneersAsma Hashmispecial
08/06/2024Fire-Resistance Rated ConstructionAsma Hashmiprogress
08/06/2024Energy Code Compliance InspectionsAsma Hashmiprogress
08/06/2024Lighting controlsAsma Hashmienergy_progress
08/06/2024Interior lighting powerAsma Hashmienergy_progress
08/06/2024VestibulesAsma Hashmienergy_progress
08/06/2024Fire-Resistant Penetrations and JointsAsma Hashmispecial
08/06/2024MasonryAsma Hashmispecial
08/06/2024Luminous Exit Path MarkingsAsma Hashmispecial
08/06/2024Structural Stability – Alterations of existing buildingsAsma Hashmispecial
08/06/2024Concrete - Cast-In-PlaceAsma Hashmispecial
08/06/2024Sprayed fire-resistant materialsAsma Hashmispecial
07/26/2024Sprayed fire-resistant materials—special
07/26/2024Structural Stability – Alterations of existing buildings—special
07/26/2024Wall Panels, Curtain Walls, and Veneers—special
07/26/2024Energy Code Compliance Inspections—progress
07/26/2024Fire-Resistance Rated Construction—progress
07/26/2024Lighting controls—energy_progress
Latest 25 of 74.
▾Documents — 132 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
09/03/2026M00484107-I1Request digital key ↗
09/03/2026M00484107-P1Request digital key ↗
09/03/2026M00568897-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits14
▸DOB NOWLPC Approval/Permit9
09/03/2026M00484107-I1Open ↗
08/13/2026M00484859-P1Open ↗
08/13/2026M00673086-P1Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
04/27/2021140990024Open ↗
03/15/2021140990024Open ↗
05/21/2014121993708Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/15/2024140990024Open ↗
▸Seals & Professional Certifications33
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/03/2026M00484107-I1Open ↗
09/03/2026M00568897-I1Open ↗
09/01/2026M00791634-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
08/31/2026M00812853-I1Open ↗
08/25/2026M00493431-I1Open ↗
08/25/2026M00493431-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026M00493431-I1Open ↗
08/25/2026M00493431-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
—140990024Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
—140990024Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/21/2014121993708Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/26/2026M00484859-P1Open ↗
08/26/2026M00484859-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026M00484859-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026M00484859-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
09/03/2026M00568897-I1Open ↗
08/26/2026M00484859-I1Open ↗
08/26/2026M08053514-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/15/2024140990024Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/09/2026140990024Open ↗
06/25/2021140990024Open ↗
▸BISINTERIOR LIGHTING POWER1
02/09/2026140990024Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/09/2026140990024Open ↗
▸BISLIGHTING CONTROLS1
02/09/2026140990024Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/09/2026140990024Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/21/2014121993708Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
—140990024Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/09/2026140990024Open ↗
07/28/2021140990024Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
02/09/2026140990024Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
02/09/2026140990024Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/09/2026140990024Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/09/2026140990024Open ↗
▸BISMASONRY1
02/09/2026140990024Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
02/09/2026140990024Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
02/09/2026140990024Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
02/09/2026140990024Open ↗
▸Approvals, Objections & Sign-offs33
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
09/03/2026M00484107-I1Open ↗
09/03/2026M00568897-I1Open ↗
08/26/2026M00484859-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)15
09/03/2026M00484107-I1Open ↗
08/13/2026M00673086-P1Open ↗
08/13/2026M00484859-P1Open ↗
Showing 3 of 15 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
07/28/2021140990024Open ↗
▸BISFINAL1
02/09/2026140990024Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
05/21/2014121993708Open ↗
—140990024Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
—140990024Open ↗
▸Other Documents4
▸BISSupporting Document: Fee Exempt2
07/28/2021140990024Open ↗
07/28/2021140990024Open ↗
▸BISLUMINOUS EGRESS PATH MARKINGS1
02/09/2026140990024Open ↗
▸BISPRELIMINARY1
02/09/2026140990024Open ↗