← Back
Three families
4028 LOWERRE PLACE
BRONX · BIN 2063087
💬 Discuss this project
1960Year Built
3Stories
C0Building Class
R5AZoning
3,076 sfGross Floor Area
3Units
Three families · 2,100 sf lot · 1.46 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR105/02/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281105/02/2024
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
05/08/2024
Permit issued — Solar
X01032372-I1-SL
05/02/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 8 Panels, 3.28 kW
X01032372-I1
04/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
04/08/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
04/08/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
04/08/2024
Special inspection requirement — Final
Mina Makar
04/08/2024
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedMOMENTUM SOLAR05/08/2024
1 project · most recent 05/01/2024
FiledStatusContractorScope
05/01/2024Permit IssuedISLAND ELECTRIC CORP—
1 project · most recent 05/02/2024
FiledStatusContractorScope
05/02/2024Permit IssuedMOMENTUM SOLAR8 panels, 3.28 kw, 141 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/08/2024Fire-Resistant Penetrations and JointsMina Makarspecial
04/08/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
04/08/2024Energy Code Compliance InspectionsMina Makarprogress
04/08/2024FinalMina Makarprogress
04/08/2024Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026X01032372-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026X01032372-I1Open ↗
08/30/2026X01032372-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026X01032372-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/30/2026X01032372-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01032372-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01032372-I1Open ↗