← Back
Elevator apt, semi-fireproof without stores
4026 CARPENTER AVENUE
BRONX · BIN 2063115
💬 Discuss this project
1940Year Built
6Stories
D1Building Class
R6AZoning
26,964 sfGross Floor Area
30Units
LL97 CoveredRent Stabilized149 Open Violations 134 unresolved · 15 paperwork only ▸FISP: No Report Filed
Elevator apt, semi-fireproof without stores · Owner of record: 4026 CARPENTER LLC · 5,700 sf lot · 4.73 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TITAN SERVICES USA209/07/2026
JASCO, INC503/22/2026
4026 CARPENTER LLC803/22/2026
4026 CARPENTER AVE LLC2303/22/2026
CHAPPAQUA REALTY103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/01/2023$2.2M—— → —$83/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASR ENGINEERING PC105/27/2026
AR CONSULTING ENGINEER103/20/2026
HAIDER ENGINEERING, P.E.111/15/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JASCO, INCGeneral Contractor303/21/2026
TITAN SERVICES USA INCGeneral Contractor209/07/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR CONSULTING ENGINEER P.4054103/20/2026
Building Lifecycle
All (73)Filed (3)Permit Issued (3)Signed Off (1)Facade (FISP) (3)Violation (60)Special Inspection (3)
08/31/2026
Permit issued — Sidewalk Shed
X01407293-I1-SH
08/07/2026
Violation issued (HPD, open)
B
08/07/2026
Violation issued (HPD, open)
A
07/17/2026
Violation issued (HPD, open)
C
07/17/2026
Violation issued (HPD, open)
C
07/17/2026
Violation issued (HPD, open)
A
07/17/2026
Violation issued (HPD, open)
C
07/17/2026
Violation issued (HPD, open)
C
07/17/2026
Violation issued (HPD, open)
C
07/17/2026
Violation issued (HPD, open)
C
07/17/2026
Violation issued (HPD, closed)
C
07/17/2026
Violation issued (HPD, open)
C
07/17/2026
Violation issued (HPD, open)
C
06/29/2026
Violation issued (HPD, open)
B
06/29/2026
Violation issued (HPD, closed)
B
06/29/2026
Violation issued (HPD, closed)
C
06/29/2026
Violation issued (HPD, closed)
C
06/29/2026
Violation issued (HPD, closed)
C
06/29/2026
Violation issued (HPD, closed)
C
06/29/2026
Violation issued (HPD, closed)
B
06/08/2026
Permit issued — Sidewalk Shed
X01407293-I1-SH
05/27/2026
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01407293-I1
05/21/2026
Violation issued (HPD, open)
B
05/21/2026
Violation issued (HPD, open)
B
05/20/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/20/2026
Violation issued (ECB, open)
Construction
05/20/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/20/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/19/2026
Violation issued (HPD, open)
C
05/19/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/19/2026
Violation issued (HPD, open)
B
05/19/2026
Violation issued (ECB, open)
Construction
05/19/2026
Violation issued (ECB, open)
Construction
05/19/2026
Violation issued (HPD, open)
C
03/20/2026
Filed — Alteration
Exterior Facade repair work along all the Exposures, as shown on the plans. No change in the Use, Egress or Occupancy under this application.
X01334901-I1
03/19/2026
Violation issued (ECB, open)
Construction
03/19/2026
Violation issued (ECB, open)
Construction
03/19/2026
Violation issued (ECB, open)
Construction
01/22/2026
Violation issued (HPD, closed)
B
01/22/2026
Violation issued (HPD, closed)
B
01/22/2026
Violation issued (HPD, closed)
B
01/13/2026
Violation issued (ECB, closed)
Elevators
01/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
QAZI RAZZAK
01/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
QAZI RAZZAK
01/05/2026
Special inspection requirement — Final
MOHSIN BHUIYAN
12/31/2025
Violation issued (HPD, closed)
B
12/31/2025
Violation issued (HPD, closed)
A
12/31/2025
Violation issued (HPD, closed)
B
12/31/2025
Violation issued (HPD, closed)
C
12/31/2025
Violation issued (HPD, closed)
C
12/31/2025
Violation issued (HPD, closed)
A
12/31/2025
Violation issued (HPD, closed)
B
12/31/2025
Violation issued (HPD, open)
B
12/31/2025
Violation issued (HPD, closed)
B
12/31/2025
Violation issued (HPD, closed)
C
12/31/2025
Violation issued (HPD, closed)
C
12/24/2025
Violation issued (HPD, closed)
B
12/24/2025
Violation issued (HPD, closed)
C
12/24/2025
Violation issued (HPD, closed)
C
12/24/2025
Violation issued (HPD, closed)
C
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedTITAN SERVICES USA INC08/31/2026
DOB NOWSidewalk ShedPermit IssuedTITAN SERVICES USA INC06/08/2026
DOB NOWSidewalk ShedSigned-offJASCO, INC11/15/2019
3 projects · most recent 05/29/2026
FiledStatusContractorScope
05/29/2026Permit IssuedRICHARD NEU—
11/22/2019CompleteWCK ELECTRIC CORP.—
04/12/2019Permit IssuedBRANDL ELECTRIC INC.1 meters, 1 new_meters
1 project · most recent 05/27/2026
Sidewalk Shed
FiledStatusContractorScope
05/27/2026Permit IssuedTITAN SERVICES USA INCSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
01/12/2026Structural Stability – Alterations of existing buildingsQAZI RAZZAKspecial
01/12/2026Tenant Protection Plan ComplianceQAZI RAZZAKspecial
01/05/2026FinalMOHSIN BHUIYANprogress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/17/2026X01334901-I1Request digital key ↗
08/16/2026X01407293-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00264295-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026X00264295-I1Open ↗
08/17/2026X01334901-I1Open ↗
08/16/2026X01407293-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026X01334901-I1Open ↗
08/23/2026X01334901-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026X01334901-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026X00264295-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026X01334901-I1Open ↗
▸Other Documents2
▸DOB NOWHPD4: CONH Pilot Program2
08/17/2026X01334901-I1Open ↗
08/16/2026X01407293-I1Open ↗