← Back
Predominantly retail with other uses
4023 BROADWAY
MANHATTAN · BIN 1081865
💬 Discuss this project
1950Year Built
1Stories
K4Building Class
R8Zoning
33,645 sfGross Floor Area
22Units
Rent Stabilized8 Open Violations 7 unresolved · 1 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: ROYAL CHARTER PROPERTIES, INC. · 24,402 sf lot · 1.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof5p · 4 filings · 20 docs
Penthouse2p · 2 filings · 4 docs
Floor 133p · 3 filings · 8 docs
Floor 123p · 3 filings · 8 docs
Floor 113p · 3 filings · 8 docs
Floor 102p · 2 filings · 6 docs
Floor 92p · 2 filings · 6 docs
Floor 82p · 2 filings · 6 docs
Floor 72p · 2 filings · 6 docs
Floor 62p · 2 filings · 6 docs
Floor 52p · 2 filings · 6 docs
Floor 42p · 2 filings · 6 docs
Floor 31p · 1 filing · 4 docs
Floor 22p · 2 filings · 6 docs
Floor 1
Cellar2p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK PRESBYTERIAN HOSPITAL3207/08/2026
NEW YORK PRESBYTERIAN704/09/2026
ROYAL CHARTER PROPERTIES, INC.1103/22/2026
PRESBYTERIAN HOSPITAL203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HOWARD I SHAPIRO & ASSOCIATES806/13/2025
HC PEC106/13/2025
TOHFAZ UDDIN PE PC409/20/2024
JAROS BAUM & BOLLES303/25/2021
KZ ENGINEERING, P.C209/02/2020
THORNTON TOMASETTI104/27/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HOWARD I SHAPIRO ASSOCIATES1203/21/2026
A1 EXPEDITING SERVICE203/21/2026
AE DESIGN SOLUTION803/21/2026
SYNERGY BUILDING CONSULTANTS203/21/2026
MUNICIPAL EXPEDITING803/21/2026
EXPEDITE DEM403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PAR ENVIRONMENTAL CORPORAGeneral Contractor1207/08/2026
EAGLE SCAFFOLDING SVCS INCGeneral Contractor704/09/2026
ARSENAL SCAFFOLD INCGeneral Contractor304/09/2026
CORPORATE ELEC. GROUP INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC423506/13/2025
Building Lifecycle
All (102)Filed (19)Permit Issued (19)Signed Off (9)Violation (6)Objection (19)Special Inspection (30)
05/12/2026
Signed off — Alteration
M01040965-S1
05/12/2026
Signed off — Alteration
M01040965-I1
11/18/2025
Permit issued — Construction Fence
M01235545-I1-FN
09/18/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SHORING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01033058-I1
09/18/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01033029-I1
09/18/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01033037-I1
07/29/2025
Signed off — Full Demolition
mechanical means to assist with full demolition in accordance with approved DM plans
M00843682-I1
07/17/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
Young Suh
07/17/2025
Special inspection requirement — Demolition
Young Suh
07/02/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01033051-I1
07/02/2025
Objection resolved — Addressed
06/24/2025
Objection raised — Other
06/13/2025
Filed — Full Demolition
mechanical means to assist with full demolition in accordance with approved DM plans
M00843682-P6
06/13/2025
Filed — Alteration
CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01235545-I1
06/13/2025
Permit issued — Construction Fence
M01235545-I1-FN
04/18/2025
Permit issued — Sidewalk Shed
M01033029-I1-SH
04/18/2025
Permit issued — Supported Scaffold
M01033037-I1-SF
04/15/2025
Permit issued — Construction Fence
M01033051-I1-FN
03/25/2025
Objection resolved — Addressed
03/20/2025
Objection raised — Other
03/11/2025
Filed — Full Demolition
mechanical means to assist with full demolition in accordance with approved DM plans
M00843682-P5
03/06/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
Young Suh
03/06/2025
Special inspection requirement — Demolition
Young Suh
02/28/2025
Permit issued — Full Demolition
M00843682-I1-FD
02/27/2025
Permit issued — Protection and Mechanical Methods
M00843682-S1-PMM
01/28/2025
Filed — Full Demolition
mechanical means to assist with full demolition in accordance with approved DM plans
M00843682-P4
12/13/2024
Permit issued — General Construction
M01040965-I1-GC
12/13/2024
Permit issued — Protection and Mechanical Methods
M01040965-S1-PMM
12/03/2024
Permit issued — General Construction
M01040965-I1-GC
12/03/2024
Permit issued — Protection and Mechanical Methods
M01040965-S1-PMM
09/20/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SHORING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01033058-I1
09/20/2024
Permit issued — Protection and Mechanical Methods
M01033058-I1-PMM
08/14/2024
Permit issued — General Construction
M01040965-I1-GC
08/08/2024
Filed — Alteration
M01040965-S1
08/08/2024
Permit issued — Protection and Mechanical Methods
M01040965-S1-PMM
06/13/2024
Objection raised — Other
06/13/2024
Objection resolved — Addressed
06/13/2024
Objection raised — Structural
06/13/2024
Objection resolved — Addressed
06/05/2024
Filed — Full Demolition
mechanical means to assist with full demolition in accordance with approved DM plans
M00843682-P1
06/03/2024
Filed — Alteration
M01040965-I1
05/17/2024
Filed — Full Demolition
mechanical means to assist with full demolition in accordance with approved DM plans
M00843682-S1
05/07/2024
Special inspection requirement — Demolition
Young Suh
05/07/2024
Special inspection requirement — Structural Stability – Alterations of existing Buildings
Young Suh
04/24/2024
Special inspection requirement — Demolition
Young Suh
04/24/2024
Special inspection requirement — Final
Thomas Tagliano
04/22/2024
Permit issued — Sidewalk Shed
M01033029-I1-SH
04/22/2024
Permit issued — Supported Scaffold
M01033037-I1-SF
04/19/2024
Permit issued — Construction Fence
M01033051-I1-FN
04/18/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01033029-I1
04/18/2024
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01033037-I1
04/18/2024
Filed — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01033051-I1
06/08/2023
Filed — Full Demolition
mechanical means to assist with full demolition in accordance with approved DM plans
M00843682-I1
04/12/2021
Objection resolved — Resolved
03/26/2021
Objection raised — Scope
03/25/2021
Filed — Alteration
Plumbing modifications in cellar, roof, and floors 1 thru 13 as per plans filed herewith.
M00342211-P1
03/12/2021
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00354289-I1
03/12/2021
Signed off — Alteration
M00363201-I1
09/04/2020
Permit issued — Supported Scaffold
M00363201-I1-SF
09/03/2020
Permit issued — Sidewalk Shed
M00354289-I1-SH
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedPAR ENVIRONMENTAL CORPORA11/18/2025
DOB NOWConstruction FencePermit IssuedPAR ENVIRONMENTAL CORPORA06/13/2025
DOB NOWSidewalk ShedSigned-offEAGLE SCAFFOLDING SVCS IN04/18/2025
DOB NOWSupported ScaffoldSigned-offEAGLE SCAFFOLDING SVCS IN04/18/2025
DOB NOWConstruction FenceSigned-offEAGLE SCAFFOLDING SVCS IN04/15/2025
DOB NOWFull DemolitionSigned-offPAR ENVIRONMENTAL CORPORA02/28/2025
DOB NOWProtection and Mechanical MethodsSigned-offPAR ENVIRONMENTAL CORPORA02/27/2025
DOB NOWGeneral ConstructionSigned-offPAR ENVIRONMENTAL CORPORA12/13/2024
DOB NOWProtection and Mechanical MethodsSigned-offPAR ENVIRONMENTAL CORPORA12/13/2024
DOB NOWGeneral ConstructionSigned-offPAR ENVIRONMENTAL CORPORA12/03/2024
DOB NOWProtection and Mechanical MethodsSigned-offPAR ENVIRONMENTAL CORPORA12/03/2024
DOB NOWProtection and Mechanical MethodsSigned-offEAGLE SCAFFOLDING SVCS IN09/20/2024
DOB NOWGeneral ConstructionSigned-offPAR ENVIRONMENTAL CORPORA08/14/2024
DOB NOWProtection and Mechanical MethodsSigned-offPAR ENVIRONMENTAL CORPORA08/08/2024
DOB NOWSidewalk ShedSigned-offEAGLE SCAFFOLDING SVCS IN04/22/2024
DOB NOWSupported ScaffoldSigned-offEAGLE SCAFFOLDING SVCS IN04/22/2024
DOB NOWConstruction FenceSigned-offEAGLE SCAFFOLDING SVCS IN04/19/2024
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC09/04/2020
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC09/03/2020
BISOTISSUEDRED APPLE SUPERMARK03/12/2002
BISPLISSUEDCITY/SUBURBAN PLBG CORP03/08/2002
1 project · most recent 05/07/2020
Air Conditioning Systems Associated Ducts and Piping Generators Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/07/2020——Air Conditioning Systems, Associated Ducts and Piping, Generators, Heating Systems
Cooling
Daikin FXMQ12PBVJU 12,000 BTU · Vrf Indoor ×91
FXMQ07PBVJU 7,000 BTU · Vrf Indoor ×89
REYQ72TATJA 72,000 BTU · Vrf Outdoor ×37
FXMQ18PBVJU 18,000 BTU · Vrf Indoor ×27
FXMQ15PBVJU 15,000 BTU · Vrf Indoor ×14
FXMQ24PBVJU 24,000 BTU · Vrf Indoor ×12
FXMQ48PBVJU 48,000 BTU · Vrf Indoor ×11
FXSQ05TAVJU 281 CFM · Vrf Indoor ×11
REYQ96TATJA 96,000 BTU · Vrf Outdoor ×5
FXMQ36PBVJU 48,000 BTU · Vrf Indoor ×3
FXMQ09PBVJU 9,000 BTU · Vrf Indoor ×2
REYQ120TATJA 120,000 BTU · Vrf Outdoor ×2
Heating
— 051C8A 425 CFM · Unit Heater ×7
031A2AT 425 CFM · Unit Heater ×5
051A2AT 425 CFM · Unit Heater ×2
031B8A 425 CFM · Unit Heater ×1
Ducts & Piping
__Junk__ Ductwork and Fire Dampers 1 CFM · Ductwork ×1
1 project · most recent 03/25/2021
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/25/2021——Gas, Storm, Water/Sanitary
2 projects · most recent 04/24/2024
FiledStatusContractorScope
04/24/2024CompleteCORPORATE ELEC. GROUP INC—
09/10/2020CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 04/27/2020
Concrete
FiledStatusContractorScope
04/27/2020——Concrete
1 project · most recent 06/13/2025
Fence
FiledStatusContractorScope
06/13/2025Permit IssuedPAR ENVIRONMENTAL CORPORAFence
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
07/17/2025Structural Stability – Alterations of existing BuildingsYoung Suhspecial
07/17/2025DemolitionYoung Suhspecial
03/06/2025Structural Stability – Alterations of existing BuildingsYoung Suhspecial
03/06/2025DemolitionYoung Suhspecial
05/07/2024DemolitionYoung Suhspecial
05/07/2024Structural Stability – Alterations of existing BuildingsYoung Suhspecial
04/24/2024DemolitionYoung Suhspecial
04/24/2024FinalThomas Taglianoprogress
06/03/2020FinalKarol Zdancewiczprogress
05/06/2020Post-installed Anchors—special
04/27/2020Concrete - Cast-In-Place—special
04/24/2020Masonry—special
04/24/2020Structural Steel - Welding—special
04/24/2020Structural Steel - Details—special
04/24/2020Structural Steel - High Strength Bolting—special
04/21/2020HVAC insulation and sealing —energy_progress
04/21/2020Electrical energy consumption—energy_progress
04/21/2020HVAC and service water heating equipment —energy_progress
04/21/2020Permanent certificate—energy_progress
04/21/2020Shutoff dampers—energy_progress
04/21/2020Smoke Control Systems Testing—special
04/21/2020Heating Systems—special
04/21/2020Fire-Resistant Penetrations and Joints—special
04/21/2020Emergency and Standby Power Systems (Generator)—special
04/21/2020Chimneys and vents—special
Latest 25 of 33.
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch13
08/27/2026M01033029-I1Request digital key ↗
08/27/2026M01033037-I1Request digital key ↗
08/27/2026M01033051-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00342211-I1Request digital key ↗
08/15/2026M00342211-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00363201-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00354289-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/14/2026M00342575-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00341999-I1Request digital key ↗
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION12
02/25/2021121207675Open ↗
02/24/2021121207675Open ↗
02/19/2021121207675Open ↗
Showing 3 of 12 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/05/2021121207675Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
03/05/2021121207675Open ↗
▸Seals & Professional Certifications33
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/04/2026M00363201-I1Open ↗
09/04/2026M00342211-I1Open ↗
08/27/2026M00843682-P5Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/28/2026M00843682-P1Open ↗
08/28/2026M00843682-P1Open ↗
08/28/2026M01040965-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026M00354289-I1Open ↗
08/23/2026M01040965-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
—140985637Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
—140985637Open ↗
▸Trade Schedules & Equipment5
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
03/05/2021121207675Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026M00843682-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026M00843682-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026M00843682-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026M00843682-I1Open ↗
▸Safety & Tenant Protection1
▸BISBPP: STREET TREES SITE PLAN1
—140985637Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/26/2026M01040965-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00843682-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026M00843682-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/03/2021121207675Open ↗
02/03/2021121207675Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
02/03/2021121207675Open ↗
▸Approvals, Objections & Sign-offs13
▸BISSCHEDULE A - OCCUPANCY / USE6
02/25/2021121207675Open ↗
02/24/2021121207675Open ↗
10/14/2020121207675Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/27/2026M00843682-I1Open ↗
08/27/2026M00843682-S1Open ↗
08/27/2026M00843682-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
02/03/2021121207675Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET3
09/28/2020121207675Open ↗
07/22/2020123920285Open ↗
05/06/2020121207675Open ↗
▸BISADDITIONAL INFORMATION2
02/03/2021121207675Open ↗
02/03/2021121207675Open ↗
▸BISBOROUGH INTAKE FORM2
10/02/2020123920285Open ↗
07/22/2020123920285Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
—140985637Open ↗
▸Other Documents12
▸DOB NOWProperty Ownership Certification4
08/27/2026M00843682-I1Open ↗
08/27/2026M00843682-P1Open ↗
08/14/2026M00843682-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStructure Photographs4
08/27/2026M00843682-I1Open ↗
08/27/2026M00843682-P1Open ↗
08/14/2026M00843682-P5Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM1
03/05/2021121207675Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
—140985637Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026M00843682-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026M00843682-I1Open ↗