← Back
BuildNYC
Walk-up apt, over six families with stores
402 WEST 51ST STREET
MANHATTAN · BIN 1026690
💬 Discuss this project
1910Year Built
5Stories
C7Building Class
R8Zoning
12,000 sfGross Floor Area
22Units
Rent Stabilized16 Active Violations 13 unresolved · 3 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: Genuine Realty · 2,500 sf lot · 4.8 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Fluxpace, Unit 2B17p · 1 filing · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Genuine Realty1803/22/2026
Emar Building203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Uni-D409/25/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Garden State of NJ Data Recovery403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Citywide Electrical ContractingElectrical103/21/2026
Jeco Electrical ServiceElectrical103/21/2026
I.S.M. ElectricElectrical103/21/2026
Unity Electric CoElectrical103/21/2026
NYC Rigger ConstructionGeneral Contractor107/08/2026
Amm General ContractingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Uni-D7898409/25/2023
Building Lifecycle
All (80)Filed (4)Permit Issued (2)Signed Off (1)Violation (60)Inspection (3)Special Inspection (10)
08/16/2026
Violation issued (HPD, open)
B
08/16/2026
Violation issued (HPD, open)
A
08/16/2026
Violation issued (HPD, open)
B
08/16/2026
Violation issued (HPD, open)
A
08/16/2026
Violation issued (HPD, open)
B
08/16/2026
Violation issued (HPD, open)
C
05/21/2026
Violation issued (HPD, closed)
B
05/21/2026
Violation issued (HPD, closed)
A
05/21/2026
Violation issued (HPD, closed)
C
12/04/2023
Signed off — Alteration
Unit 2B. Direct replacement of kitchen sink, shower, vanity, and toilet. No change in use, egress, or occupancy.
M00840137-I1
10/23/2023
Violation issued (HPD, closed)
A
10/23/2023
Violation issued (HPD, closed)
B
10/23/2023
Violation issued (HPD, open)
B
10/23/2023
Violation issued (HPD, closed)
B
10/16/2023
Violation issued (ECB, closed)
Boilers
10/11/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/26/2023
Special inspection requirement — Tenant Protection Plan Compliance
Jackie Bolalin
09/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jackie Bolalin
09/26/2023
Special inspection requirement — Fire-Resistance Rated Construction
Jackie Bolalin
09/26/2023
Special inspection requirement — Final
Jackie Bolalin
09/25/2023
Filed — Alteration
Unit 2B. Direct replacement of kitchen sink, shower, vanity, and toilet. No change in use, egress, or occupancy.
M00840137-P2
09/25/2023
Filed — Alteration
Unit 2B. Direct replacement of kitchen sink, shower, vanity, and toilet. No change in use, egress, or occupancy.
M00840137-P1
09/22/2023
Special inspection requirement — Tenant Protection Plan Compliance
09/21/2023
Special inspection requirement — Fire-Resistance Rated Construction
Jackie Bolalin
09/21/2023
Special inspection requirement — Tenant Protection Plan Compliance
09/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jackie Bolalin
09/21/2023
Special inspection requirement — Final
Jackie Bolalin
09/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jackie Bolalin
07/26/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/29/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/09/2023
Permit issued — Plumbing
M00840137-S1-PL
04/19/2023
Permit issued — General Construction
M00840137-I1-GC
03/15/2023
Filed — Alteration
Unit 2B. Direct replacement of kitchen sink, shower, vanity, and toilet. No change in use, egress, or occupancy.
M00840137-S1
03/09/2023
Filed — Alteration
Unit 2B. Direct replacement of kitchen sink, shower, vanity, and toilet. No change in use, egress, or occupancy.
M00840137-I1
12/08/2021
Violation issued (HPD, closed)
B
12/08/2021
Violation issued (HPD, closed)
B
11/28/2018
Violation issued (HPD, closed)
C
11/28/2018
Violation issued (HPD, open)
B
11/28/2018
Violation issued (HPD, closed)
B
11/28/2018
Violation issued (HPD, open)
A
10/29/2018
Violation issued (HPD, closed)
B
10/29/2018
Violation issued (HPD, closed)
B
10/29/2018
Violation issued (HPD, closed)
B
10/29/2018
Violation issued (HPD, closed)
B
10/29/2018
Violation issued (HPD, closed)
B
10/29/2018
Violation issued (HPD, open)
B
12/04/2017
Violation issued (HPD, closed)
C
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/15/2014
Violation issued (HPD, closed)
B
10/15/2014
Violation issued (HPD, closed)
B
10/15/2014
Violation issued (HPD, closed)
B
08/21/2012
Violation issued (ECB, open)
Construction
04/06/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/10/2011
Violation issued (ECB, closed)
Construction
01/10/2011
Violation issued (ECB, closed)
Construction
01/10/2011
Violation issued (ECB, closed)
Construction
01/10/2011
Violation issued (ECB, closed)
Construction
01/10/2011
Violation issued (ECB, closed)
Zoning
01/10/2011
Violation issued (ECB, closed)
Construction
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAmm General Contracting06/09/2023
DOB NOWGeneral ConstructionSigned-offNYC Rigger Construction04/19/2023
BISOTISSUEDJ Chan Group02/15/2013
BISEQISSUEDJ Chan Group02/15/2013
BISOTISSUEDTriple 8 Construction05/28/2009
BISEQISSUEDM.S.S. Construction03/13/2009
BISOTISSUEDNew Age Window Inc. D/B/A02/11/2009
BISFPISSUEDMaster Fire Systems03/14/2005
BISPLISSUEDDimensions Mechanical02/22/2005
BISOTISSUEDGenuene Realty02/03/2005
BISEQISSUEDGenuene Realty01/11/2005
BISOTISSUEDGenuene Realty01/11/2005
BISOTISSUEDDay Sung Construction01/10/2005
BISBLISSUEDCoastal Combustion04/13/2004
BISFBISSUEDCoastal Combustion12/04/2003
BISFPISSUEDNew York Business Fire System01/12/1999
BISPLISSUEDAmok11/10/1998
BISOTISSUEDCNP Air Conditioning11/10/1998
BIS—ISSUEDL.s.sign Co04/18/1996
BISFPISSUEDIdeal Fire Control08/16/1993
BISMHISSUEDMarangos Construction05/27/1993
BIS—ISSUEDFrank Torrone & Sons05/20/1992
1 project · most recent 09/25/2023
Water/Sanitary
FiledStatusContractorScope
09/25/2023Signed-offAmm General ContractingWater/Sanitary
1 project · most recent 06/07/2019
General Wiring
FiledStatusContractorScope
06/07/2019Permit IssuedI.S.M. ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/11/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/26/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/29/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
09/26/2023Tenant Protection Plan ComplianceJackie Bolalinspecial
09/26/2023Fire-Resistant Penetrations and JointsJackie Bolalinspecial
09/26/2023Fire-Resistance Rated ConstructionJackie Bolalinprogress
09/26/2023FinalJackie Bolalinprogress
09/22/2023Tenant Protection Plan Compliance—special
09/21/2023Fire-Resistance Rated ConstructionJackie Bolalinprogress
09/21/2023Tenant Protection Plan Compliance—special
09/21/2023Fire-Resistant Penetrations and JointsJackie Bolalinspecial
09/21/2023FinalJackie Bolalinprogress
09/21/2023Fire-Resistant Penetrations and JointsJackie Bolalinspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
FluxpaceResidentialFloor 2
Project M00840137 Alteration · Permit Entire · 03/09/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 109 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/29/2026M00840137-I1Request digital key ↗
08/29/2026M00840137-P2Request digital key ↗
08/29/2026M00840137-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION13
06/25/2019123853838Open ↗
01/11/2016121859211Open ↗
12/09/2013121859211Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION6
02/21/2013121530129Open ↗
02/21/2013121530129Open ↗
06/11/2009120054476Open ↗
Showing 3 of 6 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
01/22/2013110479027Open ↗
▸Seals & Professional Certifications30
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
06/25/2019123853838Open ↗
12/09/2013121859211Open ↗
02/21/2013121530129Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
12/09/2013121859211Open ↗
02/21/2013121530129Open ↗
05/20/2009120043069Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
02/21/2013121530129Open ↗
05/21/2009120043069Open ↗
03/13/2009110479027Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/29/2026M00840137-I1Open ↗
08/29/2026M00840137-P2Open ↗
08/29/2026M00840137-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026M00840137-P1Open ↗
09/01/2026M00840137-P1Open ↗
09/01/2026M00840137-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M00840137-P1Open ↗
09/01/2026M00840137-I1Open ↗
09/01/2026M00840137-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/09/2013121859211Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/25/2019123853838Open ↗
▸BISSCHEDULE B - PLUMBING1
12/09/2013121859211Open ↗
▸Safety & Tenant Protection13
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist4
08/13/2026M00840137-S1Open ↗
08/13/2026M00840137-P2Open ↗
08/13/2026M00840137-I1Open ↗
Showing 3 of 4 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON3
12/09/2013121859211Open ↗
02/21/2013121530129Open ↗
01/26/2009110441013Open ↗
▸BISTenant Protection Plan and Notes2
10/11/2019123853838Open ↗
06/25/2019123853838Open ↗
▸BISST-1 Street Tree Checklist1
05/20/2009120043069Open ↗
▸BISHPD-2 - Clinton Special district Anti-Harassment Checklist1
05/20/2009120043069Open ↗
▸BISSTREET TREE CHECKLIST1
01/26/2009110441013Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
10/11/2019123853838Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/29/2026M00840137-I1Open ↗
08/29/2026M00840137-P2Open ↗
08/29/2026M00840137-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
06/25/2019123853838Open ↗
12/09/2013121859211Open ↗
02/21/2013121530129Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
06/03/2009120054476Open ↗
05/20/2009120043069Open ↗
03/13/2009110479027Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/26/2009110441013Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
10/11/2019123853838Open ↗
06/25/2019123853838Open ↗
12/09/2013121859211Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs10
▸BISADMINISTRATIVE OBJECTIONS4
02/21/2013121530129Open ↗
06/03/2009120054476Open ↗
05/20/2009120043069Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/25/2013110479027Open ↗
01/05/2012120054476Open ↗
05/29/2009110441013Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
01/25/2013110479027Open ↗
01/05/2012120054476Open ↗
11/05/2010110441013Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
06/25/2019123853838Open ↗
12/09/2013121859211Open ↗
02/21/2013121530129Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET7
06/25/2019123853838Open ↗
12/09/2013121859211Open ↗
02/21/2013121530129Open ↗
Showing 3 of 7 on file for this type
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
01/05/2012120054476Open ↗
11/05/2010110441013Open ↗