2 Open Violations 1 unresolved · 1 paperwork only▸
ECB06/08/2026ATOI, AT 1:50 PM OBSERVED AT EXPO#1 THAT ONE (1) SPLIT AC UNIT WAS INSTALLED, AND AT EXPO #3 THAT TWO (2) SPLIT AC UNITS WERE INSTALLED, ALL WITHOUT AN ELECTRICAL PERMIT FOR INSTALL AC . THE WORK IS 100% COMPLE$1K due
ECB07/09/2026ELECTRICAL WORK WITHOUT A PERMIT. OBSERVED HVAC UNIT INSTALLED AT EXPO 1 WITHOUT PERMITS ON FILE FOR SCOPE OF WORK DONE., OBTAIN PERMITHearing held — result not yet published$2K proposed
Primarily 2 family with 1 store or office · Owner of record: CORTELYOU REALTY LLC · 1,600 sf lot · 1.25 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.