BuildNYC
Elevator apt, semi-fireproof with stores
8 Marcy
402 METROPOLITAN AVENUE · BIN 3429448
💬 Discuss this project
2022Year Built
8Stories
D7Building Class
M1-2/R6AZoning
105,726 sfGross Floor Area
125Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 416 Metropolitan Ave Owner · 17,586 sf lot · 6.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsRanco Capital LLC7 filings
RoofJudith Drive LLC1p · 2 filings · 14 docs
Floor 3Unit 3D, Unit 3E, Unit 3F1p · 1 filing · 5 docs
Floor 2Unit 2D, Unit 2E, Unit 2F1 filing · 5 docs
Floor 1Express Health3 filings · 20 docs
Site & exteriorCpeoa, Limited Partnership6 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Ranco Capital2307/08/2026
Prospect Developers II1107/08/2026
420 Metro903/21/2026
Cpeoa, Limited Partnership707/08/2026
Vibes on One203/22/2026
416 Metropolitan Ave Owner103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/26/2023$97.5M—420 METRO LLC → 416 METROPOLITAN AVE OWNER, L.L.C.$922/sf building
08/25/2020$19.0M—402 METROPOLITAN AVE LLC → 420 METRO LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cpengineering202/05/2025
Michael Muroff Architect103/11/2024
Bild Architecture205/15/2023
New York & Company801/23/2023
Kutnicki Bernstein Architects310/25/2022
Paul Perdek, Prof. Engineering903/28/2022
Patuxent Engineering103/24/2022
WSP101/07/2021
Aryeh Siegel Architect208/05/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution1803/21/2026
Advanced Builders Services1303/21/2026
Avalon Design403/21/2026
Milrose Consultants103/21/2026
Patuxent Engineering203/21/2026
Casa Group403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Core Scaffold SystemsScaffold1203/21/2026
Target ConstructionGeneral Contractor807/08/2026
TFK ElectricElectrical203/22/2026
Superb Construction ManagementScaffold107/08/2026
Target ConstructionScaffold107/08/2026
Abr Plumbing & Heating ContractingPlumbing107/08/2026
Best Mechanical ServicesPlumbing107/08/2026
Rightway Plumbing and HeatingFire Protection107/08/2026
American Fire Restorationspecialty_contractor107/08/2026
Capital Concrete NYScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI Agency254202/05/2025
Metric Consulting and Ins1803103/11/2024
Big Apple Group NY A Rma91681105/15/2023
Building Lifecycle
All (135)Filed (28)Permit Issued (16)Signed Off (18)Violation (9)Inspection (10)Objection (24)Special Inspection (30)
01/20/2026
Signed off — Alteration
INSTALLATION OF NEW BOILER
B01142661-I1
02/11/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
MAURICIO ANDRADE
02/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
MAURICIO ANDRADE
02/06/2025
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
02/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
MAURICIO ANDRADE
02/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
02/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
02/05/2025
Filed — Alteration
INSTALLATION OF NEW BOILER
B01142661-P1
02/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
02/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
02/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
MAURICIO ANDRADE
02/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
MAURICIO ANDRADE
02/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
02/03/2025
Special inspection requirement — Heating Systems
MAURICIO ANDRADE
01/22/2025
Permit issued — Boiler Equipment
B01142661-I1-BE
11/20/2024
Filed — Alteration
INSTALLATION OF NEW BOILER
B01142661-I1
08/17/2024
Violation issued (HPD, closed)
C
06/05/2024
Signed off — Alteration
B01018079-I1
03/18/2024
Permit issued — General Construction
B01018079-I1-GC
03/11/2024
Filed — Alteration
B01018079-I1
10/12/2023
Signed off — Alteration
8' plywood construction fence
B00375293-I1
08/28/2023
Signed off — Alteration
Mechanical work as per plans filed. In conjunction with NB# 321592718. No change to use, egress, or occupancy.
B00436216-I1
08/23/2023
Signed off — Alteration
Alt-GC application hereby filed for interior layout of a commercial space in a newly constructed eight (8) story mixed-use building.
B08031445-I1
08/21/2023
Signed off — Alteration
B00435918-I1
07/12/2023
Signed off — Alteration
Install temporary standpipe system as per plans filed. No change to use, egress oroccupancy. Filed in conjunction with NB# 321592718
B00440880-I1
06/22/2023
Signed off — Alteration
Install combined sprinkler/standpipe system as per plans filed. No change to use, egress oroccupancy. Filed in conjunction with NB#321592718.
B00436258-I1
05/16/2023
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
05/16/2023
Special inspection requirement — Final
Soorjbally Harilall
05/16/2023
Special inspection requirement — Interior lighting power
Soorjbally Harilall
05/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
05/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
05/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
05/15/2023
Filed — Alteration
Alt-GC application hereby filed for interior layout of a commercial space in a newly constructed eight (8) story mixed-use building.
B08031445-P1
05/11/2023
Special inspection requirement — Interior lighting power
Soorjbally Harilall
05/11/2023
Special inspection requirement — Final
Soorjbally Harilall
05/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
05/11/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Soorjbally Harilall
05/11/2023
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
05/11/2023
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
05/09/2023
Permit issued — General Construction
B08031445-I1-GC
02/16/2023
Signed off — Alteration
B08011932-I1
02/01/2023
Special inspection requirement — HVAC insulation and sealing
Soorjbally Harilall
02/01/2023
Special inspection requirement — HVAC and service water heating system controls
Soorjbally Harilall
02/01/2023
Special inspection requirement — Shutoff dampers
Soorjbally Harilall
02/01/2023
Special inspection requirement — Maintenance information
Soorjbally Harilall
02/01/2023
Special inspection requirement — HVAC and service water heating equipment
Soorjbally Harilall
02/01/2023
Special inspection requirement — Final
Soorjbally Harilall
01/23/2023
Filed — Alteration
Mechanical work as per plans filed. In conjunction with NB# 321592718. No change to use, egress, or occupancy.
B00436216-P2
01/05/2023
Filed — Alteration
Mechanical work as per plans filed. In conjunction with NB# 321592718. No change to use, egress, or occupancy.
B00436216-P1
01/05/2023
Signed off — Alteration
Install 12 ft. curb cut as per plans filed. No change to use, egress or occupancy. Filed in conjunction with NB# 321592718
B00440501-I1
01/03/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00687590-I1
01/03/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00687585-I1
01/03/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00683356-I1
01/03/2023
Filed — Alteration
Install combined sprinkler/standpipe system as per plans filed. No change to use, egress oroccupancy. Filed in conjunction with NB#321592718.
B00436258-P1
01/03/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00687578-I1
01/03/2023
Permit issued — Standpipe
B00436258-I1-EW-SP
12/27/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/15/2022
Permit issued — General Construction
B08011932-I1-GC
12/14/2022
Permit issued — Curb Cut
B00440501-I1-CC
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offAbr Plumbing & Heating Contracting01/22/2025
DOB NOWGeneral ConstructionSigned-offAmerican Fire Restoration03/18/2024
DOB NOWGeneral ConstructionSigned-offTarget Construction05/09/2023
DOB NOWSprinklersSigned-offRightway Plumbing and Heating01/03/2023
DOB NOWGeneral ConstructionSigned-offTarget Construction12/15/2022
DOB NOWCurb CutSigned-offTarget Construction12/14/2022
DOB NOWStructuralSigned-offTarget Construction06/15/2022
DOB NOWMechanical SystemsSigned-offTarget Construction05/16/2022
DOB NOWProtection and Mechanical MethodsSigned-offCapital Concrete NY03/25/2022
DOB NOWPlumbingSigned-offBest Mechanical Services03/16/2022
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems03/04/2022
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems02/28/2022
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems02/28/2022
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems02/22/2022
DOB NOWConstruction FenceSigned-offTarget Construction12/29/2021
DOB NOWConstruction FenceSigned-offSuperb Construction Management05/25/2021
BIS—ISSUEDTarget Construction03/07/2022
BIS—ISSUEDTarget Construction11/08/2021
7 projects · most recent 10/10/2023
General Wiring
FiledStatusContractorScope
10/10/2023CompleteTFK ElectricGeneral Wiring
05/29/2023CompleteNet Power ElectricGeneral Wiring
03/24/2022CompleteTFK Electric—
02/19/2022CompleteV. Vass Electric—
02/11/2022CompleteStar Electrical Contractors—
11/25/2021CompletePower Direct Electric1 meters, 1 new_meters
06/24/2021CompleteV. Vass Electric—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
02/11/2025Pass-Final Boiler Equipment InspectionPassView ↗
12/27/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
12/09/2022Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
12/09/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/07/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/06/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
08/26/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/01/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 83
DateRequirementInspectorRole
02/06/2025HVAC-R and service water heating equipmentMAURICIO ANDRADEenergy_progress
02/06/2025HVAC-R and service water heating system controlsMAURICIO ANDRADEenergy_progress
02/06/2025Tenant Protection Plan ComplianceMAURICIO ANDRADEspecial
02/06/2025Heating SystemsMAURICIO ANDRADEspecial
02/06/2025Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
02/06/2025HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
02/03/2025Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
02/03/2025Tenant Protection Plan Compliance—special
02/03/2025HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
02/03/2025HVAC-R and service water heating equipmentMAURICIO ANDRADEenergy_progress
02/03/2025HVAC-R and service water heating system controlsMAURICIO ANDRADEenergy_progress
02/03/2025Heating SystemsMAURICIO ANDRADEspecial
05/16/2023Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
05/16/2023Energy Code Compliance InspectionsSoorjbally Harilallprogress
05/16/2023FinalSoorjbally Harilallprogress
05/16/2023Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
05/16/2023HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
05/16/2023Interior lighting powerSoorjbally Harilallenergy_progress
05/11/2023Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
05/11/2023Energy Code Compliance InspectionsSoorjbally Harilallprogress
05/11/2023Interior lighting powerSoorjbally Harilallenergy_progress
05/11/2023Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
05/11/2023HVAC-R and service water piping design and insulationSoorjbally Harilallenergy_progress
05/11/2023FinalSoorjbally Harilallprogress
02/01/2023HVAC and service water heating system controls Soorjbally Harilallenergy_progress
Latest 25 of 83.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Express HealthMedical / HealthcareFloor 1
Project B08031445 Alteration · LOC Issued · 11/04/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 334 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch16
09/01/2026B00545835-I1Request digital key ↗
09/01/2026B00551849-I1Request digital key ↗
08/31/2026B00683356-P2Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/02/2026B00436216-P2Request digital key ↗
09/01/2026B00436216-I1Request digital key ↗
08/15/2026B00436216-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe3
09/02/2026B00436258-P1Request digital key ↗
09/01/2026B00436258-I1Request digital key ↗
08/15/2026B00440880-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00435918-I1Request digital key ↗
08/15/2026B00435918-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00436258-P1Request digital key ↗
09/01/2026B00436258-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut2
08/28/2026B00440501-I1Request digital key ↗
08/15/2026B00440501-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/02/2026B00375293-P1Request digital key ↗
08/14/2026B00375293-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00435878-I1Request digital key ↗
▸Applications & Permits40
▸BISPLAN / WORK APPROVAL APPLICATION24
03/13/2023321592718Open ↗
03/03/2023321592718Open ↗
03/02/2023321592718Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit8
09/02/2026B00435878-I1Open ↗
08/13/2026B08031445-I1Open ↗
08/13/2026B08011932-I1Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION4
03/25/2022321592718Open ↗
03/07/2022321592718Open ↗
11/22/2021321592718Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/17/2022321592718Open ↗
▸BISHPD: PERMIT NOTICE1
02/12/2024321592718Open ↗
▸BISADD HPD PERMIT NOTICE PRIOR TO PERMIT1
03/16/2023321592718Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
09/15/2021340811214Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISZONING EXHIBIT V: CERTIFICATION1
02/17/2021321592718Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/17/2021321592718Open ↗
▸BISVERIFY TAX LOT1
12/05/2022321592718Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
04/01/2021321592718Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/29/2022321592718Open ↗
▸BISZONING DIAGRAM1
05/06/2021321592718Open ↗
▸BISZONING EXHIBIT IV: CERTIFICATION1
02/17/2021321592718Open ↗
▸BISZONING EXHIBIT II: CERTIFICATION1
02/17/2021321592718Open ↗
▸Seals & Professional Certifications77
▸DOB NOWDPL-1: Design Professional Seal & Signature29
09/02/2026B00435918-I1Open ↗
09/02/2026B00435918-P1Open ↗
09/02/2026B00436216-P1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/23/2026B01142661-I1Open ↗
09/03/2026B00435918-P1Open ↗
09/03/2026B00435918-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/23/2026B01142661-I1Open ↗
09/23/2026B01142661-I1Open ↗
09/23/2026B00440880-I1Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/25/2022321592718Open ↗
11/08/2021321592718Open ↗
11/08/2021321592718Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/17/2021340811214Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/18/2021340811214Open ↗
▸Trade Schedules & Equipment9
▸BISFA - FDNY APPROVAL : FD-FAA2
01/12/2023321592718Open ↗
09/14/2021321592718Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
12/14/2022321592718Open ↗
04/14/2021321592718Open ↗
▸BISADD STANDPIPE ALARM DRAWINGS & AI1REQUIRED PRIOR TO PERMITSEE DOC#04 - AI1 ACCEPTED 07/12/20211
—321592718Open ↗
▸BISADD STANDPIPE WORK PERMIT REQUIRED PRIORTO PERMIT. SEE DOC#04 - AI1 ACCEPTED07/12/20211
—321592718Open ↗
▸BISFIRE PROTECTION PLAN (FPP): FDNY APPROVAL1
01/03/2023321592718Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
04/14/2021321592718Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
12/14/2022321592718Open ↗
▸Safety & Tenant Protection29
▸DOB NOWHPD-1: Anti-Harassment Area Checklist14
09/02/2026B00435878-I1Open ↗
08/15/2026B00440880-I1Open ↗
08/13/2026B08031445-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWCertificate of No Harassment8
09/02/2026B00435878-I1Open ↗
08/13/2026B00436216-I1Open ↗
08/13/2026B01018079-I1Open ↗
Showing 3 of 8 on file for this type
▸BISSTREET TREE CHECKLIST3
06/08/2021340811214Open ↗
04/01/2021321592718Open ↗
12/22/2020321592718Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/18/2021340811214Open ↗
▸BISSTREET TREE SIGNOFF1
12/29/2022321592718Open ↗
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
02/12/2024321592718Open ↗
▸BISANTI-HARASSMENT AREA CHECKLIST1
04/01/2021321592718Open ↗
▸Environmental & Asbestos16
▸DOB NOWOER: Notice to Proceed6
09/02/2026B00435878-I1Open ↗
08/13/2026B08011932-I1Open ↗
08/13/2026B08031445-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
09/02/2026B00435878-I1Open ↗
08/13/2026B00435918-I1Open ↗
08/13/2026B08011932-I1Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
05/18/2021340811214Open ↗
02/22/2021321592718Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
05/05/2023321592718Open ↗
▸BISOER NNO-TCO1
03/14/2023321592718Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY14
01/31/2023321592718Open ↗
01/31/2023321592718Open ↗
01/31/2023321592718Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
11/08/2021321592718Open ↗
11/08/2021321592718Open ↗
11/08/2021321592718Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00435918-I1Open ↗
08/13/2026B00436216-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/31/2023321592718Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
01/10/2023321592718Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B01142661-I1Open ↗
▸Inspections & Test Reports31
▸BISTECHNICAL REPORT: RESPONSIBILITY21
03/17/2023321592718Open ↗
03/17/2023321592718Open ↗
03/17/2023321592718Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
03/17/2022321592718Open ↗
01/03/2022321592718Open ↗
11/08/2021321592718Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
10/07/2021321592718Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
03/07/2022321592718Open ↗
▸BISHYDRO FLOW TEST LETTER1
04/14/2021321592718Open ↗
▸BISSOIL REPORT1
04/01/2021321592718Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
11/08/2021321592718Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
04/01/2021321592718Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
04/14/2021321592718Open ↗
▸Approvals, Objections & Sign-offs26
▸BISLETTERS - SUPPORTING DOCUMENTATION12
02/13/2024321592718Open ↗
01/02/2024321592718Open ↗
03/20/2023321592718Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE12
03/03/2023321592718Open ↗
03/02/2023321592718Open ↗
03/01/2023321592718Open ↗
Showing 3 of 12 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
09/14/2021321592718Open ↗
▸BISHPD: INCLUSIONARY HOUSING LETTER1
04/01/2021321592718Open ↗
▸Cost, Insurance & Ownership1
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
11/08/2021321592718Open ↗
▸Filing & Intake Forms22
▸BISADDITIONAL INFORMATION18
03/17/2023321592718Open ↗
03/17/2023321592718Open ↗
03/14/2023321592718Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING COVER SHEET2
08/17/2020321592718Open ↗
08/17/2020321592718Open ↗
▸BISBOROUGH INTAKE FORM1
11/08/2021321592718Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/17/2021340811214Open ↗
▸Other Documents20
▸DOB NOWMultiple Dwelling Special District Notice to Community Board7
08/15/2026B00440880-I1Open ↗
08/13/2026B00436258-P1Open ↗
08/13/2026B00435918-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation7
08/15/2026B00440880-I1Open ↗
08/13/2026B00440501-I1Open ↗
08/13/2026B00435918-P1Open ↗
Showing 3 of 7 on file for this type
▸BISSUSTAINABLE ROOF ZONE FORM1
04/14/2021321592718Open ↗
▸BIS* HPD: INCLUSIONARY HOUSING ELIG. CERT1
07/03/2023321592718Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
06/08/2021340811214Open ↗
▸BISPRE-CONSTRUCTION SURVEY1
09/15/2021321592718Open ↗
▸BISPLOT DIAGRAM1
07/23/2021321592718Open ↗
▸BISUNDERPINNING1
12/10/2021321592718Open ↗