← Back
Auto body / collision or auto repair
4044A BOSTON ROAD
BRONX · BIN 2096017
💬 Discuss this project
1972Year Built
1Stories
G2Building Class
M1-1Zoning
2,800 sfGross Floor Area
1Units
Auto body / collision or auto repair · Owner of record: KAL & OMAR, LLC · 3,505 sf lot · 0.8 FAR built · Flood zone X
Locations of Work
Plumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction2p · 1 filing · 4 docs
1 job · most recent 04/23/2026
Gas
FiledStatusContractorScope
04/23/2026Permit IssuedCAPE PLUMBING INCGas
Building Lifecycle
All (7)Filed (2)Permit Issued (1)Inspection (4)
04/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/23/2026
Filed — Alteration
REPLACEMENT OF GAS METER ON THE 1ST FLOOR (4046 BOSTON RD.). WORK INCLUDES REPLACEMENT OF GAS METER W/ PIPING, GAS TEST, AND GAS AUTHORIZATION (BLUE CARD) FOR THE UTILITY COMPANY. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.
X01366124-P1
04/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/02/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/30/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/27/2026
Permit issued — Plumbing
X01366124-I1-PL
03/23/2026
Filed — Alteration
REPLACEMENT OF GAS METER ON THE 1ST FLOOR (4046 BOSTON RD.). WORK INCLUDES REPLACEMENT OF GAS METER W/ PIPING, GAS TEST, AND GAS AUTHORIZATION (BLUE CARD) FOR THE UTILITY COMPANY. NO CHANGE IN USE, EGRESS, AND OCCUPANCY UNDER THIS APPLICATION.
X01366124-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
QUICKWASH107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESIGN GROUP IN H&K LLC204/23/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAPE PLUMBING INCPlumbing107/08/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCAPE PLUMBING INC03/27/2026
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/02/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/30/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026X01366124-P1Request digital key ↗
08/16/2026X01366124-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026X01366124-P1Open ↗
08/16/2026X01366124-I1Open ↗