BuildNYC
Predominantly retail with other uses
4030 18TH AVENUE
BROOKLYN · Kensington · BIN 3259613
💬 Discuss this project
2020Year Built
2Stories
K4Building Class
R6AZoning
7,496 sfGross Floor Area
4Units
1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: Ytad 18th · 6,314 sf lot · 1.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSuspended scaffold installationUnder Construction86p · 3 filings · 20 docs
BulkheadUnder Construction5p · 1 filing · 20 docs
Floor 4Under Construction105p · 2 filings · 20 docs
Floor 3Under Construction106p · 2 filings · 20 docs
Floor 2Under Construction105p · 1 filing · 20 docs
Floor 1Levon Lion Equities At 18th, LLCUnder Construction107p · 3 filings · 20 docs
CellarUnder Construction105p · 1 filing · 20 docs
Site & exteriorHeavy duty sidewalk shedUnder Construction42p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Levon Lion Equities at 18th1503/21/2026
YBYT 18th Avenue703/21/2026
TTN304/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/30/2025$4.1M—YBYT 18TH AVENUE LLC → YTAD 18TH LLC$547/sf building
12/30/2021$4.1M—— → —$547/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Djlu Architect907/27/2026
Advanced Engineering & Inspection1006/15/2026
Amr Ouda310/23/2025
Rigid Structural Design206/30/2025
NA101/10/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediter Group203/21/2026
TTN903/21/2026
Professional Design Consultants203/21/2026
Rigid Structural Design603/21/2026
Galaxy Developers203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B T General BuildersGeneral Contractor707/08/2026
First Quality ElectricalElectrical303/21/2026
Precision Hoist & Scaffo*Scaffold207/08/2026
Approved ElectricElectrical103/21/2026
Pipe Solutions AdvisGeneral Contractor103/22/2026
B T General BuildersScaffold104/09/2026
Galaxy DevelopersScaffold104/09/2026
Pipe Solutions AdvisPlumbing106/28/2026
Tristate Fire SprinklersFire Protection107/08/2026
Jeco Electrical ServiceElectrical103/21/2026
Polyphase Electrical ContractorsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161607/27/2026
Advanced Engineering &1224111/11/2025
Urban Integrations7993109/16/2025
Building Lifecycle
All (217)Filed (27)Permit Issued (15)Signed Off (10)Violation (43)Inspection (12)Objection (80)Special Inspection (30)
08/19/2026
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
FAHAD FATEH
08/19/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
08/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
08/19/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
08/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
08/19/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/18/2026
Objection resolved — Addressed
08/18/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
08/18/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
08/18/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
08/18/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
08/18/2026
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
08/18/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
08/18/2026
Special inspection requirement — Sprayed fire-resistant materials
FAHAD FATEH
08/18/2026
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
08/18/2026
Special inspection requirement — Metering
FAHAD FATEH
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/18/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
08/18/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/18/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
08/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
08/18/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
08/18/2026
Special inspection requirement — Air barrier — testing
FAHAD FATEH
08/18/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
08/18/2026
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
08/12/2026
Objection raised — Scope
08/11/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/30/2026
Objection resolved — Resolved
07/27/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
SOE FILED IN CONJUNCTION WITH ALT CO B00718049-I1
B00718049-A6
07/27/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
SOE FILED IN CONJUNCTION WITH ALT CO B00718049-I1
B00718049-S6
07/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/15/2026
Violation issued (ECB, open)
Construction
06/22/2026
Objection raised — Scope
06/15/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
SOE FILED IN CONJUNCTION WITH ALT CO B00718049-I1
B00718049-A1
06/11/2026
Special inspection requirement — On-Site Private Sewage Disposal Systems Installation
FAHAD FATEH
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/11/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
06/11/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/20/2026
Signed off — Alteration
B01316760-I1
05/14/2026
Permit issued — Suspended Scaffold
B01316760-I1-SC
05/06/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
SOE FILED IN CONJUNCTION WITH ALT CO B00718049-I1
B00718049-S7
04/15/2026
Signed off — Alteration
Curb cut application herewith filed in conjunction to NB application B00718049-I1
B00749954-I1
03/27/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/27/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/17/2026
Objection resolved — Addressed
03/16/2026
Objection resolved — Addressed
03/16/2026
Objection resolved — Addressed
03/05/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/04/2026
Objection raised — Plumbing
03/04/2026
Objection raised — Admin
03/04/2026
Objection raised — Admin
02/26/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
SOE FILED IN CONJUNCTION WITH ALT CO B00718049-I1
B00718049-P8
02/26/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
02/26/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/24/2026
Violation issued (ECB, closed)
Unknown
02/24/2026
Violation issued (ECB, closed)
Construction
02/11/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
SOE FILED IN CONJUNCTION WITH ALT CO B00718049-I1
B00718049-P7
01/28/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
SOE FILED IN CONJUNCTION WITH ALT CO B00718049-I1
B00718049-S4
Latest 60 of 217 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offBig Apple Renovation & RE05/14/2026
DOB NOWMechanical SystemsPermit IssuedB T General Builders12/24/2025
DOB NOWSuspended ScaffoldSigned-offBig Apple Renovation & RE11/20/2025
DOB NOWSuspended ScaffoldSigned-offPrecision Hoist & Scaffol09/23/2025
DOB NOWPlumbingPermit IssuedPipe Solutions Advis08/01/2025
DOB NOWStructuralSigned-offB T General Builders07/24/2025
DOB NOWSidewalk ShedSigned-offPrecision Hoist & Scaffo*07/22/2025
DOB NOWSprinklersSigned-offTristate Fire Sprinkler07/21/2025
DOB NOWCurb CutSigned-offB T General Builders07/18/2025
DOB NOWSupported ScaffoldSigned-offPrecision Hoist & Scaffo*07/15/2025
DOB NOWFoundationSigned-offB T General Builders04/09/2025
DOB NOWConstruction FenceSigned-offB T General Builders04/08/2025
DOB NOWGeneral ConstructionPermit IssuedB T General Builders04/07/2025
DOB NOWSupport of ExcavationSigned-offB T General Builders04/07/2025
DOB NOWConstruction FenceSigned-offGalaxy Developers12/19/2024
BISOTISSUEDClassic Builders11/03/2021
BISOTISSUEDClassic Builders10/19/2020
BISOTISSUEDClassic Builders03/05/2020
BISOTISSUEDRMCH03/14/2019
BISOTISSUEDRMCH05/18/2018
BISOTISSUEDRMCH03/14/2018
BISOTISSUEDMoo Goong Hwa Awning12/12/1996
BISPLISSUEDLloyd G Drummond Plumbing & Gen07/02/1996
BISOTISSUEDXin Construction07/02/1996
BISOTISSUEDXin Construction09/20/1995
BISEQISSUEDXin Construction09/20/1995
1 project · most recent 07/27/2026
Air Conditioning Systems Heating Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/27/2026Permit IssuedB T General BuildersAir Conditioning Systems, Heating Systems, Refrigeration Systems, Ventilation Systems
Cooling
Daikin RZQ18TAVJU 20,000 BTU · Heat Pump Outdoor ×34
RZQ24TAVJU 27,000 BTU · Heat Pump Outdoor ×12
RZQ30TAVJU 34,000 BTU · Vrf Outdoor ×8
RxYQ72xatja 81,000 BTU · Vrf Outdoor ×8
RZQ42TAVJU 47,000 BTU · Vrf Outdoor ×4
Heating
Markel E3323TD-RP 5,120 BTU · Electric Heater ×2
HF3326TD-RP 10,350 BTU · Electric Heater ×2
Trane YSH240 200,000 BTU · Rooftop Unit ×2
YSH300 280,000 BTU · Rooftop Unit ×2
Ventilation
Greenheck CUE-099 1,058 CFM · Exhaust Fan ×40
CUE-130 1,253 CFM · Exhaust Fan ×20
Nutone AEN110 50 CFM · Exhaust Fan ×40
Trane YSH240 7,140 CFM · Rooftop Unit ×2
YSH300 6,285 CFM · Rooftop Unit ×2
Refrigeration
1 project · most recent 07/27/2026
Sprinkler System
FiledStatusContractorScope
07/27/2026Signed-offTristate Fire SprinklerSprinkler System
1 project · most recent 07/27/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/27/2026Permit IssuedPipe Solutions AdvisGas, Storm, Water/Sanitary
5 projects · most recent 04/13/2026
General Wiring
FiledStatusContractorScope
04/13/2026CompleteFirst Quality Electrical—
04/13/2026CompleteFirst Quality ElectricalGeneral Wiring
05/08/2025CompleteHivolts Electrical—
04/27/2025CompleteDenali Electric—
04/16/2018CompleteContact Electric1 meters, 1 new_meters
1 project · most recent 07/27/2026
FiledStatusContractorScope
07/27/2026Permit IssuedB T General Builders1 scope_items
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/11/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/27/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/27/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
03/05/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/26/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
02/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/20/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/25/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 100
DateRequirementInspectorRole
08/19/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
08/19/2026On-Site Private Sewage Disposal Systems InstallationFAHAD FATEHspecial
08/19/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
08/19/2026HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
08/19/2026Maintenance informationFAHAD FATEHenergy_progress
08/19/2026HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
08/19/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
08/19/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/18/2026Fenestration air leakageFAHAD FATEHenergy_progress
08/18/2026Interior lighting powerFAHAD FATEHenergy_progress
08/18/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/18/2026Lighting controlsFAHAD FATEHenergy_progress
08/18/2026MeteringFAHAD FATEHenergy_progress
08/18/2026Protection of exposed foundation insulationFAHAD FATEHenergy_progress
08/18/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
08/18/2026Fenestration areasFAHAD FATEHenergy_progress
08/18/2026Electrical motors and elevatorsFAHAD FATEHenergy_progress
08/18/2026Exterior lighting powerFAHAD FATEHenergy_progress
08/18/2026Air barrier — testing FAHAD FATEHenergy_progress
08/18/2026Concrete - Cast-In-PlaceFAHAD FATEHspecial
08/18/2026Sprayed fire-resistant materialsFAHAD FATEHspecial
08/18/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
08/18/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
08/18/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
08/18/2026Maintenance informationFAHAD FATEHenergy_progress
Latest 25 of 100.
▾Documents — 227 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch25
08/30/2026B00718049-I1Request digital key ↗
08/30/2026B00718049-A1Request digital key ↗
08/30/2026B00718049-Z3Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/21/2026B01249897-I1Request digital key ↗
08/21/2026B01250691-I1Request digital key ↗
08/20/2026B01305702-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/02/2026B00113314-I1Request digital key ↗
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION13
04/17/2025321778536Open ↗
10/22/2024340913630Open ↗
01/17/2019321076205Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION9
11/04/2021321778536Open ↗
10/22/2021321778536Open ↗
05/24/2021321778536Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
05/02/2019321778536Open ↗
07/27/2018321778536Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
10/22/2024340913630Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
10/12/2018321748515Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/14/2026B00718049-A6Open ↗
08/13/2026B00718049-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/14/2026B00718049-A6Open ↗
08/13/2026B00718049-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00718049-I1Open ↗
▸Seals & Professional Certifications83
▸DOB NOWSpecial Inspector Seal & Signature27
09/30/2026B00718049-A3Open ↗
09/29/2026B00718049-S4Open ↗
09/25/2026B00718049-S7Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
09/02/2026B00113314-I1Open ↗
08/30/2026B00718049-Z3Open ↗
08/23/2026B01151217-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/30/2026B00718049-A3Open ↗
09/30/2026B00718049-A3Open ↗
09/29/2026B00718049-S4Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
05/07/2019321778536Open ↗
05/21/2018321748515Open ↗
05/18/2018321748515Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/14/2018321778536Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/22/2024340913630Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/14/2018321778536Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/22/2024340913630Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/14/2026B00718049-A6Open ↗
08/13/2026B00718049-I1Open ↗
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST2
10/22/2024340913630Open ↗
08/23/2018321748490Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
05/21/2018321748515Open ↗
03/14/2018321778536Open ↗
▸DOB NOWStreet Tree Checklist2
08/30/2026B00718049-I1Open ↗
08/30/2026B00718049-A6Open ↗
▸BISBPP: STREET TREES SITE PLAN1
01/07/2025340913630Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00718049-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00718049-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00718049-I1Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/18/2026B00718049-P7Open ↗
08/18/2026B00718049-S4Open ↗
08/18/2026B00718049-S6Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
05/21/2018321748515Open ↗
03/14/2018321778536Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
05/21/2018321748515Open ↗
05/18/2018321748515Open ↗
03/14/2018321778536Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/17/2022321748515Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/17/2022321748515Open ↗
▸Inspections & Test Reports6
▸BISSOIL REPORT2
03/14/2018321778536Open ↗
03/14/2018321778536Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
03/14/2018321778536Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
06/17/2022321748515Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
03/14/2018321778536Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/17/2022321748515Open ↗
▸Approvals, Objections & Sign-offs6
▸BISSCHEDULE A - OCCUPANCY / USE2
06/12/2018321748490Open ↗
05/11/2018321748490Open ↗
▸BISSUPERSEDING LETTER2
05/24/2021321778536Open ↗
05/12/2021321778536Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/14/2018321778536Open ↗
▸BISFINAL1
06/17/2022321748515Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
05/21/2018321748515Open ↗
03/14/2018321778536Open ↗
▸Filing & Intake Forms12
▸BISEFILING COVER SHEET5
01/17/2019321076205Open ↗
06/20/2018321748490Open ↗
05/21/2018321748515Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION4
08/13/2018321778536Open ↗
07/26/2018321778536Open ↗
05/29/2018321748515Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
01/17/2019321076205Open ↗
01/17/2019321076205Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/22/2024340913630Open ↗
▸Other Documents23
▸BISBPP - SUPPORTING DOCUMENTATION6
12/11/2024340913630Open ↗
12/11/2024340913630Open ↗
12/11/2024340913630Open ↗
Showing 3 of 6 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
05/18/2018321748515Open ↗
03/14/2018321778536Open ↗
▸DOB NOWSite Survey: Initial2
08/30/2026B00718049-I1Open ↗
08/14/2026B00718049-A6Open ↗
▸DOB NOWCalculations2
08/13/2026B01276174-I1Open ↗
08/13/2026B01316760-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/14/2026B00718049-A6Open ↗
08/13/2026B00718049-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00718049-S8Open ↗
08/13/2026B00718049-S6Open ↗
▸DOB NOWProperty Ownership Certification2
08/18/2026B00718049-I1Open ↗
08/14/2026B00718049-A6Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026B01276174-I1Open ↗
08/13/2026B01316760-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
03/14/2018321778536Open ↗
▸BISCOMMUNITY BOARD NOTIFICATION1
05/18/2018321748515Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00718049-I1Open ↗