← Back
BuildNYC
Office only, 2-6 stories
East New York SNAP Center/ MICSA
404 PINE STREET · BIN 3094690
💬 Discuss this project
1969Year Built
4Stories
O2Building Class
R7AZoning
60,180 sfGross Floor Area
1Units
LL97 Covered0 Active ViolationsFDNY Report ↗
Office only, 2-6 stories · Owner of record: 404 Pine Realty · 20,000 sf lot · 3.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof404 Pine Street Realty LLC7p · 1 filing · 10 docs
BulkheadUjima High School1p · 1 filing · 9 docs
Floor 4Ujima High School, Achievement First Accepted Ujima High Sch40p · 6 filings · 18 docs
Floor 3Ujima High School, Achievement First Accepted Ujima High Sch40p · 6 filings · 18 docs
Floor 2Ujima High School, Achievement First Accepted Ujima High Sch41p · 6 filings · 18 docs
Floor 1Ujima High School, Achievement First Accepted Ujima High Sch45p · 8 filings · 18 docs
Site & exterior404 Pine Street Realty LLC5p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
404 Pine Street Realty3410/07/2026
MP 404903/21/2026
Euclid Ave Associates503/21/2026
Isis Properties303/21/2026
404 Pine Street LLC Attn Lineage103/21/2026
Lineage Properties103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Method Design Architecture + Urbani610/06/2026
New Age707/31/2026
Structural Engineering Buro205/03/2022
Syed Engineering104/26/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediting103/21/2026
Municipal Building Consultants1103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tab RestorationsGeneral Contractor603/21/2026
I.H. 1 ConstructionGeneral Contractor507/08/2026
Kaj NY ConstructionScaffold303/21/2026
Dependable MechanicalFire Protection207/08/2026
A&H Express Plumbing & HeatingPlumbing207/08/2026
NychraElectrical203/21/2026
I.H. 1 ConstructionScaffold104/08/2026
Department of Social ServicesElectrical103/21/2026
Kwong Ming ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Method Design Architectur5713410/06/2026
New Age Engineering7746707/31/2026
Structural Engineering BU5883205/03/2022
Building Lifecycle
All (163)Filed (16)Permit Issued (11)Signed Off (3)Violation (60)Inspection (4)Objection (39)Special Inspection (30)
10/20/2026
Objection resolved — Resolved
10/16/2026
Objection raised — Other
10/15/2026
Objection raised — Other
10/06/2026
Filed — Alteration CO
ALT -CO APPLICATION FILED FOR CHANGE IN USE AND OCCUPANCY FOR FLOORS 1-4 FROM OFFICE (UG4) TO EDUCATION (UG IIIB).
B01181722-P2
10/05/2026
Special inspection requirement — Metering
Stephen Shishko
10/05/2026
Special inspection requirement — Interior lighting power
Demetrios Comodromos
10/05/2026
Special inspection requirement — Lighting controls
Stephen Shishko
10/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Stephen Shishko
10/05/2026
Special inspection requirement — Insulation placement and R values
Stephen Shishko
10/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Demetrios Comodromos
10/05/2026
Special inspection requirement — Energy Code Compliance Inspections
Demetrios Comodromos
10/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
Demetrios Comodromos
10/05/2026
Special inspection requirement — Air barrier - visual inspection
Demetrios Comodromos
10/05/2026
Special inspection requirement — Fenestration areas
Stephen Shishko
10/05/2026
Special inspection requirement — Fenestration air leakage
Stephen Shishko
07/31/2026
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH.
B01211437-P2
07/31/2026
Special inspection requirement — Sprinkler Systems
Stephen Shishko
07/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
07/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
07/29/2026
Special inspection requirement — Sprinkler Systems
Stephen Shishko
02/06/2026
Permit issued — Sprinklers
B01211437-I1-EW-SP
02/06/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
01/21/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
01/06/2026
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH.
B01211437-P1
01/05/2026
Special inspection requirement — Sprinkler Systems
Stephen Shishko
01/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
12/15/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/12/2025
Permit issued — Standpipe
B01328044-I1-EW-SD
12/04/2025
Filed — Alteration
Standpipe application file to remove the Fire Hose Racks and install Fire Hose Cabinets on the 1st floor.
B01328044-I1
12/04/2025
Filed — Alteration
INSTALL NEW HVAC VRF SYSTEM AND MODIFY EXISTING HVAC SYSTEM. INSTALL ASSOCIATED DUCTS & PIPING AS PER PLANS. INSTALLATION OF NEW COMMERCIAL TYPE I KITCHEN HOOD AND KITCHEN EXHAUST.
B01211459-P1
12/03/2025
Special inspection requirement — Standpipe Systems
Stephen Shishko
12/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/24/2025
Signed off — Alteration
INTERIOR DEMOLITION OF EXISTING CONSTRUCTIONS ON FLOORS 1-4 OF 404 PINE STREET, BROOKLYN, NY 11208
B01181730-I1
10/09/2025
Objection raised — Fire_Protection
10/09/2025
Objection resolved — Addressed
10/08/2025
Special inspection requirement — Maintenance information
Stephen Shishko
10/08/2025
Special inspection requirement — Ventilation and air distribution system
Stephen Shishko
10/08/2025
Special inspection requirement — Mechanical Systems
Stephen Shishko
10/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
10/08/2025
Special inspection requirement — Final
Stephen Shishko
10/08/2025
Special inspection requirement — Duct leakage testing, insulation and design
Stephen Shishko
10/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
10/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
10/08/2025
Special inspection requirement — Shutoff dampers
Stephen Shishko
10/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
10/06/2025
Permit issued — Construction Fence
B01289815-I1-FN
09/27/2025
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
B01289815-I1
09/27/2025
Filed — No Work
B01284110-I1
09/19/2025
Permit issued — Plumbing
B01211451-I1-PL
09/17/2025
Permit issued — Mechanical Systems
B01211459-I1-MS
09/17/2025
Special inspection requirement — Fenestration air leakage
Stephen Shishko
09/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Demetrios Comodromos
09/16/2025
Objection raised — Zoning
09/16/2025
Objection resolved — Addressed
09/02/2025
Objection resolved — Addressed
08/28/2025
Objection raised — Admin
08/19/2025
Filed — Alteration CO
ALT -CO APPLICATION FILED FOR CHANGE IN USE AND OCCUPANCY FOR FLOORS 1-4 FROM OFFICE (UG4) TO EDUCATION (UG IIIB).
B01181722-P1
08/15/2025
Permit issued — General Construction
B01181722-I1-GC
05/13/2025
Permit issued — Sprinklers
B01211437-I1-EW-SP
Latest 60 of 163 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offDependable Mechanical02/06/2026
DOB NOWStandpipeSigned-offA&H Express Plumbing & Heating12/12/2025
DOB NOWConstruction FencePermit IssuedI.H. 1 Construction10/06/2025
DOB NOWPlumbingSigned-offA&H Express Plumbing & Heating09/19/2025
DOB NOWMechanical SystemsPermit IssuedI.H. 1 Construction09/17/2025
DOB NOWGeneral ConstructionPermit IssuedI.H. 1 Construction08/15/2025
DOB NOWSprinklersSigned-offDependable Mechanical05/13/2025
DOB NOWGeneral ConstructionSigned-offI.H. 1 Construction04/30/2025
DOB NOWGeneral ConstructionSigned-offTab Restorations07/28/2021
DOB NOWGeneral ConstructionSigned-offTab Restorations05/02/2021
DOB NOWSidewalk ShedSigned-offKaj NY Construction04/27/2021
BISOTISSUEDNYC Human Resources Admin09/27/2018
BISPLISSUEDBell Fuel Oil11/10/2017
BISBLISSUEDBell Fuel Oil11/10/2017
BISPLISSUEDPaulka Plumbing & Heating06/21/2017
BISOTISSUEDNYC Human Resources Admin10/31/2016
BISMHISSUEDMaster Mechanical10/28/2015
BISMHISSUEDMaster Mechanical10/21/2015
BISOTISSUEDNYC Human Resources Admin11/30/2009
BISMHISSUEDNYC Human Resources Admin11/30/2009
BISMHISSUEDBeni Construction02/20/2008
BISOTISSUEDNew York City/Human Resour Admin07/05/2000
BISPLISSUEDMetro04/28/2000
BISOTISSUEDUltimate Construction03/27/2000
1 project · most recent 12/04/2025
Heating and Air Conditioning Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/04/2025Permit IssuedI.H. 1 ConstructionHeating and Air Conditioning Systems, Refrigeration Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PLFY-EP06NEMU1 6,700 BTU · Vrf Indoor ×90
PLFY-EP15NEMU1 17,000 BTU · Vrf Indoor ×60
PLFY-EP12NEMU1 13,500 BTU · Vrf Indoor ×46
PLFY-EP18NEMU1 20,000 BTU · Vrf Indoor ×24
PURY-EP192TNU-A1 16 tons · Vrf Outdoor ×12
PLFY-EP08NEMU1 9,000 BTU · Vrf Indoor ×6
PUY-A12NKA7 1 tons · Condensing Unit ×4
Ventilation
Panasonic F-0510VS1 100 CFM · Exhaust Fan ×44
FV-0511VQ1 111 CFM · Exhaust Fan ×8
Mitsubishi Electric LGH-F600RVX2-E 600 CFM · Erv ×42
Captiveaire 6024 ND-2-PSP-F 1,800 CFM · Kitchen Exhaust ×4
USBI120DD-RM 3,600 CFM · Kitchen Exhaust ×2
Accurex XMSX-P112-H12-MF 3,100 CFM · Makeup Air ×2
Carnes BE24B 2,500 CFM · Exhaust Fan ×2
Refrigeration
Americooler BEL0060AS6AMAB0200 7,800 BTU · Refrigeration Unit ×2
BEL0100BSE6EEAB0200 9,900 BTU · Refrigeration Unit ×2
Bohn BCH0035LBACZA0000 11,185 BTU · Refrigeration Unit ×2
2 projects · most recent 07/31/2026
FiledStatusContractorScope
07/31/2026Signed-offA&H Express Plumbing & Heating1,509 heads
12/04/2025——10 outlets
3 projects · most recent 07/31/2026
Water/Sanitary
FiledStatusContractorScope
07/31/2026———
12/04/2025Signed-offDependable Mechanical—
04/30/2025Signed-offDependable MechanicalWater/Sanitary
2 projects · most recent 06/13/2025
General Wiring
FiledStatusContractorScope
06/13/2025Permit IssuedKwong Ming ElectricGeneral Wiring
04/22/2021Permit IssuedRichard Neu—
1 project · most recent 09/27/2025
Fence
FiledStatusContractorScope
09/27/2025Permit IssuedI.H. 1 ConstructionFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/06/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
01/21/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
12/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
10/05/2026MeteringStephen Shishkoenergy_progress
10/05/2026Interior lighting powerDemetrios Comodromosenergy_progress
10/05/2026Lighting controlsStephen Shishkoenergy_progress
10/05/2026Fenestration and door U-factor and product ratingsStephen Shishkoenergy_progress
10/05/2026Insulation placement and R valuesStephen Shishkoenergy_progress
10/05/2026Fire-Resistant Penetrations and JointsDemetrios Comodromosspecial
10/05/2026Energy Code Compliance InspectionsDemetrios Comodromosprogress
10/05/2026Fire-Resistance Rated ConstructionDemetrios Comodromosprogress
10/05/2026Air barrier - visual inspectionDemetrios Comodromosenergy_progress
10/05/2026Fenestration areasStephen Shishkoenergy_progress
10/05/2026Fenestration air leakageStephen Shishkoenergy_progress
07/31/2026Sprinkler SystemsStephen Shishkospecial
07/31/2026Fire-Resistant Penetrations and JointsStephen Shishkospecial
07/29/2026Fire-Resistant Penetrations and JointsStephen Shishkospecial
07/29/2026Sprinkler SystemsStephen Shishkospecial
01/05/2026Sprinkler SystemsStephen Shishkospecial
01/05/2026Fire-Resistant Penetrations and JointsStephen Shishkospecial
12/03/2025Standpipe SystemsStephen Shishkospecial
10/08/2025Maintenance informationStephen Shishkoenergy_progress
10/08/2025Ventilation and air distribution systemStephen Shishkoenergy_progress
10/08/2025Mechanical SystemsStephen Shishkospecial
10/08/2025Fire-Resistant Penetrations and JointsStephen Shishkospecial
10/08/2025FinalStephen Shishkoprogress
10/08/2025Duct leakage testing, insulation and designStephen Shishkoenergy_progress
10/08/2025HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
Latest 25 of 60.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Ujima High SchoolEducationFloors 1–4
Project B01328044 Alteration · Permit Entire · 12/04/2025
Project B01211451 Alteration · Permit Entire · 04/30/2025
Project B01211437 Alteration · Permit Entire · 04/23/2025
Achievement First Accepted Ujima High SchoolEducationFloors 1–4
Project B01181730 Alteration · LOC Issued · 04/14/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 233 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch12
09/01/2026B00509044-I1Request digital key ↗
08/21/2026B01181730-I1Request digital key ↗
08/21/2026B01211437-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/01/2026B00467925-I1Request digital key ↗
09/01/2026B00467925-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/20/2026B01284110-I1Request digital key ↗
▸Applications & Permits26
▸BISPLAN / WORK APPROVAL APPLICATION12
06/11/2018340514759Open ↗
06/05/2018340514759Open ↗
11/29/2017321258580Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION12
09/27/2018340514759Open ↗
11/08/2017340560789Open ↗
11/08/2017340560789Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/17/2017340505518Open ↗
▸DOB NOWHPD - Permit Notice1
08/13/2026B00467925-I1Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp3
10/08/2026B01181722-P2Open ↗
08/13/2026B01181722-I1Open ↗
08/13/2026B01181722-P1Open ↗
▸Seals & Professional Certifications75
▸DOB NOWProgress Inspector Seal & Signature24
10/08/2026B01181722-P2Open ↗
10/08/2026B01181722-P2Open ↗
10/08/2026B01181722-P2Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
10/08/2026B01181722-P2Open ↗
09/01/2026B00467925-I1Open ↗
09/01/2026B00467925-P1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
10/24/2018321258580Open ↗
06/08/2018340560789Open ↗
11/01/2016321258580Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
10/08/2026B01181722-P2Open ↗
10/03/2026B01211451-I1Open ↗
09/28/2026B01211437-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
11/08/2017340560789Open ↗
06/02/2017340505518Open ↗
10/26/2015321259650Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
02/17/2016321259650Open ↗
10/26/2015321259650Open ↗
01/23/2008310071061Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/08/2017340560789Open ↗
06/02/2017340505518Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/08/2017340560789Open ↗
06/02/2017340505518Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/20/2017340514759Open ↗
▸BISPC FULL REPORT1
01/23/2008310071061Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
01/23/2008310071061Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING3
11/08/2017340560789Open ↗
06/02/2017340505518Open ↗
08/18/2009320056577Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT3
03/07/2016321259650Open ↗
03/07/2016321259650Open ↗
03/14/2008310071061Open ↗
▸BISEQUIPMENT USE PERMITS2
03/07/2016321259650Open ↗
03/14/2008310071061Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/08/2017340560789Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
06/07/2018321571483Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
10/08/2026B01181722-P2Open ↗
08/13/2026B01181722-I1Open ↗
08/13/2026B01181722-P1Open ↗
▸Environmental & Asbestos36
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
10/08/2026B01181722-P2Open ↗
09/01/2026B00467925-P1Open ↗
09/01/2026B00467925-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWOER: Notice to Proceed7
10/08/2026B01181722-P2Open ↗
08/13/2026B01211451-I1Open ↗
08/13/2026B01181722-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
04/09/2018340514759Open ↗
11/08/2017340560789Open ↗
06/02/2017340505518Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction5
10/08/2026B01181722-P2Open ↗
08/22/2026B01181722-I1Open ↗
08/21/2026B01211459-I1Open ↗
Showing 3 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
06/07/2018340514759Open ↗
11/08/2017340560789Open ↗
06/02/2017340505518Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
08/05/2021340514759Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/23/2008310071061Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/18/2009320056577Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
10/24/2018321258580Open ↗
06/08/2018340560789Open ↗
11/01/2016321258580Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
08/05/2021340514759Open ↗
10/24/2018321258580Open ↗
06/08/2018340560789Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/05/2021340514759Open ↗
09/24/2018340514759Open ↗
11/08/2017340560789Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/08/2017340560789Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/21/2026B01211459-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00467925-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/05/2021340514759Open ↗
09/24/2018340514759Open ↗
04/09/2018340514759Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
10/24/2018321258580Open ↗
06/08/2018340560789Open ↗
03/07/2016321259650Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
10/08/2026B01181722-P2Open ↗
08/13/2026B01181722-I1Open ↗
08/13/2026B01181722-P1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/05/2021340514759Open ↗
06/08/2018340560789Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
08/18/2009320056577Open ↗
01/23/2008310071061Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT11
10/24/2018321258580Open ↗
06/08/2018340560789Open ↗
11/08/2017340560789Open ↗
Showing 3 of 11 on file for this type
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST1
11/01/2016321258580Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/05/2021340514759Open ↗
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET5
05/10/2017321571483Open ↗
10/06/2016321258580Open ↗
10/26/2015321259650Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION4
06/07/2018340514759Open ↗
04/09/2018340514759Open ↗
11/29/2017321258580Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
11/08/2017340560789Open ↗
07/20/2017340514759Open ↗
06/02/2017340505518Open ↗
▸BISBOROUGH INTAKE FORM3
10/24/2018321258580Open ↗
06/08/2018340560789Open ↗
11/29/2017321258580Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification3
10/08/2026B01181722-P2Open ↗
08/13/2026B01181722-P1Open ↗
08/13/2026B01181722-I1Open ↗
▸DOB NOWAlternate Plan 11
08/20/2026B01284110-I1Open ↗
▸DOB NOWAlternate Plan 21
08/20/2026B01284110-I1Open ↗