Elevator apt, semi-fireproof without stores
404 EAST 88 STREET
MANHATTAN · Upper East Side-Yorkville · BIN 1050605
💬 Discuss this project
1930Year Built
6Stories
D1Building Class
R8BZoning
21,078 sfGross Floor Area
49Units
Rent Stabilized5 Open Violations ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: 404-406 EAST 88TH ST LLC · 5,136 sf lot · 4.1 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS1207/08/2026
HUBB NYC PROPERTIES907/08/2026
RENNON CONSTRUCTION607/08/2026
404-406 EAST 88TH ST1803/22/2026
ECI CONTRACTING203/22/2026
404 E 88 REALTY903/22/2026
404 EAST 88 LLC203/22/2026
FANNIE KLEIN REALTY103/22/2026
404 EAST 88 REALTY3603/22/2026
404 E 88TH STREET1903/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/23/2014$19.2M—— → —$913/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIMKUS NEW YORK PLLC203/28/2025
ASHRAF CORP103/27/2025
HAIDER ENGINEERING, P.E.311/06/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOMBARDO BUILDING CONSULTANTS103/21/2026
RIMKUS NEW YORK PLLC403/21/2026
HAIDER ENGINEERING, P.E.303/21/2026
HAIDER ENGINEERING P E303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & G CONSTRUCTION SVCSGeneral Contractor607/08/2026
BK CONSTRUCTION SVCS INCGeneral Contractor303/21/2026
ALEXANDER EUGENEElectrical103/21/2026
DENNISON ELECTRIC CORPElectrical103/22/2026
RENNON CONSTRUCTION CORPGeneral Contractor107/08/2026
SKYLINE RESTORATION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LOMBARDO PROF ENGINEERING8566104/08/2025
RIMKUS NEW YORK, PLLC8123203/28/2025
Building Lifecycle
All (98)Filed (7)Permit Issued (8)Signed Off (3)Facade (FISP) (12)Violation (60)Special Inspection (8)
03/11/2026
Violation issued (ECB, open)
Construction
03/11/2026
Violation issued (ECB, open)
Construction
11/17/2025
Violation issued (HPD, closed)
I
09/15/2025
Cycle 9 facade report submitted
09/15/2025
Cycle 9 facade report signed — SAFE
09/08/2025
Signed off — Alteration
Exterior facade repairs and repointing as necessary. No change in use, occupancy or egress proposed under this application.
M01178372-I1
08/24/2025
Violation issued (HPD, open)
B
08/24/2025
Violation issued (HPD, open)
A
07/18/2025
Cycle 9 facade inspection completed
07/02/2025
Signed off — Alteration
INSTALLATION OF 60' NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01201866-I1
06/04/2025
Violation issued (HPD, closed)
A
04/22/2025
Permit issued — Sidewalk Shed
M01201866-I1-SH
04/15/2025
Permit issued — Suspended Scaffold
M01202689-I1-SC
04/08/2025
Filed — Alteration
M01202689-I1
04/02/2025
Permit issued — General Construction
M01178372-I1-GC
03/31/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
WILLIAM DAVIS
03/31/2025
Special inspection requirement — Masonry
WILLIAM DAVIS
03/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
WILLIAM DAVIS
03/31/2025
Special inspection requirement — Final
WILLIAM DAVIS
03/28/2025
Filed — Alteration
Exterior facade repairs and repointing as necessary. No change in use, occupancy or egress proposed under this application.
M01178372-P1
03/28/2025
Permit issued — Sidewalk Shed
M01201866-I1-SH
03/28/2025
Special inspection requirement — Masonry
WILLIAM DAVIS
03/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
WILLIAM DAVIS
03/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/28/2025
Special inspection requirement — Final
WILLIAM DAVIS
03/27/2025
Filed — Alteration
INSTALLATION OF 60' NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01201866-I1
03/19/2025
Filed — Alteration
Exterior facade repairs and repointing as necessary. No change in use, occupancy or egress proposed under this application.
M01178372-I1
08/07/2023
Cycle 9 facade report submitted
08/03/2023
Cycle 9 facade report signed — SWARMP
08/01/2023
Cycle 9 facade inspection completed
02/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/15/2022
Violation issued (HPD, closed)
A
04/01/2021
Violation issued (HPD, closed)
A
07/05/2019
Cycle 8 facade report signed — SAFE
05/29/2019
Cycle 8 facade report submitted
05/22/2019
Cycle 8 facade inspection completed
05/10/2019
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00059230-I1
12/18/2018
Permit issued — Supported Scaffold
M00059230-I1-SF
12/18/2018
Permit issued — Sidewalk Shed
M00032329-I1-SH
11/06/2018
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00032329-P1
10/30/2018
Violation issued (ECB, closed)
Construction
10/30/2018
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
10/30/2018
Violation issued (ECB, closed)
Construction
10/30/2018
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
10/09/2018
Violation issued (HPD, closed)
I
08/08/2018
Violation issued (HPD, closed)
B
08/02/2018
Violation issued (ECB, closed)
Construction
07/31/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/30/2018
Permit issued — Supported Scaffold
M00059230-I1-SF
07/27/2018
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00059230-I1
06/27/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/04/2018
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M00032329-I1
04/04/2018
Permit issued — Sidewalk Shed
M00032329-I1-SH
04/04/2018
Violation issued (HPD, closed)
C
04/04/2018
Violation issued (HPD, closed)
A
03/27/2018
Violation issued (ECB, closed)
Construction
03/27/2018
Violation issued (ECB, closed)
Construction
03/23/2018
Cycle 8 facade report submitted
03/23/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/22/2018
Cycle 8 facade report signed — UNSAFE
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offBK CONSTRUCTION SVCS INC04/22/2025
DOB NOWSuspended ScaffoldPermit IssuedSKYLINE RESTORATION INC04/15/2025
DOB NOWGeneral ConstructionSigned-offSKYLINE RESTORATION INC04/02/2025
DOB NOWSidewalk ShedSigned-offRENNON CONSTRUCTION CORP03/28/2025
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS12/18/2018
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS12/18/2018
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS07/30/2018
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS04/04/2018
BISPLISSUEDR.J.C. MECHANICAL CORP02/12/2020
BISOTISSUEDECI CONTRACTING LLC08/03/2018
BISPLISSUEDORBIT PLBG & HTG INC07/05/2018
BISOTISSUEDTRIDENT RESTORATION INC07/03/2018
BIS—ISSUEDECI CONTRACTING LLC07/03/2018
BISPLISSUEDORBIT PLBG & HTG INC03/13/2018
BISOTISSUEDTRIDENT RESTORATION INC02/20/2018
BISPLISSUEDORBIT PLBG & HTG INC04/10/2017
BISOTRE-ISSUEDTRIDENT RESTORATION INC03/29/2017
BISOTISSUEDTRIDENT RESTORATION INC12/07/2016
BISPLISSUEDORBIT PLBG & HTG INC12/02/2016
BISMHISSUEDTRIDENT RESTORATION INC11/21/2016
BISOTISSUEDTRIDENT RESTORATION INC11/01/2016
BISPLISSUEDR.J.C. MECHANICAL CORP08/08/2016
BISPLISSUED24 SEVEN PLUMBING INC07/25/2016
BISOTISSUEDNEW YORK LOGIC, INC04/18/2016
BIS—ISSUEDECI CONTRACTING LLC09/21/2015
BISPLISSUEDTESTERMAN PLBG & HTG INC02/23/2015
BISPLISSUEDTESTERMAN PLBG & HTG INC02/23/2015
BISPLISSUEDTESTERMAN PLBG & HTG INC02/23/2015
BISPLISSUEDRAPTOR MECHANICAL,INC04/09/2013
BISOTISSUEDBERNARDINI BLDRS ENT INC01/09/2013
BISOTISSUEDBERNARDINI BLDRS ENT INC01/09/2013
BISOTISSUEDBERNARDINI BLDRS ENT INC01/09/2013
BISPLISSUEDTMS PLMBG & HTG CORP10/26/2012
BISPLISSUEDTMS PLMBG & HTG CORP10/23/2012
BISOTISSUEDBERNARDINI BLDRS ENT INC10/11/2012
BISOTISSUEDBERNARDINI BLDRS ENT INC10/04/2012
BISOTISSUEDBERNARDINI BLDRS ENT INC09/19/2012
BISPLISSUEDBELL FUEL OIL, LLC07/25/2012
BISBLISSUEDBELL FUEL OIL, LLC07/25/2012
BISOTISSUEDBERNARDINI BLDRS ENT INC05/12/2011
+ 18 more permits on file
8 projects · most recent 06/01/2026
General Wiring
FiledStatusContractorScope
06/01/2026Permit IssuedWCK ELECTRIC CORP.General Wiring
06/01/2026Permit IssuedWCK ELECTRIC CORP.General Wiring
06/01/2026Permit IssuedWCK ELECTRIC CORP.General Wiring
05/05/2025Permit IssuedHIGH QUALITY ELEC.OF NYC—
08/17/2022CompleteCENTENNIAL ELEVATOR INDUSGeneral Wiring
10/16/2018CompleteDENNISON ELECTRIC CORPGeneral Wiring
04/03/2018CompleteWCK ELECTRIC CORP.—
03/16/2018CompleteDENNISON ELECTRIC CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
03/31/2025Structural Stability – Alterations of existing buildingsWILLIAM DAVISspecial
03/31/2025MasonryWILLIAM DAVISspecial
03/31/2025Tenant Protection Plan ComplianceWILLIAM DAVISspecial
03/31/2025FinalWILLIAM DAVISprogress
03/28/2025MasonryWILLIAM DAVISspecial
03/28/2025Structural Stability – Alterations of existing buildingsWILLIAM DAVISspecial
03/28/2025Tenant Protection Plan Compliance—special
03/28/2025FinalWILLIAM DAVISprogress
▾Documents — 579 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/06/2026M00032329-I1Request digital key ↗
09/06/2026M00032329-P1Request digital key ↗
09/06/2026M00059230-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits112
▸BISPLAN / WORK APPROVAL APPLICATION57
08/27/2025121401090Open ↗
08/01/2025121401090Open ↗
06/17/2025121401090Open ↗
Showing 3 of 57 on file for this type
▸BISWORK PERMIT APPLICATION55
02/13/2020121401090Open ↗
08/03/2018123379352Open ↗
07/05/2018123379343Open ↗
Showing 3 of 55 on file for this type
▸Seals & Professional Certifications133
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION68
05/14/2019123379352Open ↗
05/14/2019123379352Open ↗
03/07/2019122919743Open ↗
Showing 3 of 68 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST25
03/06/2019122919743Open ↗
11/05/2018123010776Open ↗
06/26/2018123379343Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
06/26/2018123379343Open ↗
02/21/2018123354495Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/06/2026M00032329-I1Open ↗
09/06/2026M00032329-P1Open ↗
09/06/2026M00059230-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026M01178372-P1Open ↗
08/22/2026M01178372-I1Open ↗
08/22/2026M01178372-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026M01178372-P1Open ↗
08/22/2026M01178372-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment37
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
01/03/2019123379343Open ↗
12/28/2018123379343Open ↗
06/26/2018123379343Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISEQUIPMENT USE PERMITS5
03/07/2019122919743Open ↗
02/04/2019123379343Open ↗
02/04/2019123379343Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
03/07/2019122919743Open ↗
02/04/2019123379343Open ↗
01/10/2019123010776Open ↗
▸Safety & Tenant Protection10
▸BISTenant Protection Plan and Notes8
06/27/2018123379352Open ↗
06/26/2018123379343Open ↗
02/21/2018123354495Open ↗
Showing 3 of 8 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos35
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)13
08/09/2018123379352Open ↗
06/26/2018123379343Open ↗
02/21/2018123354495Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026M01178372-P1Open ↗
08/13/2026M01178372-I1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/03/2018123379352Open ↗
▸Energy Compliance42
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS25
05/14/2019123379352Open ↗
03/07/2019122919743Open ↗
02/04/2019123379343Open ↗
Showing 3 of 25 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
05/14/2019123379352Open ↗
03/07/2019122919743Open ↗
02/04/2019123379343Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/19/2025121401090Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
09/02/2025121401090Open ↗
09/02/2025121401090Open ↗
09/02/2025121401090Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs69
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST37
09/02/2025121401090Open ↗
02/04/2021104573481Open ↗
11/13/2020104573481Open ↗
Showing 3 of 37 on file for this type
▸BISADMINISTRATIVE OBJECTIONS17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
04/11/2023104573481Open ↗
09/18/2017140523789Open ↗
Showing 2 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
05/28/2019104573481Open ↗
Showing 1 of 4 on file for this type
▸BISFINAL1
09/02/2025121401090Open ↗
▸BISSUPERSEDING LETTER1
02/13/2020121401090Open ↗
▸Cost, Insurance & Ownership55
▸BISCOST AFFIDAVIT47
05/14/2019123379352Open ↗
03/07/2019122919743Open ↗
02/04/2019123379343Open ↗
Showing 3 of 47 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
08/27/2025121401090Open ↗
▸Filing & Intake Forms64
▸BISBOROUGH INTAKE FORM26
03/06/2020104573481Open ↗
02/06/2020104573481Open ↗
02/06/2020104573481Open ↗
Showing 3 of 26 on file for this type
▸BISEFILING COVER SHEET20
06/27/2018123379352Open ↗
06/26/2018123379343Open ↗
02/21/2018123354495Open ↗
Showing 3 of 20 on file for this type
▸BISADDITIONAL INFORMATION14
08/27/2025121401090Open ↗
06/05/2025104573481Open ↗
03/06/2019122919743Open ↗
Showing 3 of 14 on file for this type
▸BISeFiling Job Application Cover Sheet4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
05/27/2025104573481Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWBSA Meeting Minutes/BSA Resolution2
09/06/2026M00032329-P1Open ↗
09/06/2026M00032329-I1Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M01202689-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01202689-I1Open ↗