← Back
Primarily 5-6 family with 1 store or office
402 ST MARKS PLACE
STATEN ISLAND · BIN 5175464
💬 Discuss this project
2022Year Built
4Stories
S5Building Class
C4-2Zoning
5,067 sfGross Floor Area
6Units
Rent Stabilized16 Open Violations ▸FDNY Report ↗
Primarily 5-6 family with 1 store or office · Owner of record: 402 ST. MARKS PLACE PARTNERS, LLC · 2,125 sf lot · 2.38 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof2p · 2 filings · 16 docs
Floor 22p · 2 filings · 18 docs
Floor 1
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AVC GENERAL CONTRACTING6509/21/2026
YONA LOVE CONSULTING SERVICES607/08/2026
DORIA, INC603/22/2026
CONTRACTING INC AVC GENER103/22/2026
402 ST.MARKS PLACE PARTNE103/22/2026
402 ST MARKS PLACE303/21/2026
402 ST MARKS PLACE PARTNERS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS2603/21/2026
A1 EXPEDITING SERVICE803/21/2026
KC EXPEDITING403/21/2026
4444 PPPP CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AVC GENERAL CONTRACTING LGeneral Contractor1707/08/2026
YARKS NYC INCGeneral Contractor1407/08/2026
DORIA, INCGeneral Contractor203/21/2026
DRILON PLBG & HTG INCPlumbing207/08/2026
BIG APPLE AIR INCGeneral Contractor104/09/2026
EXPERT FIRE SPRINKLER,LLCFire Protection107/08/2026
NEW YORK STANDARD MECH COFire Protection107/08/2026
R.C.M. ELECTRIC CORP.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OUTER BOROUGH ENGINEERING9907107/17/2026
MTD GROUP INSPECTIONS,INC9388101/26/2023
SKYLINE RIGGING7880101/24/2023
A TECH ENGINEERING NYC, P6738411/17/2022
MARKANICS CORP4600104/19/2022
DOYUN KIM; RA7415204/19/2022
WORLD DESIGN ARCHITECTURE9323102/16/2022
Building Lifecycle
All (124)Filed (23)Permit Issued (23)Signed Off (11)Violation (33)Inspection (7)Special Inspection (27)
07/17/2026
Filed — Alteration
Filing Existing Ductless Mini Split Air conditioning
S01432268-I1
07/16/2026
Special inspection requirement — Final
PHILIP HOLLNSTEINER
07/16/2026
Special inspection requirement — Mechanical Systems
PHILIP HOLLNSTEINER
04/02/2026
Violation issued (FDNY_NOV, closed)
03/05/2026
Signed off — Alteration
COMMERCIAL INTERIOR FIT-OUT AND INSTALLATION OF DUCTLESS A/C SYSTEM; INSTALLATION OF KITCHEN EXHAUST HOOD AND BLOWER IN CELLAR ALONG WITH RELATED DUCT WORK
S00716932-S1
05/15/2025
Signed off — Alteration
SUPPORT OF EXCAVATION AS PER DRAWINGS
S00640550-I1
05/15/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AT ADJACENT PROPERTIES DURING NEW BLDG CONST, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
S00660253-I1
04/22/2025
Signed off — Alteration
APPLICATION FILED HEREWITH TO INSTALL (6) NEW HVAC UNITS AT MIXED USE BUILDING.
S00682042-I1
04/22/2025
Permit issued — General Construction
S00716932-S1-GC
04/22/2025
Permit issued — General Construction
S00716932-S1-MS
03/12/2025
Signed off — Alteration
APPLICATION FILED HEREWITH IN CONJUNCTION WITH BIS NB APPLICATION TO INSTALL SPRINKLERS SYSTEM THROUGHOUT MIXED USE BUILDING.
S00681914-I1
03/12/2025
Signed off — Alteration
APPLICATION FILED HEREWITH FOR ALL PLUMBING WORK TO BE DONE IN CONJUNCTION WITH BIS NB APPLICATION # 540188447.
S00681175-I1
02/05/2025
Violation issued (ECB, closed)
Construction
10/17/2024
Violation issued (ECB, closed)
Boilers
08/13/2024
Permit issued — Sprinklers
S00681914-I1-EW-SP
05/13/2024
Filed — Alteration
APPLICATION FILED HEREWITH FOR ALL PLUMBING WORK TO BE DONE IN CONJUNCTION WITH BIS NB APPLICATION # 540188447.
S00681175-P7
03/05/2024
Filed — Alteration
APPLICATION FILED HEREWITH FOR ALL PLUMBING WORK TO BE DONE IN CONJUNCTION WITH BIS NB APPLICATION # 540188447.
S00681175-P6
01/04/2024
Signed off — Alteration
S00354711-I1
11/08/2023
Signed off — Alteration
INSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
S00813353-I1
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/17/2023
Filed — Alteration
APPLICATION FILED HEREWITH FOR ALL PLUMBING WORK TO BE DONE IN CONJUNCTION WITH BIS NB APPLICATION # 540188447.
S00681175-P5
09/13/2023
Signed off — Alteration
COMMERCIAL INTERIOR FIT-OUT AND INSTALLATION OF DUCTLESS A/C SYSTEM; INSTALLATION OF KITCHEN EXHAUST HOOD AND BLOWER IN CELLAR ALONG WITH RELATED DUCT WORK
S00716932-I1
09/06/2023
Permit issued — Plumbing
S00681175-I1-PL
09/05/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/14/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/06/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/21/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/30/2023
Permit issued — General Construction
S00716932-I1-GC-CX
03/08/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
S00777935-I1
03/08/2023
Signed off — Alteration
S00660224-I1
03/02/2023
Permit issued — Sidewalk Shed
S00660224-I1-SH
03/02/2023
Permit issued — Protection and Mechanical Methods
S00660253-I1-PM
02/27/2023
Violation issued (ECB, closed)
Construction
02/17/2023
Filed — Alteration
COMMERCIAL INTERIOR FIT-OUT AND INSTALLATION OF DUCTLESS A/C SYSTEM; INSTALLATION OF KITCHEN EXHAUST HOOD AND BLOWER IN CELLAR ALONG WITH RELATED DUCT WORK
S00716932-P1
02/17/2023
Special inspection requirement — Final
02/17/2023
Special inspection requirement — Mechanical Systems
Tommaso Di Gesaro
02/17/2023
Special inspection requirement — Final
MICHAEL DERUVO
02/17/2023
Special inspection requirement — Mechanical Systems
02/16/2023
Violation issued (ECB, closed)
Construction
02/15/2023
Permit issued — Supported Scaffold
S00777935-I1-SF
02/13/2023
Violation issued (ECB, closed)
Construction
02/13/2023
Violation issued (ECB, closed)
Construction
02/13/2023
Violation issued (ECB, closed)
Cranes and Derricks
02/13/2023
Violation issued (ECB, closed)
Construction
02/13/2023
Violation issued (ECB, closed)
Construction
02/02/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
01/31/2023
Permit issued — Construction Fence
S00354711-I1-FN
01/30/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/27/2023
Filed — Alteration
APPLICATION FILED HEREWITH FOR ALL PLUMBING WORK TO BE DONE IN CONJUNCTION WITH BIS NB APPLICATION # 540188447.
S00681175-P4
01/26/2023
Filed — Alteration
COMMERCIAL INTERIOR FIT-OUT AND INSTALLATION OF DUCTLESS A/C SYSTEM; INSTALLATION OF KITCHEN EXHAUST HOOD AND BLOWER IN CELLAR ALONG WITH RELATED DUCT WORK
S00716932-S1
01/24/2023
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLDING AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
S00813353-I1
01/24/2023
Permit issued — Protection and Mechanical Methods
S00813353-I1-PMM
01/23/2023
Special inspection requirement — Preliminary
ZELJKO STEVANOVIC
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAVC GENERAL CONTRACTING L04/22/2025
DOB NOWGeneral ConstructionSigned-offBIG APPLE AIR04/22/2025
DOB NOWSprinklersSigned-offEXPERT FIRE SPRINKLER,LLC08/13/2024
DOB NOWPlumbingSigned-offDRILON PLBG & HTG INC09/06/2023
DOB NOWGeneral ConstructionSigned-offAVC GENERAL CONTRACTING L03/30/2023
DOB NOWSidewalk ShedSigned-offYARKS NYC INC03/02/2023
DOB NOWProtection and Mechanical MethodsSigned-offYARKS NYC INC03/02/2023
DOB NOWSupported ScaffoldSigned-offYARKS NYC INC02/15/2023
DOB NOWConstruction FenceSigned-offAVC GENERAL CONTRACTING L01/31/2023
DOB NOWProtection and Mechanical MethodsSigned-offDORIA, INC01/24/2023
DOB NOWSprinklersSigned-offNEW YORK STANDARD MECH CO09/29/2022
DOB NOWMechanical SystemsSigned-offAVC GENERAL CONTRACTING L09/19/2022
DOB NOWPlumbingSigned-offDRILON PLBG & HTG INC08/19/2022
DOB NOWSupported ScaffoldSigned-offYARKS NYC INC07/26/2022
DOB NOWSupport of ExcavationSigned-offAVC GENERAL CONTRACTING L04/28/2022
DOB NOWFoundationSigned-offAVC GENERAL CONTRACTING L04/28/2022
DOB NOWConstruction FenceSigned-offAVC GENERAL CONTRACTING L03/01/2022
DOB NOWProtection and Mechanical MethodsSigned-offYARKS NYC INC02/25/2022
DOB NOWSidewalk ShedSigned-offYARKS NYC INC02/22/2022
DOB NOWProtection and Mechanical MethodsSigned-offYARKS NYC INC01/20/2022
DOB NOWSidewalk ShedSigned-offYARKS NYC INC01/20/2022
DOB NOWConstruction FenceSigned-offAVC GENERAL CONTRACTING L01/12/2021
DOB NOWConstruction FenceSigned-offAVC GENERAL CONTRACTING L01/07/2021
BIS—ISSUEDAVC GENERAL CONTRACTING L11/07/2023
BIS—ISSUEDAVC GENERAL CONTRACTING L08/22/2023
BIS—ISSUEDAVC GENERAL CONTRACTING L11/04/2022
BIS—ISSUEDAVC GENERAL CONTRACTING L08/05/2022
BIS—ISSUEDAVC GENERAL CONTRACTING L11/07/2021
BIS—ISSUEDAVC GENERAL CONTRACTING L11/07/2021
BIS—ISSUEDAVC GENERAL CONTRACTING L09/20/2021
BIS—ISSUEDAVC GENERAL CONTRACTING L09/20/2021
1 job · most recent 07/17/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/17/2026——Air Conditioning Systems
Cooling
Cooper & Hunter #CH-HPR55M-230V0, #CH-60LCU/0, #CH-28MES-230VO, #CH-55MES-230VO, #CH-HYP19MSPH-230VO, #CH-HYP28MSPH-230VO, #CH-HYP28MSPH-230VO, #CH-HYP19MSPH-230VO, #CH-HYP19MSPH-230VO 19,000 BTU · Split System ×9
7 jobs · most recent 03/17/2026
General Wiring
FiledStatusContractorScope
03/17/2026CompleteR.C.M. ELECTRIC CORP.—
06/14/2025CompleteASCUATECH ELECTRICAL CORPGeneral Wiring
06/12/2025CompleteASCUATECH ELECTRICAL CORP9 meters, 9 new_meters
09/29/2023CompleteR.C.M. ELECTRIC CORP.—
03/03/2022CancelledISTRA ELEC'L CONTRS CORP9 meters, 9 new_meters
01/11/2022CompleteRICHARD NEU—
06/17/2021CompleteR.C.M. ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/05/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/14/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/06/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/02/2023Pass-Final PL - UndergroundPassView ↗
01/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
07/16/2026FinalPHILIP HOLLNSTEINERprogress
07/16/2026Mechanical SystemsPHILIP HOLLNSTEINERspecial
02/17/2023Final—progress
02/17/2023Mechanical SystemsTommaso Di Gesarospecial
02/17/2023FinalMICHAEL DERUVOprogress
02/17/2023Mechanical Systems—special
01/23/2023PreliminaryZELJKO STEVANOVICprogress
01/23/2023Post-installed AnchorsZELJKO STEVANOVICspecial
11/18/2022Sprinkler Systemsanthony santorospecial
11/17/2022Sprinkler Systemsanthony santorospecial
10/07/2022Sprinkler Systemsanthony santorospecial
04/12/2022Concrete - Cast-In-PlaceDOYUN KIMspecial
04/12/2022Excavations - Sheeting, Shoring, and BracingDOYUN KIMspecial
04/12/2022Fire-Resistant Penetrations and JointsDOYUN KIMspecial
04/12/2022MasonryDOYUN KIMspecial
04/12/2022Structural Cold-Formed SteelDOYUN KIMspecial
04/12/2022Structural Steel - High Strength BoltingDOYUN KIMspecial
04/12/2022Structural Steel - WeldingDOYUN KIMspecial
04/12/2022Subgrade InspectionsDOYUN KIMspecial
04/12/2022Subsurface Conditions – Fill Placement & In-Place DensityDOYUN KIMspecial
04/12/2022UnderpinningMalcolm Barkanspecial
04/12/2022Structural Steel - DetailsDOYUN KIMspecial
04/12/2022FinalDOYUN KIMprogress
04/12/2022Footing and FoundationDOYUN KIMprogress
04/12/2022Fire-Resistance Rated ConstructionDOYUN KIMprogress
Latest 25 of 27.
▾Documents — 183 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch22
08/25/2026S00640550-I1Request digital key ↗
08/24/2026S00660224-I1Request digital key ↗
08/24/2026S00660253-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026S00354711-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION13
11/20/2025520472113Open ↗
05/22/2025540188447Open ↗
05/16/2025540188447Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
08/09/2021540188447Open ↗
06/28/2021540188447Open ↗
06/28/2021540188447Open ↗
▸BISWORK PERMIT APPLICATION2
09/20/2021540188447Open ↗
09/20/2021540188447Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
05/03/2023540193315Open ↗
12/21/2020540193315Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/28/2021540188447Open ↗
▸BISVERIFY TAX LOT1
01/27/2025540188447Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/16/2025540188447Open ↗
▸BISZONING DIAGRAM1
08/19/2021540188447Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
07/28/2021540188447Open ↗
▸Seals & Professional Certifications41
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/25/2026S00640550-I1Open ↗
08/24/2026S00682042-I1Open ↗
08/23/2026S00681914-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/29/2026S00682042-I1Open ↗
08/29/2026S00716932-S1Open ↗
08/29/2026S00681914-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026S00682042-I1Open ↗
08/29/2026S00716932-S1Open ↗
08/24/2026S00716932-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/21/2020540193315Open ↗
12/18/2020540188447Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
01/29/2021540188447Open ↗
12/21/2020540193315Open ↗
▸Trade Schedules & Equipment4
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
03/12/2025540188447Open ↗
06/28/2021540188447Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
06/28/2021540188447Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
02/24/2026540188447Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
12/18/2020540188447Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/22/2024540188447Open ↗
09/16/2021540188447Open ↗
08/25/2021540188447Open ↗
Showing 3 of 4 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
08/22/2024540188447Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
08/19/2021540188447Open ↗
▸BISINTERIOR LIGHTING POWER1
08/22/2024540188447Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/22/2024540188447Open ↗
▸BISFENESTRATION AREAS1
08/22/2024540188447Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
08/22/2024540188447Open ↗
▸BISNYCECC ANALYSIS1
01/29/2021540188447Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
08/22/2024540188447Open ↗
▸BISLIGHTING IN DWELLING UNITS1
08/22/2024540188447Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/22/2024540188447Open ↗
▸BISLIGHTING CONTROLS1
08/22/2024540188447Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY8
08/22/2024540188447Open ↗
08/22/2024540188447Open ↗
09/16/2021540188447Open ↗
Showing 3 of 8 on file for this type
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
09/17/2021540188447Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
08/22/2024540188447Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
04/22/2025540188447Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/22/2024540188447Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/22/2024540188447Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
08/22/2024540188447Open ↗
▸BISMASONRY1
08/22/2024540188447Open ↗
▸BISDRYWELL BORINGS1
04/22/2025540188447Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
12/21/2020540193315Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
08/22/2024540188447Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
08/22/2024540188447Open ↗
▸BISSOIL REPORT1
12/18/2020540188447Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
08/22/2024540188447Open ↗
▸Approvals, Objections & Sign-offs16
▸BISSCHEDULE A - OCCUPANCY / USE9
05/22/2025540188447Open ↗
05/16/2025540188447Open ↗
02/10/2025540188447Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
12/29/2025520472113Open ↗
12/29/2025520472113Open ↗
09/21/2021540188447Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
05/03/2023540193315Open ↗
12/21/2020540193315Open ↗
▸BISFIRE SUPPRESSION SYSTEM (FP) SIGNOFF1
03/12/2025540188447Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/12/2021540188447Open ↗
▸Cost, Insurance & Ownership1
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
09/17/2021540188447Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION4
03/04/2025540188447Open ↗
11/30/2023540188447Open ↗
08/19/2021540188447Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
12/21/2020540193315Open ↗
12/18/2020540188447Open ↗
▸BISEFILING COVER SHEET1
11/20/2025520472113Open ↗
▸Other Documents13
▸BISPLOT DIAGRAM3
12/29/2025520472113Open ↗
08/12/2021540188447Open ↗
12/21/2020540188447Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026S00716932-I1Open ↗
08/13/2026S00640550-I1Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
12/18/2020540188447Open ↗
▸BISLOWEST FLOOR ELEVATION1
08/22/2024540188447Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
08/22/2024540188447Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
08/22/2024540188447Open ↗
▸BISMAINTENANCE INFORMATION1
08/22/2024540188447Open ↗
▸BISPERMANENT CERTIFICATE1
08/22/2024540188447Open ↗
▸BISBPP: FILING REQUIRED1
01/29/2021540188447Open ↗
▸BISVENTILATION AND AIR DISTRIBUTION SYSTEM1
08/22/2024540188447Open ↗