2 Open Violations 0 unresolved · 2 paperwork only▸
ECB01/23/2003FAILURE TO MAINTAIN PLUMBING OR APPURTENANCES HAZARDOUS. SEPTIC TANK OVER LOWING RAW SEWAGE ONTO SIDEWALK AND INTO STREET. REMEDY: MAINTAIN SEPTIC TANK AS PER DEPT SATISFACTION FORTWITH.Nothing owed — awaiting certificate of correction
ECB10/15/1998WORK WITHOUT A PERMIT. WORK NOTED: IN THAT A WOODEN DECK HAD BEEN CONSTRUCTED IN REAR YARD (APPROX SIZE 15'X20') WOODEN DECK IS CONSTRUCTED AROUND A 18FT POOL. REMEDY: OBTAIN A PERMIT IF FEASIBLE OR RESTORE TONothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 7,875 sf lot · 0.19 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.