401 WEST END AVENUE · BIN 1033719
💬 Discuss this project
1901Year Built
9Stories
D4Building Class
R10AZoning
65,522 sfGross Floor Area
66Units
LL97 CoveredRent Stabilized7 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: NEW CENTURY OWNERS CORP · 8,002 sf lot · 8.19 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 2 filings · 14 docs
Floor 54p · 1 filing · 7 docs
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AJ CLARKE REAL ESTATE3904/09/2026
PLATINUM SERVICES NY404/09/2026
MSN CONSTRUCTION INC503/22/2026
NEW CENTURY OWNERS2303/22/2026
NEW CENTORY OWNERS CORP203/22/2026
ARTISAN, INC103/22/2026
RHINELANDER PROPERTIES703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIGID STRUCTURAL DESIGN, LLC201/05/2026
SPAR UNLIMITED LLC210/29/2025
AJT ARCHITECTURE, PLLC206/26/2025
NEW YORK ENGINEERING ASSOC., P.C.110/13/2023
ASHRAF CORP107/24/2023
LUKE LICALZI, P.E., P.C.108/17/2021
GREEN DESIGN108/02/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC403/21/2026
NEW YORK ENGINEERING ASSOCIATES P203/21/2026
JON LIBASCI RA203/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SIPA CONTRACTING INCGeneral Contractor303/21/2026
TITAN CONSTRUCTION SERVICGeneral Contractor303/21/2026
MSN CONSTRUCTION INCGeneral Contractor203/21/2026
CEPRINE CONSTRUCTION INCGeneral Contractor204/09/2026
CERINA GENERAL CONTR INCGeneral Contractor104/09/2026
PLATINUM SERVICES NY LLCGeneral Contractor104/09/2026
ROCK STAR RENOVATION LLCGeneral Contractor104/09/2026
JOHNSON RAYMONDElectrical103/21/2026
VMC PLUMBING & HEATING INPlumbing107/08/2026
ROBERT JUNENGERTElectrical103/21/2026
SCHONDORF MICHAELElectrical103/21/2026
TAKOS AND K ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPAR UNLIMITED LLC5967210/29/2025
NEW YORK ENGINEERING ASSO851110/13/2023
Building Lifecycle
All (121)Filed (12)Permit Issued (12)Signed Off (5)Facade (FISP) (12)Violation (60)Inspection (5)Special Inspection (15)
01/21/2026
Permit issued — General Construction
M01248452-I1-GC
01/05/2026
Filed — Alteration
M01334833-I1
01/05/2026
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01334837-I1
01/05/2026
Permit issued — Supported Scaffold
M01334833-I1-SF
01/05/2026
Permit issued — Sidewalk Shed
M01334837-I1-SH
11/17/2025
Signed off — Alteration
Interior renovation at Apartment 7EF. To include removal of non load bearing partition, construction of new non load bearing partitions, renovation to existing three piece restroom fixtures and finishes, replacement of wood floors and finishes throughout.
M01243630-I1
11/13/2025
Signed off — Alteration
Interior renovation at Apartment 7EF. To include removal of non load bearing partition, construction of new non load bearing partitions, renovation to existing three piece restroom fixtures and finishes, replacement of wood floors and finishes throughout.
M01243630-S1
10/29/2025
Filed — Alteration
M01248452-I1
10/22/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00904020-I1
10/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/08/2025
Special inspection requirement — Tenant Protection Plan Compliance
SCOTT PROFETA
08/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/02/2025
Permit issued — General Construction
M01243630-I1-GC
07/01/2025
Permit issued — Plumbing
M01243630-S1-PL
06/27/2025
Special inspection requirement — Final
SCOTT PROFETA
06/27/2025
Special inspection requirement — Masonry
SCOTT PROFETA
06/27/2025
Special inspection requirement — Post-installed Anchors
SCOTT PROFETA
06/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SCOTT PROFETA
06/26/2025
Filed — Alteration
Interior renovation at Apartment 7EF. To include removal of non load bearing partition, construction of new non load bearing partitions, renovation to existing three piece restroom fixtures and finishes, replacement of wood floors and finishes throughout.
M01243630-I1
06/26/2025
Filed — Alteration
Interior renovation at Apartment 7EF. To include removal of non load bearing partition, construction of new non load bearing partitions, renovation to existing three piece restroom fixtures and finishes, replacement of wood floors and finishes throughout.
M01243630-S1
06/18/2025
Special inspection requirement — Final
Anthony Tavella
06/04/2025
Violation issued (HPD, closed)
A
12/11/2024
Signed off — Alteration
M00890486-I1
05/13/2024
Signed off — Alteration
REPLACE BOILER AND RE-INSTALL EXISTING GAS/OIL BURNER.
M00937825-I1
05/06/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/16/2024
Permit issued — Suspended Scaffold
M00976690-P1-SC
02/09/2024
Filed — Alteration
Facade repairs and inspections.
M00976690-P1
01/11/2024
Permit issued — Suspended Scaffold
M00976690-I1-SC
12/13/2023
Filed — Alteration
Facade repairs and inspections.
M00976690-I1
10/26/2023
Permit issued — Boiler Equipment
M00937825-I1-BE
10/13/2023
Filed — Alteration
REPLACE BOILER AND RE-INSTALL EXISTING GAS/OIL BURNER.
M00937825-I1
09/22/2023
Special inspection requirement — Maintenance information
LOUIS ARENA
09/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
09/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
09/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
09/22/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
09/22/2023
Special inspection requirement — Heating Systems
LOUIS ARENA
07/25/2023
Permit issued — Sidewalk Shed
M00904020-I1-SH
07/24/2023
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00904020-I1
07/20/2023
Permit issued — General Construction
M00890486-I1-GC
06/28/2023
Filed — Alteration
M00890486-I1
02/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/03/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/03/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/06/2022
Cycle 9 facade report signed — SWARMP
06/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/01/2022
Cycle 9 facade inspection completed
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/15/2022
Permit issued — General Construction
M00524459-I1-GC
02/03/2022
Cycle 9 facade report submitted
08/17/2021
Filed — Alteration
M00524459-I1
05/18/2021
Special inspection requirement — Lighting in dwelling units
Mark LiCalzi
05/18/2021
Special inspection requirement — Lighting controls
Mark LiCalzi
05/18/2021
Special inspection requirement — Interior lighting power
Mark LiCalzi
02/07/2020
Violation issued (ECB, closed)
Boilers
06/18/2019
Violation issued (ECB, closed)
Boilers
06/07/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/07/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCERINA GENERAL CONTR INC01/21/2026
DOB NOWSupported ScaffoldPermit IssuedCEPRINE CONSTRUCTION INC01/05/2026
DOB NOWSidewalk ShedPermit IssuedCEPRINE CONSTRUCTION INC01/05/2026
DOB NOWGeneral ConstructionSigned-offROCK STAR RENOVATION LLC07/02/2025
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC07/01/2025
DOB NOWSuspended ScaffoldPermit IssuedTITAN CONST SERVICES LLC02/16/2024
DOB NOWSuspended ScaffoldPermit IssuedTITAN CONST SERVICES LLC01/11/2024
DOB NOWBoiler EquipmentSigned-offAPPROVED OIL CO OF BKLYN10/26/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC07/25/2023
DOB NOWGeneral ConstructionSigned-offTITAN CONSTRUCTION SERVIC07/20/2023
DOB NOWGeneral ConstructionPermit IssuedSIPA CONTRACTING INC02/15/2022
DOB NOWSupported ScaffoldPermit IssuedMSN CONSTRUCTION INC08/02/2018
BISPLISSUEDGREGG NY PLUMBING, INC03/04/2026
BISPLISSUEDABR PLBG&HTG CONTR INC01/22/2025
BISPLISSUEDCALRAY GAS HEAT CORP02/19/2021
BISOTISSUEDARISTON CHIMNEY LLC08/13/2020
BISOTISSUEDROCK STAR RENOVATION LLC08/12/2020
BISOTISSUEDROCK STAR RENOVATION LLC03/19/2020
BISOTISSUEDCHIMNEY DOCTORS OF AMERIC09/26/2018
BISPLISSUEDIMPACT PLUMBING INC01/23/2018
BISPLISSUEDORBIT PLBG & HTG INC09/12/2017
BISOTRE-ISSUEDJ. COSTA CONSTRUCTION COR08/24/2017
BISOTISSUEDUNITED ELITE GROUP INC08/15/2017
BISPLISSUEDORBIT PLBG & HTG INC12/09/2015
BISOTISSUEDREMODELLA INTERIORS CORP12/03/2015
BISEQISSUEDINTERSYSTEM S&S CORP04/20/2015
BISOTISSUEDL & Z RESTORATION CORP12/23/2014
BISPLISSUEDCALRAY GAS HEAT CORP11/07/2014
BISOTISSUEDL & Z RESTORATION CORP10/20/2014
BISPLISSUEDCALRAY GAS HEAT CORP09/09/2013
BISOTISSUEDCALRAY GAS HEAT CORP09/09/2013
BISPLISSUEDHOWARD REYNOLDS P&H INC09/12/2012
BISOTRE-ISSUEDFALCONE LANDSCAPING & LA*08/31/2012
BISPLISSUEDPOLGANO PLUMBING INC07/27/2012
BISOTISSUEDMASTERDISK CORPORATION06/19/2012
BISOTISSUEDGLENN G CARPENTRY INC02/18/2011
BISPLISSUEDBELL FUEL OIL, LLC09/23/2010
BISOTISSUEDFOCUS & STRUGA BUILDING D09/23/2010
BISPLISSUEDDC BUILDING SERVICES INC04/30/2008
BISMHISSUEDV & I CONSTRUCTION INC04/28/2008
+ 19 more permits on file
10 jobs · most recent 08/11/2026
General Wiring Boiler Controls
FiledStatusContractorScope
08/11/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
08/05/2026Permit IssuedJP & SON ELECTRIC CORPGeneral Wiring
07/01/2025CompleteL.J.F. & SONS ELECL CONTS—
02/25/2025Permit IssuedBP ELECTRIC & COOLING INCGeneral Wiring
10/04/2023CompleteLAURA ELEC'L LIGHTING &Boiler Controls
10/04/2023CompleteLAURA ELEC'L LIGHTING &—
07/25/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
03/04/2022Permit IssuedTAKOS AND K ELECTRIC INCGeneral Wiring
05/11/2018CompleteTAKOS AND K ELECTRIC INC—
02/06/2018CompleteSURE ELEC'L CONTR'G CORP.General Wiring
1 job · most recent 01/05/2026
Sidewalk Shed
FiledStatusContractorScope
01/05/2026Permit IssuedCEPRINE CONSTRUCTION INCSidewalk Shed
1 job · most recent 02/09/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
02/09/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/06/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
10/08/2025Tenant Protection Plan ComplianceSCOTT PROFETAspecial
06/27/2025FinalSCOTT PROFETAprogress
06/27/2025MasonrySCOTT PROFETAspecial
06/27/2025Post-installed AnchorsSCOTT PROFETAspecial
06/27/2025Structural Stability – Alterations of existing buildingsSCOTT PROFETAspecial
06/18/2025FinalAnthony Tavellaprogress
09/22/2023Maintenance informationLOUIS ARENAenergy_progress
09/22/2023HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
09/22/2023HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
09/22/2023HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
09/22/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
09/22/2023Heating SystemsLOUIS ARENAspecial
05/18/2021Lighting in dwelling unitsMark LiCalzienergy_progress
05/18/2021Lighting controlsMark LiCalzienergy_progress
05/18/2021Interior lighting powerMark LiCalzienergy_progress
▾Documents — 319 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
09/06/2026M00067176-I1Request digital key ↗
09/03/2026M00524459-I1Request digital key ↗
08/30/2026M00890486-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits66
▸BISWORK PERMIT APPLICATION31
03/04/2026121230319Open ↗
01/22/2025101835383Open ↗
02/19/2021121772037Open ↗
Showing 3 of 31 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION30
02/02/2026121230319Open ↗
01/14/2025101835383Open ↗
01/03/2025101835383Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWLPC Approval/Permit5
08/13/2026M00890486-I1Open ↗
08/13/2026M01248452-I1Open ↗
08/13/2026M01243630-S1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications62
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION23
07/26/2017121230319Open ↗
06/08/2017122548779Open ↗
10/12/2016140269484Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/30/2026M00890486-I1Open ↗
08/29/2026M00937825-I1Open ↗
08/21/2026M01248452-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026M00937825-I1Open ↗
09/23/2026M00937825-I1Open ↗
09/23/2026M00937825-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026M00937825-I1Open ↗
09/23/2026M00937825-I1Open ↗
08/25/2026M01248452-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
09/14/2018140802987Open ↗
04/30/2015122383214Open ↗
10/17/2014140269484Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
04/30/2015122383214Open ↗
09/17/2013121772037Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/14/2018140802987Open ↗
10/17/2014140269484Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/14/2018140802987Open ↗
10/17/2014140269484Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/25/2020140888528Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment28
▸BISSELF-CERT PLUMBING NOTICE13
12/04/2014121772037Open ↗
09/17/2014121772037Open ↗
01/03/2013121068423Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING8
12/18/2024101835383Open ↗
09/17/2013121772037Open ↗
08/07/2012121176404Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
03/22/2018121772037Open ↗
09/03/2014121772037Open ↗
09/03/2014121772037Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/02/2015122548779Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/27/2020121772037Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
12/04/2014121772037Open ↗
▸Safety & Tenant Protection5
▸BISTENANT PROTECTION PLAN AND NOTES4
02/09/2021121772037Open ↗
02/25/2020140888528Open ↗
09/14/2018140802987Open ↗
Showing 3 of 4 on file for this type
▸BISTENANT PROTECTION PLAN 2008 CODE1
10/17/2014140269484Open ↗
▸Environmental & Asbestos18
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
02/25/2020140888528Open ↗
08/11/2017121230319Open ↗
07/26/2017121230319Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/30/2026M00890486-I1Open ↗
08/29/2026M00937825-I1Open ↗
08/21/2026M01248452-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance24
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
07/26/2017121230319Open ↗
06/08/2017122548779Open ↗
11/02/2015122548779Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
03/02/2021121772037Open ↗
12/09/2020140888528Open ↗
11/23/2020140802987Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
03/02/2021121772037Open ↗
11/23/2020140802987Open ↗
06/08/2017122548779Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/14/2018140802987Open ↗
10/17/2014140269484Open ↗
▸BISNYCECC ANALYSIS1
10/17/2014140269484Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY14
02/04/2025101835383Open ↗
01/10/2025101835383Open ↗
12/13/2024101835383Open ↗
Showing 3 of 14 on file for this type
▸Approvals, Objections & Sign-offs37
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
02/05/2025101835383Open ↗
03/02/2021121772037Open ↗
12/09/2020140888528Open ↗
Showing 3 of 12 on file for this type
▸BISLANDMARKS APPROVAL9
03/16/2020140888528Open ↗
09/14/2018140802987Open ↗
08/11/2017121230319Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
08/07/2012121176404Open ↗
Showing 1 of 7 on file for this type
▸BISSUPERSEDING LETTER5
03/04/2026121230319Open ↗
01/22/2025101835383Open ↗
02/19/2021121772037Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
03/08/2018121230319Open ↗
08/18/2017121230319Open ↗
Showing 2 of 3 on file for this type
▸BISLANDMARKS SIGNOFF1
11/23/2020140802987Open ↗
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT21
03/02/2021121772037Open ↗
02/25/2020140888528Open ↗
09/14/2018140802987Open ↗
Showing 3 of 21 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/09/2020140888528Open ↗
▸Filing & Intake Forms24
▸BISEFILING COVER SHEET9
07/26/2017121230319Open ↗
11/02/2015122548779Open ↗
04/30/2015122383214Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION8
01/06/2025101835383Open ↗
11/23/2020140802987Open ↗
10/27/2020121772037Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM4
03/04/2026121230319Open ↗
01/22/2025101835383Open ↗
02/19/2021121772037Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
02/25/2020140888528Open ↗
09/14/2018140802987Open ↗
10/17/2014140269484Open ↗
▸Other Documents7
▸DOB NOWManufacturer's Specifications2
08/13/2026M00976690-I1Open ↗
08/13/2026M00976690-P1Open ↗
▸DOB NOWCalculations2
08/13/2026M00976690-P1Open ↗
08/13/2026M00976690-I1Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
06/20/2012121068423Open ↗
▸BISOTCR DENIAL-CHIMNEYCRETE LINER1
01/28/2020140802987Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
10/27/2020121772037Open ↗