← Back
Two stories - detached, small or mid-size
402 EAST 91 STREET
BROOKLYN · East Flatbush-Remsen Village · BIN 3101692
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R6Zoning
1,624 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,200 sf lot · 0.74 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalGeneral
Filed — no permit issued11p · 1 filing · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC201/17/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272201/17/2024
Building Lifecycle
All (7)Filed (2)Special Inspection (5)
01/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
01/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
01/19/2024
Special inspection requirement — Final
Walid Abdulla
01/19/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
01/19/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
01/17/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00964222-P1
12/14/2023
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00964222-I1
Nothing on file for this building.
2 projects · most recent 01/19/2024
General Wiring
FiledStatusContractorScope
01/19/2024CancelledSUNRUN SOLAR ELECTL CORP—
12/02/2020CompleteLINTECH ELECTRIC, INCGeneral Wiring
1 project · most recent 01/17/2024
FiledStatusContractorScope
01/17/2024——36 panels, 13.32 kw, 240 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/19/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
01/19/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
01/19/2024FinalWalid Abdullaprogress
01/19/2024Energy Code Compliance InspectionsWalid Abdullaprogress
01/19/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026B00964222-I1Request digital key ↗
08/26/2026B00964222-P1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature3
08/22/2026B00964222-I1Open ↗
08/22/2026B00964222-I1Open ↗
08/22/2026B00964222-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026B00964222-P1Open ↗
08/26/2026B00964222-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/22/2026B00964222-I1Open ↗
08/22/2026B00964222-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026B00964222-P1Open ↗
08/26/2026B00964222-I1Open ↗