DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
ECB02/11/2005PLUMBING WORK WITHOUT A PERMIT. NEW INSTALLATION OF GAS PIPING FROM BEFORE METER BAR AND RUNNING IN EXCESS OF 100 FEET THROUGHOUT GROUND FLOOR OF LOCATION AND ENDING WITH A 3/4" GAS VALVE FOR COOKING. ALSO NEWNothing owed — awaiting certificate of correction
ECB02/11/2005PLUMBING WORK PERFORMED IS REQUIRED TO BE PERFORMED BY A LICENSED MASTER PLUMBER. NEW INSTALLATION OF GAS PIPING FROM BEFORE METER BAR AND RUNNING IN EXCESS OF 100 FEET THROUGHOUT GROUND FLOOR OF LOCATION ANDNothing owed — awaiting certificate of correction
ECB02/11/2005FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED. NEW INSTALLATION OF GAS PIPING FROM BEFORE MUTER BAR AND RUNNING IN EXCESS OF 100 FEET THROUGHOUT GROUND FLOOR OF LOCATION AND ENDING WITH A 3/4" VALVE.Nothing owed — awaiting certificate of correction
Factory, light manufacturing · Owner of record: DASA REALTY CORP · 7,968 sf lot · 1.12 FAR built · Flood zone X