Likely answered · the city's own records show a filing, but DOB's feed still lists these as active
DOB06/30/2023Violation issued-failure to file 2021 external low pressure inspectionThe owner has filed since: boiler inspection reports are on file for later years (latest 2026). This one is not shown as answered
DOB06/20/2023Violation issued-failure to file 2018 external low pressure inspectionThe owner has filed since: boiler inspection reports are on file for later years (latest 2026). This one is not shown as answered
DOB06/20/2023Violation issued-failure to file 2019 external low pressure inspectionThe owner has filed since: boiler inspection reports are on file for later years (latest 2026). This one is not shown as answered
DOB04/25/2023Violation issued-failure to file 2022 external low pressure inspectionThe owner has filed since: boiler inspection reports are on file for later years (latest 2026). This one is not shown as answered
DOB11/08/2019Violation issued for failure to file annual boiler 2017 inspection reportThe owner has filed since: boiler inspection reports are on file for later years (latest 2026). This one is not shown as answered
Miscellaneous religious facility · 1.6 FAR built · Flood zone X
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
Nothing on file for this building.
Building Lifecycle
08/25/2026
Boiler inspection report filed
Initial · no defects · Accepted
11/06/2025
Boiler inspection report filed
Initial · no defects · Accepted
04/12/2024
Boiler inspection report filed
Initial · no defects · Accepted
10/25/2023
Boiler inspection report filed
Subsequent · no defects · Accepted
10/03/2023
Boiler inspection report filed
Initial · no defects · Accepted
20 history events on file for this building. Sign in free to see the full history. Sign in · Create account