← Back
Public elementary, junior or senior high
P.S. K134
4019 18 AVENUE · BIN 3127692
💬 Discuss this project
1933Year Built
3Stories
W1Building Class
R6AZoning
—Gross Floor Area
0Units
20 Open Violations 12 unresolved · 8 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 0.77 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Roof2p · 1 filing · 20 docs
Floor 34p · 1 filing · 20 docs
Floor 2
Floor 15p · 2 filings · 20 docs
Basement2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY309/14/2026
NYC DEPARTMENT OF EDUCATION203/22/2026
DEPARTMENT OF EDUCATION1303/22/2026
DOE PS 134 040103/22/2026
DOE PS 134103/22/2026
PS 134 DOE1303/22/2026
PS 134 D.O.E 0103/22/2026
P.S. 134 ANNEX D.O.E.203/22/2026
PS 134 DEPT OF ED103/22/2026
SCHOOL CONSTRUCTION AUTHO103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHARAN ELEC'L ENTERP'S INElectrical303/22/2026
CARL WEISSElectrical103/21/2026
GEMINI ELECTRIC CO., INC.Electrical103/22/2026
JOHN MILIOTIElectrical103/21/2026
LEKTRIC INSTALLATIONS CORElectrical103/22/2026
Building Lifecycle
All (109)Filed (11)Violation (60)Objection (22)Special Inspection (16)
09/03/2026
Objection resolved — Open
09/03/2026
Objection resolved — Open
09/03/2026
Objection resolved — Open
09/02/2026
Objection resolved — Open
08/28/2026
Objection resolved — Resolved
08/28/2026
Objection resolved — Resolved
08/28/2026
Objection resolved — Resolved
08/26/2026
Objection resolved — Resolved
08/25/2026
Objection resolved — Resolved
08/25/2026
Objection resolved — Resolved
08/25/2026
Objection resolved — Resolved
07/30/2026
Objection raised — Other
07/30/2026
Objection raised — Other
07/30/2026
Objection raised — Other
07/30/2026
Objection raised — Other
07/28/2026
Objection raised — Other
07/27/2026
Objection raised — Other
07/27/2026
Objection raised — Other
07/27/2026
Objection raised — Other
07/27/2026
Objection raised — Other
07/27/2026
Objection raised — Other
07/27/2026
Objection raised — Other
07/21/2026
Filed — Alteration
HEREWITH FILING FOR REMOVALS IN MAIN BUILDING AS PER PLANS. NO CHANGE OF USE. EGRESS, OR OCCUPANCY.
B01422568-S1
07/20/2026
Filed — Alteration
HEREWITH FILING FOR SPRINKLER REMOVALS IN ANNEX BUILDING AS PER PLANS. NO CHANGE OF USE. EGRESS, OR OCCUPANCY.
B01422442-S3
07/20/2026
Filed — Alteration
HEREWITH FILING FOR SPRINKLER REMOVALS IN ANNEX BUILDING AS PER PLANS. NO CHANGE OF USE. EGRESS, OR OCCUPANCY.
B01422442-S2
07/20/2026
Filed — Alteration
HEREWITH FILING FOR SPRINKLER REMOVALS IN ANNEX BUILDING AS PER PLANS. NO CHANGE OF USE. EGRESS, OR OCCUPANCY.
B01422442-I1
07/17/2026
Filed — Alteration
HEREWITH FILING FOR REMOVAL OF METAL CANOPY AS PER PLANS. NO CHANGE OF USE. EGRESS, OR OCCUPANCY.
B01422354-I1
07/17/2026
Filed — Alteration
HEREWITH FILING FOR REMOVALS IN MAIN BUILDING AS PER PLANS. NO CHANGE OF USE. EGRESS, OR OCCUPANCY.
B01422568-S2
07/17/2026
Filed — Alteration
HEREWITH FILING FOR REMOVALS IN MAIN BUILDING AS PER PLANS. NO CHANGE OF USE. EGRESS, OR OCCUPANCY.
B01422568-I1
07/17/2026
Filed — Alteration
HEREWITH FILING FOR REMOVALS IN MAIN BUILDING AS PER PLANS. NO CHANGE OF USE. EGRESS, OR OCCUPANCY.
B01422568-S3
07/17/2026
Special inspection requirement — Structural Steel - High Strength Bolting
07/17/2026
Special inspection requirement — Structural Steel - Welding
07/17/2026
Special inspection requirement — Structural Steel - Details
07/16/2026
Filed — Alteration
HEREWITH FILING FOR SOE REMOVALS AS PER PLANS. NO CHANGE OF USE. EGRESS, OR OCCUPANCY.
B01422636-I1
07/16/2026
Filed — Alteration
HEREWITH FILING CIVIL PLUMBING AS PER PLANS. NO CHANGE OF USE. EGRESS, OR OCCUPANCY.
B01422397-I1
07/16/2026
Filed — Alteration
HEREWITH FILING CIVIL PLUMBING AS PER PLANS. NO CHANGE OF USE. EGRESS, OR OCCUPANCY.
B01422397-S1
07/16/2026
Special inspection requirement — Final
07/07/2026
Special inspection requirement — Post-installed Anchors
07/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/07/2026
Special inspection requirement — Post-installed Anchors
07/07/2026
Special inspection requirement — Structural Steel - Welding
07/07/2026
Special inspection requirement — Structural Steel - Details
07/07/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
06/25/2026
Special inspection requirement — Final
06/25/2026
Special inspection requirement — Final
Tommy Maene
06/25/2026
Special inspection requirement — Mechanical Systems
06/25/2026
Special inspection requirement — Final
06/25/2026
Special inspection requirement — Mechanical Systems
06/25/2026
Special inspection requirement — Final
02/17/2026
Violation issued (ECB, open)
Construction
02/17/2026
Violation issued (ECB, open)
Construction
02/17/2026
Violation issued (ECB, open)
Construction
02/17/2026
Violation issued (ECB, open)
Construction
01/12/2026
Violation issued (FDNY_ORDER, closed)
01/12/2026
Violation issued (FDNY_ORDER, closed)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/10/2025
Violation issued (FDNY_ORDER, closed)
10/10/2025
Violation issued (FDNY_ORDER, closed)
10/10/2025
Violation issued (FDNY_ORDER, closed)
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDCOMMERCE ELECTRICAL CONTR08/23/2016
BISOTISSUEDARMSTRONG ROOFING CORP05/09/2016
BISOTISSUEDARMSTRONG ROOFING CORP05/09/2016
BISEQISSUEDARMSTRONG ROOFING CORP03/29/2016
BISEQISSUEDARMSTRONG ROOFING CORP02/02/2016
BISEQISSUEDARMSTRONG ROOFING CORP10/21/2015
BISOTISSUEDK.A.B. ELECTRIC CORP07/20/2015
BISOTISSUEDHIGH VOLT ELECTRIC CORP O10/24/2014
BISOTISSUEDMINHAS CONSTRUCTION CORP08/27/2013
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.07/17/2013
BISOTISSUEDWDF INC02/02/2010
BISOTISSUEDWDF INC02/04/2009
BISOTISSUEDPRO METAL CONSTRUCTION10/21/2008
BISEQISSUEDPRO METAL CONSTRUCTION10/21/2008
BISPLISSUEDVARSITY PLBG AND HTG INC10/21/2008
BISEQISSUEDMETROPOLITAN ENTERPRISES INC10/09/2008
BISEQISSUEDWDF INCORPORATED06/19/2008
BISEQISSUEDWDF INCORPORATED04/10/2008
BISOTISSUEDWDF INCORPORATED02/08/2008
BISEQISSUEDYORK SCAFFOLD EQUIPMENT CORP.09/14/2007
BISOTISSUEDWDF INCORPORATED03/12/2007
BISEQISSUEDWDF INCORPORATED03/12/2007
BISFSISSUEDEFFICIENT COMB&COOLING CO10/01/2004
BISOTISSUEDMAXIMUM MECHANICAL CORPORATION02/13/2003
BISPLISSUEDMAXIMUM MECHANICAL CORPORATION02/13/2003
BISBLISSUEDMAXIMUM MECHANICAL CORPORATION11/01/2001
BISPLISSUEDMAXIMUM MECHANICAL CORPORATION11/01/2001
BISFBISSUEDEFFICIENT COMB&COOLING CO09/21/2000
BISPLISSUEDVARSITY PLBG AND HTG INC09/21/2000
BISOTISSUEDMAXIMUM MECHANICAL CORPORATION09/13/2000
BISFSISSUEDMAXIMUM MECHANICAL CORPORATION09/13/2000
BISEQISSUEDMAXIMUM MECHANICAL COPORATION09/11/2000
BISEQISSUEDSAFEWAY STEEL PRODUCT01/12/2000
BISEQISSUEDSAFEWAY STEEL PRODUCT01/26/1999
BISPLISSUEDLLOYD G DRUMMOND PLBG&GEN06/09/1995
BISPLISSUEDSTILLSON PLUMBING AND HEATING CO08/30/1994
BISPLISSUEDB.H. MOTTO & CO.,INC.07/09/1991
BISOTISSUEDPIONEER CONST. CO.07/08/1991
2 projects · most recent 07/21/2026
Ventilation Systems Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
07/21/2026——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Greenheck RV-40-10-1 133,200 BTU · Rooftop Unit ×1
Heating
Greenheck RV-40-10-1 82,800 BTU · Rooftop Unit ×1
Ventilation
Greenheck RV-40-10-1 3,000 CFM · Erv ×1
07/20/2026——Ventilation Systems—
3 projects · most recent 07/21/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/21/2026——Gas, Storm
07/20/2026——Gas, Water/Sanitary
07/16/2026——Storm
14 projects · most recent 07/27/2026
General Wiring Lighting
FiledStatusContractorScope
07/27/2026Permit IssuedINLIGHT ELECTRICAL CORPGeneral Wiring
06/24/2025CompleteEVEREST ELECTRIC CORP—
06/24/2025CompleteEVEREST ELECTRIC CORP—
06/24/2025CompleteEVEREST ELECTRIC CORP—
06/20/2024Permit IssuedA & S ELECTRIC INC.General Wiring
07/28/2023CompleteGEMINI ELECTRIC CO., INC.—
11/01/2022CompleteCHARAN ELEC'L ENTERP'S IN—
07/06/2022CompleteCHARAN ELEC'L ENTERP'S IN—
02/18/2022CompleteCHARAN ELEC'L ENTERP'S IN—
03/13/2020CompleteCHARAN ELEC'L ENTERP'S IN—
08/15/2019Permit IssuedCHARAN ELEC'L ENTERP'S INGeneral Wiring
12/07/2018CompleteCHARAN ELEC'L ENTERP'S IN—
05/08/2018CompleteCHARAN ELEC'L ENTERP'S IN—
12/17/2017CompleteLEKTRIC INSTALLATIONS CORLighting
3 projects · most recent 07/21/2026
Steel
FiledStatusContractorScope
07/21/2026——1 scope_items
07/20/2026——Steel
07/16/2026——1 scope_items
1 project · most recent 07/20/2026
Fence
FiledStatusContractorScope
07/20/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
07/17/2026Structural Steel - High Strength Bolting—special
07/17/2026Structural Steel - Welding—special
07/17/2026Structural Steel - Details—special
07/16/2026Final—progress
07/07/2026Post-installed Anchors—special
07/07/2026Structural Stability – Alterations of existing buildings—special
07/07/2026Post-installed Anchors—special
07/07/2026Structural Steel - Welding—special
07/07/2026Structural Steel - Details—special
07/07/2026Excavations - Sheeting, Shoring, and Bracing—special
06/25/2026Final—progress
06/25/2026FinalTommy Maeneprogress
06/25/2026Mechanical Systems—special
06/25/2026Final—progress
06/25/2026Mechanical Systems—special
06/25/2026Final—progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Public School 134Education—
Project B01422442 Alteration · Objections · 07/20/2026
Project B01422568 Alteration · Objections · 07/17/2026
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/16/2026B01422568-S4Request digital key ↗
08/16/2026B01422442-S4Request digital key ↗
08/15/2026B01422442-S2Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/16/2026B01422397-S1Open ↗
08/16/2026B01422397-I1Open ↗
08/16/2026B01422636-I1Open ↗
Showing 3 of 12 on file for this type
▸Approvals, Objections & Sign-offs36
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/16/2026B01422442-S1Open ↗
08/15/2026B01422442-S2Open ↗
08/15/2026B01422442-S3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)12
08/16/2026B01422442-S1Open ↗
08/15/2026B01422442-S2Open ↗
08/15/2026B01422442-S3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)12
08/16/2026B01422442-S1Open ↗
08/15/2026B01422442-S2Open ↗
08/15/2026B01422442-S3Open ↗
Showing 3 of 12 on file for this type
▸Other Documents12
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal12
08/16/2026B01422568-S4Open ↗
08/15/2026B01422442-S2Open ↗
08/15/2026B01422442-S3Open ↗
Showing 3 of 12 on file for this type