M.S. 428 - Global Innovators Academy
4012 FORT HAMILTON PARKWAY · Name © OpenStreetMap contributors · BIN 3429454
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction357p · 6 filings · 20 docs
Floor 4Under Construction13p · 4 filings · 20 docs
Floor 3Under Construction378p · 3 filings · 20 docs
Floor 2Under Construction376p · 3 filings · 20 docs
Floor 1Under Construction377p · 3 filings · 20 docs
CellarUnder Construction382p · 3 filings · 20 docs
2 jobs · most recent 08/10/2026
Air Conditioning Systems Others Refrigeration Systems Ventilation Systems Generators
FiledStatusContractorScopeMake / Model / Capacity
08/10/2026Permit IssuedFORTE CONSTRUCTION CORPAir Conditioning Systems, Others, Refrigeration Systems, Ventilation Systems
Cooling
Mitsubishi Electric PKA-A24KA8 24,000 BTU · Fan Coil Indoor ×9
PUY-A24NHA7 24,000 BTU · Condensing Unit ×9
TPKFYP012LM140B 12,000 BTU · Vrf Indoor ×9
PKA-A12LA1 12,000 BTU · Fan Coil Indoor ×6
PUY-A12NKA7 12,000 BTU · Condensing Unit ×6
TPKFYP018LM140B 18,000 BTU · Vrf Indoor ×6
NTXMSM72A1123AA 72,000 BTU · Condensing Unit ×3
Trane OAKE240A3-C1B404JN-D3F06AL7JG4F45E0B5A0 6,300 CFM · Rooftop Unit ×3
OANE360A3-C1B404JN-D3J06AL7HE4005E0E5G0 5,600 CFM · Rooftop Unit ×3
OANE360A3-C1B404JR-D3H06AL7JL4F55E0B5G0 7,650 CFM · Rooftop Unit ×3
OANE420A3-C1B404JT- D3J06AL7JL4F55E0E5G0 9,132 CFM · Rooftop Unit ×3
OANE480A3-C1B404LR-D3K06AL7JL4F75E0E5G0 11,100 CFM · Rooftop Unit ×3
Ventilation
Greenheck AX-63-300-160-0630-A50-HT 1,200 CFM · Pump ×5
BSQ-70-4-X 250 CFM · Exhaust Fan ×3
BSQ-90-4-X 500 CFM · Exhaust Fan ×3
CUBE-180HP-10-1-30-G 2,500 CFM · Kitchen Exhaust ×3
GB-097-4-1-19-X 200 CFM · Exhaust Fan ×3
GB-098-3-1-19-X 400 CFM · Exhaust Fan ×3
GB-130-5-1-19-X 1,300 CFM · Exhaust Fan ×3
GB-140-7-1-22-X 1,900 CFM · Exhaust Fan ×3
GB-140HP-7-1-22-X 950 CFM · Exhaust Fan ×3
BSQ-100-4-X 800 CFM · Exhaust Fan ×1
Refrigeration
Bally BLP209LE-S2D-SV+ 8,915 BTU · Condensing Unit ×4
BLP209MA-S1D-SV+ 7,387 BTU · Fan Coil Indoor ×4
BFZD064C8-HT3D-S 16,302 BTU · Condensing Unit ×2
BLP209LE-S2D-SVP 8,915 BTU · Fan Coil Indoor ×2
BLP209MA-S1D-SVP 7,387 BTU · Fan Coil Indoor ×2
BFZD064C8-HT3D-S0124 16,302 BTU · Condensing Unit ×1
Other
Obar GBR89HA 150 CFM · Exhaust Fan ×2
04/23/2026Signed-offR.A.M.S. MECHANICAL INCGenerators
Generators
Cummins DQDAA 250 kW · Generator ×1
Generac SD0250GG178.7D18HPLY3 250 kW · Generator ×1
1 job · most recent 07/01/2026
FiledStatusContractorScope
07/01/2026Permit IssuedMARIC PLBG & HTG INC1,220 heads, 6 outlets
1 job · most recent 08/10/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/10/2026Permit IssuedEAGLE 1 MECHANICAL, INCGas, Storm, Water/Sanitary
9 jobs · most recent 06/24/2026
General Wiring
FiledStatusContractorScope
06/24/2026Permit IssuedLCJ ELEC'L CONTR'S INC—
06/24/2026Permit IssuedLCJ ELEC'L CONTR'S INC—
06/24/2026Permit IssuedLCJ ELEC'L CONTR'S INCGeneral Wiring
06/19/2026Permit IssuedLCJ ELEC'L CONTR'S INCGeneral Wiring
02/27/2026Permit IssuedIDL COMMUNICATIONS AND1 meters
01/02/2026Permit IssuedLCJ ELEC'L CONTR'S INC—
12/18/2025Permit IssuedEASTERN ELEC'L CONST INC—
01/29/2025Permit IssuedNYCOM ELECTRICAL CORP—
03/20/2024CompleteABM ELECTRIC, INC—
2 jobs · most recent 08/10/2026
Steel Concrete
FiledStatusContractorScope
08/10/2026Permit IssuedFORTE CONSTRUCTION CORPSteel, Concrete
10/13/2025Signed-offFORTE CONSTRUCTION CORP5 scope_items
1 job · most recent 06/25/2026
FiledStatusContractorScope
06/25/2026Permit IssuedFORTE CONSTRUCTION CORP198 panels, 86.13 kw, 1,600 roof_area_sqft
4 jobs · most recent 06/10/2026
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
06/10/2026Permit IssuedFORTE CONSTRUCTION CORPFence
04/27/2026Signed-offFORTE CONSTRUCTION CORPScaffold
06/17/2025Signed-offFORTE CONSTRUCTION CORPSidewalk Shed
03/13/2023Permit IssuedFORTE CONSTRUCTION CORPFence
Building Lifecycle
All (270)Filed (65)Permit Issued (80)Signed Off (3)Violation (6)Inspection (15)Objection (71)Special Inspection (30)
09/10/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/27/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/26/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/24/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
08/19/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/17/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/11/2026
Special inspection requirement — Structural Cold-Formed Steel
STEPHEN LATUS
08/11/2026
Special inspection requirement — Final
STEPHEN LATUS
08/11/2026
Special inspection requirement — Structural Steel - High Strength Bolting
STEPHEN LATUS
08/11/2026
Special inspection requirement — Concrete - Cast-In-Place
STEPHEN LATUS
08/11/2026
Special inspection requirement — Structural Steel - Details
STEPHEN LATUS
08/11/2026
Special inspection requirement — Structural Steel - Welding
STEPHEN LATUS
08/10/2026
Filed — New Building
P.S. 004-K: CIVIL WORK-The scope of work includes site grading, drainage, underground utility connections, stormwater management facilities/practices, pavement, fencing, site furnishes, plantings and landscaping mulch
B08023579-B2
08/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN LATUS
08/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
CLOUD LEE
08/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
CLOUD LEE
08/10/2026
Special inspection requirement — Energy Code Compliance Inspections
STEPHEN LATUS
08/10/2026
Special inspection requirement — Post-installed Anchors
STEPHEN LATUS
08/10/2026
Special inspection requirement — Maintenance information
CLOUD LEE
08/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
CLOUD LEE
08/06/2026
Filed — No Work
B00856074-P3
07/27/2026
Filed — New Building
P.S. 004-K: CIVIL WORK-The scope of work includes site grading, drainage, underground utility connections, stormwater management facilities/practices, pavement, fencing, site furnishes, plantings and landscaping mulch
B08023579-B1
07/22/2026
Special inspection requirement — Sprinkler Systems
STEPHEN LATUS
07/22/2026
Special inspection requirement — Post-installed Anchors
STEPHEN LATUS
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN LATUS
07/22/2026
Special inspection requirement — Public Assembly Emergency Lighting
STEPHEN LATUS
07/22/2026
Special inspection requirement — Standpipe Systems
STEPHEN LATUS
07/21/2026
Special inspection requirement — Energy Code Compliance Inspections
STEPHEN LATUS
07/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
CLOUD LEE
07/21/2026
Special inspection requirement — Post-installed Anchors
STEPHEN LATUS
07/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
CLOUD LEE
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN LATUS
07/21/2026
Special inspection requirement — Maintenance information
CLOUD LEE
07/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
CLOUD LEE
07/20/2026
Permit issued — Solar
B01312946-I1-SL
07/16/2026
Objection raised — Other
07/14/2026
Objection raised — Other
07/13/2026
Signed off — Alteration
SH/IS4K - FOR TEMPORARY CONSTRUCTION EQUIPMENT (SHED) ON ROADWAY, RELATED TO JOB B08023579. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B00933997-I1
07/08/2026
Filed — New Building
P.S. 004-K: CIVIL WORK-The scope of work includes site grading, drainage, underground utility connections, stormwater management facilities/practices, pavement, fencing, site furnishes, plantings and landscaping mulch
B08023579-A9
07/08/2026
Objection resolved — Resolved
07/07/2026
Filed — No Work
B00856074-P2
07/06/2026
Filed — No Work
B00855933-P1
07/06/2026
Objection raised — Other
07/02/2026
Signed off — Alteration
CH/IS4K - FOR TEMPORARY CONSTRUCTION EQUIPMENT(CHUTE) SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO JOB B08023579. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B00934006-I1
07/02/2026
Objection raised — Other
07/01/2026
Filed — Alteration
P.S. 004K: PROPOSED NB-SPRINKLER AND STANDPIPE WORK. This application is filed in conjunction with the NB application which is filed under 2014 code.
B00816285-P2
06/26/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/25/2026
Filed — Alteration
4K---(CANOPY STRUCTURAL)--- PV SYSTEM DESIGN & PV SUPPORT SYSTEM PLANS FILED IN CONJUNCTION TO NB#B08023579 & B01294395 . ALL AS PER PLANS FILED HEREWITH.
B01312946-P1
06/22/2026
Permit issued — Standpipe
B00816285-I1-EW-SD
06/22/2026
Permit issued — Standpipe
B00816285-I1-EW-SP
06/22/2026
Objection raised — Other
06/19/2026
Special inspection requirement — Public Assembly Emergency Lighting
STEPHEN LATUS
06/19/2026
Special inspection requirement — Public Assembly Emergency Lighting
STEPHEN LATUS
06/18/2026
Special inspection requirement — Final
STEPHEN LATUS
06/18/2026
Special inspection requirement — Post-installed Anchors
STEPHEN LATUS
06/18/2026
Special inspection requirement — Mechanical Systems
STEPHEN LATUS
06/12/2026
Signed off — Alteration
SF/IS4K - FOR TEMPORARY CONSTRUCTION EQUIPMENT(SCAFFOLD) SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO JOB B08023579. NO CHANGE IN USE, OCCUPANCY OR EGRESS
B00934004-I1
06/10/2026
Filed — Alteration
FN/IS4K - FOR TEMPORARY CONSTRUCTION EQUIPMENT(FENCE) SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO JOB B08023579-I1. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00933989-P3
06/05/2026
Filed — New Building
P.S. 004-K: CIVIL WORK-The scope of work includes site grading, drainage, underground utility connections, stormwater management facilities/practices, pavement, fencing, site furnishes, plantings and landscaping mulch
B08023579-A7
06/03/2026
Permit issued — Foundation
B08023579-S2-FO
Latest 60 of 270 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY14709/13/2026
FORTE CONSTRUCTION603/22/2026
DIMITRI ENTERPRISES303/22/2026
LONGHORN CORP203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV ASSOCIATES6303/21/2026
JMV ASSOCIATES LLC203/21/2026
PRECISION 3SIXTY NYC, INC3003/21/2026
LOMBARDO PROFESSIONAL ENGINEERING103/21/2026
TAREK M ZEID P E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FORTE CONSTRUCTION CORPGeneral Contractor7907/22/2026
EAGLE 1 MECHANICAL, INCPlumbing907/08/2026
MARIC PLBG & HTG INCFire Protection806/28/2026
NATIONAL ENVIROMENTAL SAFETYGeneral Contractor607/08/2026
R.A.M.S. MECHANICAL INCGeneral Contractor407/08/2026
LCJ ELEC'L CONTR'S INCElectrical203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MUNICIPAL TESTING LABORAT2305008/10/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedFORTE CONSTRUCTION CORP07/20/2026
DOB NOWStandpipePermit IssuedMARIC PLBG & HTG INC06/22/2026
DOB NOWStandpipePermit IssuedMARIC PLBG & HTG INC06/22/2026
DOB NOWFoundationPermit IssuedFORTE CONSTRUCTION CORP06/03/2026
DOB NOWSolarPermit IssuedFORTE CONSTRUCTION CORP05/04/2026
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP04/28/2026
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP04/28/2026
DOB NOWMechanical SystemsSigned-offR.A.M.S. MECHANICAL INC04/16/2026
DOB NOWConstruction FencePermit IssuedFORTE CONSTRUCTION CORP04/08/2026
DOB NOWGeneral ConstructionPermit IssuedR.A.M.S. MECHANICAL INC04/02/2026
DOB NOWGeneral ConstructionSigned-offR.A.M.S. MECHANICAL INC04/02/2026
DOB NOWGeneral ConstructionPermit IssuedFORTE CONSTRUCTION CORP03/31/2026
DOB NOWStructuralPermit IssuedFORTE CONSTRUCTION CORP03/31/2026
DOB NOWPlumbingPermit IssuedEAGLE 1 MECHANICAL, INC03/31/2026
DOB NOWPlumbingPermit IssuedEAGLE 1 MECHANICAL, INC03/31/2026
DOB NOWGeneral ConstructionPermit IssuedFORTE CONSTRUCTION CORP03/18/2026
DOB NOWGeneral ConstructionPermit IssuedFORTE CONSTRUCTION CORP03/17/2026
DOB NOWGeneral ConstructionPermit IssuedFORTE CONSTRUCTION CORP03/17/2026
DOB NOWGeneral ConstructionPermit IssuedFORTE CONSTRUCTION CORP03/17/2026
DOB NOWMechanical SystemsPermit IssuedFORTE CONSTRUCTION CORP03/17/2026
DOB NOWEarth WorkPermit IssuedFORTE CONSTRUCTION CORP03/17/2026
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP03/11/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedFORTE CONSTRUCTION CORP02/27/2026
DOB NOWGeneral ConstructionPermit IssuedFORTE CONSTRUCTION CORP01/08/2026
DOB NOWGeneral ConstructionPermit IssuedFORTE CONSTRUCTION CORP01/08/2026
DOB NOWSidewalk ShedSigned-offFORTE CONSTRUCTION CORP12/22/2025
DOB NOWSupported ScaffoldSigned-offFORTE CONSTRUCTION CORP12/22/2025
DOB NOWGeneral ConstructionPermit IssuedFORTE CONSTRUCTION CORP12/22/2025
DOB NOWSupport of ExcavationSigned-offFORTE CONSTRUCTION CORP12/18/2025
DOB NOWStructuralPermit IssuedFORTE CONSTRUCTION CORP12/18/2025
DOB NOWSupport of ExcavationSigned-offFORTE CONSTRUCTION CORP12/18/2025
DOB NOWPlumbingPermit IssuedEAGLE 1 MECHANICAL, INC12/03/2025
DOB NOWConstruction FencePermit IssuedFORTE CONSTRUCTION CORP09/25/2025
DOB NOWConstruction FencePermit IssuedFORTE CONSTRUCTION CORP09/25/2025
DOB NOWStandpipePermit IssuedMARIC PLBG & HTG INC07/23/2025
DOB NOWSprinklersPermit IssuedMARIC PLBG & HTG INC07/23/2025
DOB NOWStandpipePermit IssuedMARIC PLBG & HTG INC05/29/2025
DOB NOWStandpipePermit IssuedMARIC PLBG & HTG INC05/29/2025
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP05/09/2025
DOB NOWGeneral ConstructionPermit IssuedFORTE CONSTRUCTION CORP03/26/2025
+ 10 more permits on file
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
09/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/27/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/26/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/24/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
08/19/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/17/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/26/2026Pass-Final PL - UndergroundPassView ↗
04/01/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/26/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/18/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/19/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/14/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/11/2026FinalSTEPHEN LATUSprogress
08/11/2026Structural Cold-Formed SteelSTEPHEN LATUSspecial
08/11/2026Structural Steel - High Strength BoltingSTEPHEN LATUSspecial
08/11/2026Structural Steel - WeldingSTEPHEN LATUSspecial
08/11/2026Concrete - Cast-In-PlaceSTEPHEN LATUSspecial
08/11/2026Structural Steel - DetailsSTEPHEN LATUSspecial
08/10/2026Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
08/10/2026HVAC-R and service water heating system controlsCLOUD LEEenergy_progress
08/10/2026HVAC-R and service water heating equipmentCLOUD LEEenergy_progress
08/10/2026Maintenance informationCLOUD LEEenergy_progress
08/10/2026HVAC-R and service water piping design and insulationCLOUD LEEenergy_progress
08/10/2026Energy Code Compliance InspectionsSTEPHEN LATUSprogress
08/10/2026Post-installed AnchorsSTEPHEN LATUSspecial
07/22/2026Standpipe SystemsSTEPHEN LATUSspecial
07/22/2026Sprinkler SystemsSTEPHEN LATUSspecial
07/22/2026Public Assembly Emergency LightingSTEPHEN LATUSprogress
07/22/2026Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
07/22/2026Post-installed AnchorsSTEPHEN LATUSspecial
07/21/2026Energy Code Compliance InspectionsSTEPHEN LATUSprogress
07/21/2026HVAC-R and service water heating system controlsCLOUD LEEenergy_progress
07/21/2026HVAC-R and service water heating equipmentCLOUD LEEenergy_progress
07/21/2026Maintenance informationCLOUD LEEenergy_progress
07/21/2026HVAC-R and service water piping design and insulationCLOUD LEEenergy_progress
07/21/2026Post-installed AnchorsSTEPHEN LATUSspecial
07/21/2026Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
Latest 25 of 150.
▾Documents — 546 on file (BIS + DOB NOW)
▸Plans & Drawings64
▸DOB NOWPlans/Sketch58
08/27/2026B08024567-P2Request digital key ↗
08/27/2026B08024567-P3Request digital key ↗
08/27/2026B08024567-I1Request digital key ↗
Showing 3 of 58 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly6
08/27/2026B00856074-I1Request digital key ↗
08/27/2026B00856074-P1Request digital key ↗
08/27/2026B00856074-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits10
▸DOB NOWDEP Stormwater Construction Permit10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/16/2026B08023579-I1Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/16/2026B08023579-I1Open ↗
Showing 1 of 4 on file for this type
▸Seals & Professional Certifications173
▸DOB NOWDPL-1: Design Professional Seal & Signature65
08/27/2026B08024567-P3Open ↗
08/27/2026B08024567-P2Open ↗
08/27/2026B08024567-P1Open ↗
Showing 3 of 65 on file for this type
▸DOB NOWProgress Inspector Seal & Signature64
09/07/2026B08023579-A7Open ↗
09/07/2026B08023579-A7Open ↗
09/07/2026B08023579-A7Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature44
09/23/2026B00816323-I1Open ↗
09/07/2026B08023579-A7Open ↗
09/07/2026B08023579-S3Open ↗
Showing 3 of 44 on file for this type
▸Trade Schedules & Equipment10
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)10
08/16/2026B08023579-I1Open ↗
Showing 1 of 10 on file for this type
▸Safety & Tenant Protection28
▸DOB NOWStreet Tree Checklist13
08/16/2026B08023579-I1Open ↗
Showing 1 of 13 on file for this type
▸DOB NOWNYCSCA - Approved Site Safety Plans11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs134
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter63
08/27/2026B00856074-I1Open ↗
08/27/2026B00856074-P3Open ↗
08/16/2026B08023579-I1Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)60
08/18/2026B01312946-I1Open ↗
08/17/2026B00816323-P2Open ↗
08/17/2026B00816323-S1Open ↗
Showing 3 of 60 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)11
08/26/2026B00933997-I1Open ↗
08/26/2026B00934006-I1Open ↗
08/17/2026B00934004-I1Open ↗
Showing 3 of 11 on file for this type
▸Cost, Insurance & Ownership1
▸DOB NOWNYCSCA Wrap-up Insurance1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents116
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal67
08/27/2026B00856074-I1Open ↗
08/27/2026B00856074-P3Open ↗
08/17/2026B00816323-S1Open ↗
Showing 3 of 67 on file for this type
▸DOB NOWSite Survey: Initial13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone13
08/16/2026B08023579-I1Open ↗
Showing 1 of 13 on file for this type
▸DOB NOWAlternate Plan 34
08/27/2026B00856074-I1Open ↗
08/27/2026B00856074-P1Open ↗
08/27/2026B00856074-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/16/2026B08023579-I1Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWAlternate Plan 24
08/27/2026B00856074-P3Open ↗
08/27/2026B00856074-I1Open ↗
08/27/2026B00856074-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAlternate Plan 14
08/27/2026B00856074-P3Open ↗
08/27/2026B00856074-P1Open ↗
08/27/2026B00856074-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWNYCSCA Exhibit 23
08/26/2026B00933997-I1Open ↗
08/26/2026B00934006-I1Open ↗
08/17/2026B00934004-I1Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type