Office only, 1 story
405 91 STREET
BROOKLYN · BIN 3154591
💬 Discuss this project
1964Year Built
1Stories
O1Building Class
C8-2Zoning
10,080 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Office only, 1 story · Owner of record: 405 91 LLC · 7,504 sf lot · 1.34 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionCivil
Roof2p · 2 filings · 20 docs
Floor 110p · 3 filings · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AXION MANAGEMENT707/08/2026
AXIUM CONSTRUCTION2407/08/2026
ALLIED PROPERTIES607/08/2026
WILLIAM SCHNELL 2103/22/2026
452-87TH LLC103/22/2026
405 91 LLC1103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRANKLYN ESTRELLA ARCHITECT PLLC103/21/2026
XPDITE GROUP LLC (104)203/21/2026
CONSTRUCTION PERMIT SERVICES403/21/2026
DOMANI CONSULTING203/21/2026
JAM CONSULTANTS, INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TYLER CONSTRUCTION INCGeneral Contractor407/08/2026
BT'S PLUMBING AND HEATINGPlumbing407/08/2026
VIP FIRE SPRINKLERPlumbing203/22/2026
EXCALIBUR GROUP LLCGeneral Contractor207/08/2026
EMPIRE GENERAL CONTRACTINGeneral Contractor104/08/2026
ALL PURPOSE ELECTRIC CORPElectrical103/22/2026
SJ EMPIRE CORPGeneral Contractor107/08/2026
VIP FIRE SPRINKLER INCFire Protection107/08/2026
CASTLE ELECTRIC GROUP LLCElectrical103/22/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
AXIUM CONSTRUCTION CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616311/15/2025
COLOMBO ARCHITECTURAL STU4930311/14/2025
CROSSCHECK INSPECTION SER544107/09/2025
CHARLES SCHMITT ARCHITECT3719202/24/2020
METRIC CONSULTING AND INS1803101/16/2020
ANS CONSULTANTS, INC.1768112/03/2019
Building Lifecycle
All (114)Filed (13)Permit Issued (10)Signed Off (10)Violation (26)Inspection (5)Objection (20)Special Inspection (30)
12/23/2025
Signed off — Alteration
Tenant fit out of existing office space to accommodate medical offices as per plans filed herewith.
B01188684-S1
12/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
12/20/2025
Special inspection requirement — Mechanical Systems
SHAHRIAR QUAYYUM
12/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
12/20/2025
Special inspection requirement — Final
SHAHRIAR QUAYYUM
12/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
12/20/2025
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
12/19/2025
Signed off — Alteration
Tenant fit out of existing office space to accommodate medical offices as per plans filed herewith.
B01188684-S2
12/08/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/26/2025
Signed off — Alteration
Tenant fit out of existing office space to accommodate medical offices as per plans filed herewith.
B01188684-I1
11/26/2025
Permit issued — Plumbing
B01188684-S2-PL
11/15/2025
Filed — Alteration
Tenant fit out of existing office space to accommodate medical offices as per plans filed herewith.
B01188684-P2
11/14/2025
Filed — Alteration
Tenant fit out of existing office space to accommodate medical offices as per plans filed herewith.
B01188684-S2
11/14/2025
Filed — Alteration
Tenant fit out of existing office space to accommodate medical offices as per plans filed herewith.
B01188684-P1
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yahaira Volquez Colombo
10/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
10/16/2025
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
10/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
10/16/2025
Special inspection requirement — Final
SHAHRIAR QUAYYUM
10/16/2025
Special inspection requirement — Mechanical Systems
SHAHRIAR QUAYYUM
10/14/2025
Signed off — Alteration
B01242391-I1
10/02/2025
Permit issued — Mechanical Systems
B01188684-S1-MS
07/24/2025
Signed off — Alteration
MODIFICATION OF EXISTING SPRINKLER SYSTEM designed as per pipe schedule NFPA-13 2007 Section 11.2.2.3. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00755275-I1
07/18/2025
Permit issued — General Construction
B01242391-I1-GC
07/16/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/09/2025
Filed — Alteration
B01242391-I1
06/27/2025
Objection resolved — Addressed
06/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/19/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/09/2025
Objection resolved — Addressed
06/06/2025
Objection resolved — Addressed
06/06/2025
Objection resolved — Addressed
05/09/2025
Special inspection requirement — Lighting controls
Yahaira Volquez Colombo
05/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yahaira Volquez Colombo
05/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Yahaira Volquez Colombo
05/09/2025
Special inspection requirement — Final
Yahaira Volquez Colombo
05/09/2025
Special inspection requirement — Interior lighting power
Yahaira Volquez Colombo
05/09/2025
Special inspection requirement — Metering
Yahaira Volquez Colombo
05/07/2025
Permit issued — Sprinklers
B00755275-I1-EW-SP
04/23/2025
Objection raised — Fire_Protection
04/23/2025
Objection raised — Inspections
04/23/2025
Objection raised — Mechanical
04/23/2025
Objection raised — Scope
04/10/2025
Filed — Alteration
Tenant fit out of existing office space to accommodate medical offices as per plans filed herewith.
B01188684-S1
03/13/2025
Permit issued — General Construction
B01188684-I1-GC
03/07/2025
Filed — Alteration
Tenant fit out of existing office space to accommodate medical offices as per plans filed herewith.
B01188684-I1
02/09/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/09/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/09/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/09/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/04/2022
Objection resolved — Addressed
10/04/2022
Objection resolved — Addressed
07/19/2022
Objection resolved — Addressed
07/08/2022
Objection resolved — Addressed
Latest 60 of 114 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBT'S PLUMBING AND HEATING11/26/2025
DOB NOWMechanical SystemsSigned-offTYLER CONSTRUCTION INC10/02/2025
DOB NOWGeneral ConstructionSigned-offEMPIRE GENERAL CONTRACTIN07/18/2025
DOB NOWSprinklersSigned-offVIP FIRE SPRINKLER INC05/07/2025
DOB NOWGeneral ConstructionSigned-offTYLER CONSTRUCTION INC03/13/2025
DOB NOWStructuralSigned-offAXIUM CONSTRUCTION02/14/2020
DOB NOWStructuralSigned-offEXCALIBUR GROUP LLC01/13/2020
DOB NOWMechanical SystemsSigned-offEXCALIBUR GROUP LLC09/24/2019
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP09/19/2019
DOB NOWConstruction FenceSigned-offSJ EMPIRE CORP01/29/2019
BISOTISSUEDAXIUM CONSTRUCTION CORP12/24/2021
BIS—ISSUEDAXIUM CONSTRUCTION CORP07/07/2021
BISPLISSUEDPLUMBING PLBG & PLBG CORP03/11/2021
BISPLISSUEDPLUMBING PLBG & PLBG CORP03/11/2021
BIS—ISSUEDAXIUM CONSTRUCTION CORP07/24/2020
BISOTISSUEDAXIUM CONSTRUCTION CORP06/26/2020
BISOTISSUEDAXIUM CONSTRUCTION CORP06/26/2020
BIS—ISSUEDAXIUM CONSTRUCTION CORP06/26/2020
BISMHISSUEDAXIUM CONSTRUCTION CORP06/26/2020
BISPLISSUEDPLUMBING PLBG & PLBG CORP02/10/2020
BISPLISSUEDPLUMBING PLBG & PLBG CORP01/27/2020
BISMHISSUEDAXIUM CONSTRUCTION CORP01/23/2020
BISSPISSUEDUNIVERSAL FIRE SPR LLC01/21/2020
BISOTISSUEDSJ EMPIRE CORP12/31/2018
BISOTISSUEDAXIUM CONSTRUCTION CORP07/26/2018
BISOTISSUEDAXIUM CONSTRUCTION CORP08/25/2017
BISOTISSUEDAXIUM CONSTRUCTION CORP07/14/2016
BISOTISSUEDAXIUM CONSTRUCTION CORP11/12/2015
BISOTISSUEDAXIUM CONSTRUCTION CORP08/04/2014
BISOTISSUEDAXIUM CONSTRUCTION CORP07/05/2013
BISMHISSUEDBEE COOL HVAC02/22/2002
BIS—ISSUEDPAUL SIGNS INS09/22/1994
BISMHISSUEDVICTORY BROTHERS INC.04/07/1994
BISPLISSUEDWOLF PLUMBING & HEATING CORP12/29/1993
BIS—ISSUEDBUDIMEX GEN CONTR INC12/15/1993
5 projects · most recent 04/15/2025
General Wiring
FiledStatusContractorScope
04/15/2025Permit IssuedNEWLAND ELECTRICAL INCGeneral Wiring
11/30/2022Permit IssuedALL PURPOSE ELECTRIC CORPGeneral Wiring
02/11/2020CompleteHEXAGON CONST & ELECL GRPGeneral Wiring
01/28/2020CompleteALL PURPOSE ELECTRIC CORP3 meters, 3 new_meters
11/26/2019CompleteCASTLE ELECTRIC GROUP LLC—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/19/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
12/20/2025HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
12/20/2025Mechanical SystemsSHAHRIAR QUAYYUMspecial
12/20/2025Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
12/20/2025FinalSHAHRIAR QUAYYUMprogress
12/20/2025HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
12/20/2025Maintenance informationSHAHRIAR QUAYYUMenergy_progress
10/16/2025Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
10/16/2025Fire-Resistant Penetrations and JointsYahaira Volquez Colombospecial
10/16/2025HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
10/16/2025Maintenance informationSHAHRIAR QUAYYUMenergy_progress
10/16/2025HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
10/16/2025FinalSHAHRIAR QUAYYUMprogress
10/16/2025Mechanical SystemsSHAHRIAR QUAYYUMspecial
05/09/2025Lighting controlsYahaira Volquez Colomboenergy_progress
05/09/2025Fire-Resistant Penetrations and JointsYahaira Volquez Colombospecial
05/09/2025Energy Code Compliance InspectionsYahaira Volquez Colomboprogress
05/09/2025FinalYahaira Volquez Colomboprogress
05/09/2025Interior lighting powerYahaira Volquez Colomboenergy_progress
05/09/2025MeteringYahaira Volquez Colomboenergy_progress
06/10/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/10/2022Sprinkler SystemsFAHAD FATEHspecial
02/07/2020Shutoff dampersSCOTT FERTIGenergy_progress
02/07/2020Permanent certificateSCOTT FERTIGenergy_progress
02/07/2020Maintenance informationSCOTT FERTIGenergy_progress
02/07/2020HVAC insulation and sealing SCOTT FERTIGenergy_progress
Latest 25 of 39.
▾Documents — 306 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch8
09/02/2026B00095912-I1Request digital key ↗
08/21/2026B01242391-I1Request digital key ↗
08/19/2026B01188684-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00191425-I1Request digital key ↗
08/15/2026B00191425-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/02/2026B00191425-S2Request digital key ↗
09/02/2026B00245882-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00191425-S1Request digital key ↗
▸Applications & Permits55
▸BISPLAN / WORK APPROVAL APPLICATION36
07/23/2024321615374Open ↗
05/28/2024321996630Open ↗
05/23/2024321996630Open ↗
Showing 3 of 36 on file for this type
▸BISWORK PERMIT APPLICATION15
10/05/2020340635272Open ↗
01/27/2020340634193Open ↗
01/23/2020340634193Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
02/29/2020321967323Open ↗
03/14/2019321762320Open ↗
10/12/2018321762320Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/04/2020321615374Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
06/03/2019321615374Open ↗
02/13/2019321615374Open ↗
▸BISZONING DIAGRAM2
06/05/2019321615374Open ↗
06/05/2019321615374Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
02/13/2019321615374Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/13/2019321615374Open ↗
▸Seals & Professional Certifications73
▸DOB NOWProgress Inspector Seal & Signature17
09/01/2026B00191425-P1Open ↗
09/01/2026B00191425-P1Open ↗
09/01/2026B00191425-P1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
03/27/2020321967323Open ↗
03/27/2020321967323Open ↗
03/06/2020321967323Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/02/2026B00095912-I1Open ↗
08/21/2026B01242391-I1Open ↗
08/19/2026B01188684-S2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026B00191425-P1Open ↗
09/01/2026B00191425-P1Open ↗
09/01/2026B00191425-P1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
10/24/2019321996630Open ↗
07/29/2019321967323Open ↗
09/26/2018340635272Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
10/24/2019321996630Open ↗
07/29/2019321967323Open ↗
05/24/2018321762320Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/26/2018340635272Open ↗
09/24/2018340634193Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/26/2018340635272Open ↗
09/21/2018340634193Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment14
▸BISSCHEDULE B - PLUMBING7
03/12/2020340634193Open ↗
01/14/2020340635272Open ↗
01/14/2020340634193Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
03/18/2020340634193Open ↗
01/21/2020340635272Open ↗
01/21/2020340634193Open ↗
Showing 3 of 5 on file for this type
▸BISPLUMBING (PL) SIGNOFF1
01/20/2023340634193Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
07/18/2020321844091Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
01/15/2019321615374Open ↗
Showing 1 of 2 on file for this type
▸BISTenant Protection Plan and Notes1
10/24/2019321996630Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/21/2026B01242391-I1Open ↗
08/19/2026B01188684-P2Open ↗
08/19/2026B01188684-S2Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
10/10/2018321844091Open ↗
09/26/2018340635272Open ↗
09/21/2018340634193Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/13/2026B00191425-S1Open ↗
08/13/2026B00191425-I1Open ↗
08/13/2026B00191425-S2Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/29/2019321967323Open ↗
▸Energy Compliance28
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
03/27/2020321967323Open ↗
10/24/2019321996630Open ↗
07/31/2019321615374Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
07/23/2024321615374Open ↗
07/23/2024321615374Open ↗
11/02/2022321615374Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
12/14/2021321996630Open ↗
03/27/2020321967323Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/04/2022321615374Open ↗
▸BISFENESTRATION AREAS1
08/04/2022321615374Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
08/04/2022321615374Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFENESTRATION AIR LEAKAGE1
08/04/2022321615374Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/21/2018340634193Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
08/04/2022321615374Open ↗
▸BISEXTERIOR LIGHTING POWER1
08/04/2022321615374Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/04/2022321615374Open ↗
▸BISLIGHTING CONTROLS1
08/04/2022321615374Open ↗
▸BISINTERIOR LIGHTING POWER1
08/04/2022321615374Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY11
07/23/2024321615374Open ↗
07/23/2024321615374Open ↗
12/17/2021321996630Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
03/19/2019321762320Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
03/19/2019321762320Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/04/2022321615374Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/04/2022321615374Open ↗
▸Approvals, Objections & Sign-offs19
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
05/18/2022340635272Open ↗
11/05/2020321615374Open ↗
09/10/2020321844091Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
05/14/2020321615374Open ↗
06/14/2019321615374Open ↗
02/13/2019321615374Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
10/02/2018321615374Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT13
03/25/2022340635272Open ↗
12/16/2021340635272Open ↗
12/14/2021321996630Open ↗
Showing 3 of 13 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
08/25/2020321615374Open ↗
07/31/2019321615374Open ↗
01/10/2019321762320Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)3
08/25/2020321615374Open ↗
07/31/2019321615374Open ↗
01/10/2019321762320Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
05/17/2022340635272Open ↗
▸Filing & Intake Forms36
▸BISADDITIONAL INFORMATION15
07/24/2024321615374Open ↗
04/13/2020321615374Open ↗
03/05/2020321967323Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM11
04/24/2020321615374Open ↗
04/03/2020321615374Open ↗
03/27/2020321967323Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET8
10/23/2019321996630Open ↗
07/29/2019321967323Open ↗
10/10/2018321844091Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/26/2018340635272Open ↗
09/21/2018340634193Open ↗
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
02/04/2026321615374Open ↗
02/04/2026321615374Open ↗
09/10/2020321844091Open ↗
▸BISPLOT DIAGRAM3
02/13/2019321615374Open ↗
Showing 1 of 3 on file for this type
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
08/04/2022321615374Open ↗