Elevator apt, semi-fireproof with stores
8 Marcy
416 METROPOLITAN AVENUE · BIN 3429448
💬 Discuss this project
2022Year Built
8Stories
D7Building Class
M1-2/R6AZoning
105,726 sfGross Floor Area
125Units
LL97 CoveredRent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 416 METROPOLITAN AVE OWNER, L.L.C. · 17,586 sf lot · 6.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof6p · 5 filings · 20 docs
Floor 84p · 3 filings · 20 docs
Floor 74p · 3 filings · 20 docs
Floor 65p · 4 filings · 20 docs
Floor 53p · 3 filings · 20 docs
Floor 42p · 2 filings · 20 docs
Floor 33p · 3 filings · 20 docs
Floor 24p · 3 filings · 20 docs
Floor 13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PROSPECT DEVELOPERS II1107/08/2026
CPEOA, LIMITED PARTNERSHIP707/08/2026
RANCO CAPITAL2307/08/2026
OWNERS REP1403/22/2026
416 METROPOLITAN AVE OWNER, L.L.C.103/22/2026
VIBES ON ONE LLC203/22/2026
420 METRO903/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/26/2023$97.5M—420 METRO LLC → 416 METROPOLITAN AVE OWNER, L.L.C.$922/sf building
08/25/2020$19.0M—402 METROPOLITAN AVE LLC → 420 METRO LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION1803/21/2026
ADVANCED BUILDERS SERVICES1303/21/2026
AVALON DESIGN403/21/2026
A1 EXPEDITING SERVICE CORP.103/21/2026
PATUXENT ENGINEERING203/21/2026
CASA GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CORE SCAFFOLD SYSTEMS INC.General Contractor1203/21/2026
TARGET CONSTRUCTION LLCGeneral Contractor907/08/2026
TFK ELECTRIC CORPElectrical203/22/2026
CAPITAL CONCRETE NY INCGeneral Contractor107/08/2026
AMERICAN FIRE RESTORATIONGeneral Contractor107/08/2026
SUPERB CONSTRUCTION MGTGeneral Contractor107/08/2026
RIGHTWAY PLBG AND HTG INCFire Protection107/08/2026
ABR PLBG&HTG CONTR INCPlumbing107/08/2026
BEST MECHANICAL SVCS INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI AGENCY INC.254202/05/2025
METRIC CONSULTING AND INS1803103/11/2024
BIG APPLE GROUP NY A RMA91681105/15/2023
Building Lifecycle
All (136)Filed (28)Permit Issued (16)Signed Off (18)Violation (9)Inspection (11)Objection (24)Special Inspection (30)
01/20/2026
Signed off — Alteration
INSTALLATION OF NEW BOILER
B01142661-I1
02/11/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
MAURICIO ANDRADE
02/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
MAURICIO ANDRADE
02/06/2025
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
02/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
MAURICIO ANDRADE
02/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
02/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
02/05/2025
Filed — Alteration
INSTALLATION OF NEW BOILER
B01142661-P1
02/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
02/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
02/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
MAURICIO ANDRADE
02/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
MAURICIO ANDRADE
02/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
02/03/2025
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
01/22/2025
Permit issued — Boiler Equipment
B01142661-I1-BE
11/20/2024
Filed — Alteration
INSTALLATION OF NEW BOILER
B01142661-I1
08/17/2024
Violation issued (HPD, closed)
C
06/05/2024
Signed off — Alteration
B01018079-I1
03/18/2024
Permit issued — General Construction
B01018079-I1-GC
03/11/2024
Filed — Alteration
B01018079-I1
10/12/2023
Signed off — Alteration
8' plywood construction fence
B00375293-I1
08/28/2023
Signed off — Alteration
Mechanical work as per plans filed. In conjunction with NB# 321592718. No change to use, egress, or occupancy.
B00436216-I1
08/23/2023
Signed off — Alteration
Alt-GC application hereby filed for interior layout of a commercial space in a newly constructed eight (8) story mixed-use building.
B08031445-I1
08/21/2023
Signed off — Alteration
B00435918-I1
07/12/2023
Signed off — Alteration
Install temporary standpipe system as per plans filed. No change to use, egress oroccupancy. Filed in conjunction with NB# 321592718
B00440880-I1
06/22/2023
Signed off — Alteration
Install combined sprinkler/standpipe system as per plans filed. No change to use, egress oroccupancy. Filed in conjunction with NB#321592718.
B00436258-I1
05/16/2023
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
05/16/2023
Special inspection requirement — Final
Soorjbally Harilall
05/16/2023
Special inspection requirement — Interior lighting power
Soorjbally Harilall
05/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
05/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
05/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
05/15/2023
Filed — Alteration
Alt-GC application hereby filed for interior layout of a commercial space in a newly constructed eight (8) story mixed-use building.
B08031445-P1
05/11/2023
Special inspection requirement — Interior lighting power
Soorjbally Harilall
05/11/2023
Special inspection requirement — Final
Soorjbally Harilall
05/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
05/11/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
05/11/2023
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
05/11/2023
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
05/09/2023
Permit issued — General Construction
B08031445-I1-GC
02/16/2023
Signed off — Alteration
B08011932-I1
02/15/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/01/2023
Special inspection requirement — HVAC insulation and sealing
Soorjbally Harilall
02/01/2023
Special inspection requirement — HVAC and service water heating system controls
Soorjbally Harilall
02/01/2023
Special inspection requirement — Shutoff dampers
Soorjbally Harilall
02/01/2023
Special inspection requirement — Maintenance information
Soorjbally Harilall
02/01/2023
Special inspection requirement — HVAC and service water heating equipment
Soorjbally Harilall
02/01/2023
Special inspection requirement — Final
Soorjbally Harilall
01/23/2023
Filed — Alteration
Mechanical work as per plans filed. In conjunction with NB# 321592718. No change to use, egress, or occupancy.
B00436216-P2
01/05/2023
Filed — Alteration
Mechanical work as per plans filed. In conjunction with NB# 321592718. No change to use, egress, or occupancy.
B00436216-P1
01/05/2023
Signed off — Alteration
Install 12 ft. curb cut as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# 321592718
B00440501-I1
01/03/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00687590-I1
01/03/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00687585-I1
01/03/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00683356-I1
01/03/2023
Filed — Alteration
Install combined sprinkler/standpipe system as per plans filed. No change to use, egress oroccupancy. Filed in conjunction with NB#321592718.
B00436258-P1
01/03/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00687578-I1
01/03/2023
Permit issued — Standpipe
B00436258-I1-EW-SP
12/27/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/15/2022
Permit issued — General Construction
B08011932-I1-GC
Latest 60 of 136 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offABR PLBG&HTG CONTR INC01/22/2025
DOB NOWGeneral ConstructionSigned-offAMERICAN FIRE RESTORATION03/18/2024
DOB NOWGeneral ConstructionSigned-offTARGET CONSTRUCTION LLC05/09/2023
DOB NOWStandpipeSigned-offRIGHTWAY PLBG AND HTG INC01/03/2023
DOB NOWGeneral ConstructionSigned-offTARGET CONSTRUCTION LLC12/15/2022
DOB NOWCurb CutSigned-offTARGET CONSTRUCTION LLC12/14/2022
DOB NOWStructuralSigned-offTARGET CONSTRUCTION LLC06/15/2022
DOB NOWMechanical SystemsSigned-offTARGET CONSTRUCTION LLC05/16/2022
DOB NOWProtection and Mechanical MethodsSigned-offCAPITAL CONCRETE NY INC03/25/2022
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC03/16/2022
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC03/04/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC02/28/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC02/28/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC02/22/2022
DOB NOWConstruction FenceSigned-offTARGET CONSTRUCTION LLC12/29/2021
DOB NOWConstruction FenceSigned-offSUPERB CONSTRUCTION MGT05/25/2021
BIS—ISSUEDTARGET CONSTRUCTION LLC03/07/2022
BIS—ISSUEDTARGET CONSTRUCTION LLC11/08/2021
7 projects · most recent 10/10/2023
General Wiring
FiledStatusContractorScope
10/10/2023CompleteTFK ELECTRIC CORPGeneral Wiring
05/29/2023CompleteNET POWER ELECTRIC CORPGeneral Wiring
03/24/2022CompleteTFK ELECTRIC CORP—
02/19/2022CompleteV. VASS ELECTRIC CORP—
02/11/2022CompleteSTAR ELEC'L CONTRACTORS C—
11/25/2021CompletePOWER DIRECT ELECTRIC INC1 meters, 1 new_meters
06/24/2021CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
02/11/2025Pass-Final Boiler Equipment InspectionPassView ↗
02/15/2023Pass-Final General Construction Non-Directive 14PassView ↗
12/27/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
12/09/2022Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
12/09/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/07/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/06/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
08/26/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/01/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 83
DateRequirementInspectorRole
02/06/2025HVAC-R and service water heating equipmentMAURICIO ANDRADEenergy_progress
02/06/2025HVAC-R and service water heating system controlsMAURICIO ANDRADEenergy_progress
02/06/2025Tenant Protection Plan ComplianceMAURICIO ANDRADEspecial
02/06/2025Heating SystemsMAURICIO ANDRADEspecial
02/06/2025Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
02/06/2025HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
02/03/2025Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
02/03/2025Tenant Protection Plan Compliance—special
02/03/2025HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
02/03/2025HVAC-R and service water heating equipmentMAURICIO ANDRADEenergy_progress
02/03/2025HVAC-R and service water heating system controlsMAURICIO ANDRADEenergy_progress
02/03/2025Heating SystemsMAURICIO ANDRADEspecial
05/16/2023Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
05/16/2023Energy Code Compliance InspectionsSoorjbally Harilallprogress
05/16/2023FinalSoorjbally Harilallprogress
05/16/2023Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
05/16/2023HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
05/16/2023Interior lighting powerSoorjbally Harilallenergy_progress
05/11/2023Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
05/11/2023Energy Code Compliance InspectionsSoorjbally Harilallprogress
05/11/2023Interior lighting powerSoorjbally Harilallenergy_progress
05/11/2023Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
05/11/2023HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
05/11/2023FinalSoorjbally Harilallprogress
02/01/2023HVAC and service water heating system controls Soorjbally Harilallenergy_progress
Latest 25 of 83.
▾Documents — 334 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch16
09/01/2026B00545835-I1Request digital key ↗
09/01/2026B00551849-I1Request digital key ↗
08/31/2026B00683356-P2Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/02/2026B00436216-P2Request digital key ↗
09/01/2026B00436216-I1Request digital key ↗
08/15/2026B00436216-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe3
09/02/2026B00436258-P1Request digital key ↗
09/01/2026B00436258-I1Request digital key ↗
08/15/2026B00440880-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00435918-I1Request digital key ↗
08/15/2026B00435918-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00436258-P1Request digital key ↗
09/01/2026B00436258-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut2
08/28/2026B00440501-I1Request digital key ↗
08/15/2026B00440501-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/02/2026B00375293-P1Request digital key ↗
08/14/2026B00375293-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00435878-I1Request digital key ↗
▸Applications & Permits40
▸BISPLAN / WORK APPROVAL APPLICATION24
03/13/2023321592718Open ↗
03/03/2023321592718Open ↗
03/02/2023321592718Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit8
09/02/2026B00435878-I1Open ↗
08/13/2026B08031445-I1Open ↗
08/13/2026B08011932-I1Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION4
03/25/2022321592718Open ↗
03/07/2022321592718Open ↗
11/22/2021321592718Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/17/2022321592718Open ↗
▸BISHPD: PERMIT NOTICE1
02/12/2024321592718Open ↗
▸BISADD HPD PERMIT NOTICE PRIOR TO PERMIT1
03/16/2023321592718Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
09/15/2021340811214Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISZONING EXHIBIT V: CERTIFICATION1
02/17/2021321592718Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/17/2021321592718Open ↗
▸BISVERIFY TAX LOT1
12/05/2022321592718Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
04/01/2021321592718Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/29/2022321592718Open ↗
▸BISZONING DIAGRAM1
05/06/2021321592718Open ↗
▸BISZONING EXHIBIT IV: CERTIFICATION1
02/17/2021321592718Open ↗
▸BISZONING EXHIBIT II: CERTIFICATION1
02/17/2021321592718Open ↗
▸Seals & Professional Certifications77
▸DOB NOWDPL-1: Design Professional Seal & Signature29
09/02/2026B00435918-P1Open ↗
09/02/2026B00435918-I1Open ↗
09/02/2026B00436216-P2Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/23/2026B01142661-I1Open ↗
09/03/2026B00435918-P1Open ↗
09/03/2026B00435918-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/23/2026B01142661-I1Open ↗
09/23/2026B00440880-I1Open ↗
09/23/2026B01142661-I1Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/25/2022321592718Open ↗
11/08/2021321592718Open ↗
11/08/2021321592718Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/17/2021340811214Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/18/2021340811214Open ↗
▸Trade Schedules & Equipment9
▸BISFA - FDNY APPROVAL : FD-FAA2
01/12/2023321592718Open ↗
09/14/2021321592718Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
12/14/2022321592718Open ↗
04/14/2021321592718Open ↗
▸BISADD STANDPIPE ALARM DRAWINGS & AI1REQUIRED PRIOR TO PERMITSEE DOC#04 - AI1 ACCEPTED 07/12/20211
—321592718Open ↗
▸BISADD STANDPIPE WORK PERMIT REQUIRED PRIORTO PERMIT. SEE DOC#04 - AI1 ACCEPTED07/12/20211
—321592718Open ↗
▸BISFIRE PROTECTION PLAN (FPP): FDNY APPROVAL1
01/03/2023321592718Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
04/14/2021321592718Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
12/14/2022321592718Open ↗
▸Safety & Tenant Protection29
▸DOB NOWHPD-1: Anti-Harassment Area Checklist14
09/02/2026B00435878-I1Open ↗
08/15/2026B00440880-I1Open ↗
08/13/2026B08031445-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWCertificate of No Harassment8
09/02/2026B00435878-I1Open ↗
08/13/2026B00436216-I1Open ↗
08/13/2026B01018079-I1Open ↗
Showing 3 of 8 on file for this type
▸BISSTREET TREE CHECKLIST3
06/08/2021340811214Open ↗
04/01/2021321592718Open ↗
12/22/2020321592718Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/18/2021340811214Open ↗
▸BISSTREET TREE SIGNOFF1
12/29/2022321592718Open ↗
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
02/12/2024321592718Open ↗
▸BISANTI-HARASSMENT AREA CHECKLIST1
04/01/2021321592718Open ↗
▸Environmental & Asbestos16
▸DOB NOWOER: Notice to Proceed6
09/02/2026B00435878-I1Open ↗
08/13/2026B08011932-I1Open ↗
08/13/2026B08031445-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
09/02/2026B00435878-I1Open ↗
08/13/2026B00435918-I1Open ↗
08/13/2026B08011932-I1Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
05/18/2021340811214Open ↗
02/22/2021321592718Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
05/05/2023321592718Open ↗
▸BISOER NNO-TCO1
03/14/2023321592718Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY14
01/31/2023321592718Open ↗
01/31/2023321592718Open ↗
01/31/2023321592718Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
11/08/2021321592718Open ↗
11/08/2021321592718Open ↗
11/08/2021321592718Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00435918-I1Open ↗
08/13/2026B00436216-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/31/2023321592718Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
01/10/2023321592718Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B01142661-I1Open ↗
▸Inspections & Test Reports31
▸BISTECHNICAL REPORT: RESPONSIBILITY21
03/17/2023321592718Open ↗
03/17/2023321592718Open ↗
03/17/2023321592718Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
03/17/2022321592718Open ↗
01/03/2022321592718Open ↗
11/08/2021321592718Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
10/07/2021321592718Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
03/07/2022321592718Open ↗
▸BISHYDRO FLOW TEST LETTER1
04/14/2021321592718Open ↗
▸BISSOIL REPORT1
04/01/2021321592718Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
11/08/2021321592718Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
04/01/2021321592718Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
04/14/2021321592718Open ↗
▸Approvals, Objections & Sign-offs26
▸BISLETTERS - SUPPORTING DOCUMENTATION12
02/13/2024321592718Open ↗
01/02/2024321592718Open ↗
03/20/2023321592718Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE12
03/03/2023321592718Open ↗
03/02/2023321592718Open ↗
03/01/2023321592718Open ↗
Showing 3 of 12 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
09/14/2021321592718Open ↗
▸BISHPD: INCLUSIONARY HOUSING LETTER1
04/01/2021321592718Open ↗
▸Cost, Insurance & Ownership1
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
11/08/2021321592718Open ↗
▸Filing & Intake Forms22
▸BISADDITIONAL INFORMATION18
03/17/2023321592718Open ↗
03/17/2023321592718Open ↗
03/14/2023321592718Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING COVER SHEET2
08/17/2020321592718Open ↗
08/17/2020321592718Open ↗
▸BISBOROUGH INTAKE FORM1
11/08/2021321592718Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/17/2021340811214Open ↗
▸Other Documents20
▸DOB NOWMultiple Dwelling Special District Notice to Community Board7
08/15/2026B00440880-I1Open ↗
08/13/2026B00436258-P1Open ↗
08/13/2026B00435918-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation7
08/15/2026B00440880-I1Open ↗
08/13/2026B00440501-I1Open ↗
08/13/2026B00435918-P1Open ↗
Showing 3 of 7 on file for this type
▸BISSUSTAINABLE ROOF ZONE FORM1
04/14/2021321592718Open ↗
▸BIS* HPD: INCLUSIONARY HOUSING ELIG. CERT1
07/03/2023321592718Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
06/08/2021340811214Open ↗
▸BISPRE-CONSTRUCTION SURVEY1
09/15/2021321592718Open ↗
▸BISPLOT DIAGRAM1
07/23/2021321592718Open ↗
▸BISUNDERPINNING1
12/10/2021321592718Open ↗