← Back
Predominantly retail with other uses
406 BRIGHTON BEACH AVE
BROOKLYN · BIN 3245085
💬 Discuss this project
1927Year Built
3Stories
K4Building Class
R6Zoning
3,621 sfGross Floor Area
3Units
Predominantly retail with other uses · Owner of record: 406 OWNER LLC · 1,928 sf lot · 1.88 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
291 OWNER3007/08/2026
JASCO507/08/2026
406 OWNERS CORP103/22/2026
SKYWORX CONTRACTING203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BARRY DONALDSON ARCHITECTS1106/09/2025
ENTHINK ENGINEERS LLC110/13/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COPPER PLUMBING INCPlumbing407/08/2026
GENGRIC DESIGN LLCGeneral Contractor203/21/2026
RICHARD NEUElectrical103/22/2026
JASCO, INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEEL CORE ENGINEERING PL10981006/09/2025
Building Lifecycle
All (59)Filed (12)Permit Issued (6)Signed Off (5)Inspection (6)Special Inspection (30)
11/24/2025
Signed off — Alteration
PROPOSED BOILER WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01095878-S3
11/24/2025
Signed off — Alteration
PROPOSED BOILER WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01095878-S2
11/24/2025
Signed off — Alteration
PROPOSED BOILER WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01095878-S1
08/21/2025
Signed off — Alteration
PROPOSED BOILER WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01095878-I1
06/10/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/10/2025
Special inspection requirement — Heating Systems
Alexander Sheyman
06/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
06/10/2025
Special inspection requirement — Heating Systems
Alexander Sheyman
06/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
06/09/2025
Filed — Alteration
PROPOSED BOILER WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01095878-P7
06/09/2025
Filed — Alteration
PROPOSED BOILER WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01095878-P8
06/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
06/09/2025
Special inspection requirement — Heating Systems
Alexander Sheyman
06/09/2025
Special inspection requirement — Heating Systems
Alexander Sheyman
06/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
05/29/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/20/2025
Permit issued — Boiler Equipment
B01095878-S2-BE
05/20/2025
Permit issued — Boiler Equipment
B01095878-S3-BE
04/14/2025
Filed — Alteration
PROPOSED BOILER WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01095878-S3
04/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
Alexander Sheyman
04/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Alexander Sheyman
04/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
04/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
Alexander Sheyman
04/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Alexander Sheyman
04/11/2025
Special inspection requirement — Maintenance information
Alexander Sheyman
04/10/2025
Filed — Alteration
PROPOSED BOILER WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01095878-P5
04/10/2025
Filed — Alteration
PROPOSED BOILER WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01095878-P4
04/10/2025
Filed — Alteration
PROPOSED BOILER WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01095878-P2
04/09/2025
Special inspection requirement — Maintenance information
Alexander Sheyman
04/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
04/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Alexander Sheyman
04/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
Alexander Sheyman
04/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Alexander Sheyman
04/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
Alexander Sheyman
04/08/2025
Permit issued — Plumbing
B01095878-S1-PL
03/26/2025
Special inspection requirement — Energy Code Compliance Inspections
Alexander Sheyman
03/26/2025
Special inspection requirement — Mechanical Systems
Alexander Sheyman
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
03/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Alexander Sheyman
03/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
Alexander Sheyman
03/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
Alexander Sheyman
03/26/2025
Special inspection requirement — Permanent certificate
Alexander Sheyman
03/26/2025
Special inspection requirement — Maintenance information
Alexander Sheyman
03/26/2025
Special inspection requirement — Interior lighting power
Alexander Sheyman
03/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
Alexander Sheyman
03/14/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/05/2025
Filed — Alteration
PROPOSED BOILER WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01095878-P3
02/24/2025
Filed — Alteration
PROPOSED BOILER WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01095878-S2
11/27/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/25/2024
Permit issued — Plumbing
B01095878-S1-PL
10/18/2024
Filed — Alteration
PROPOSED BOILER WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01095878-S1
10/18/2024
Filed — Alteration
PROPOSED BOILER WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01095878-P1
09/13/2024
Permit issued — General Construction
B01095878-I1-GC-CX
08/19/2024
Filed — Alteration
PROPOSED BOILER WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01095878-I1
09/12/2023
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00411736-I1
10/21/2020
Permit issued — Sidewalk Shed
B00411736-I1-SH
10/13/2020
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00411736-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offCOPPER MECHANICAL INC05/20/2025
DOB NOWBoiler EquipmentSigned-offCOPPER MECHANICAL INC05/20/2025
DOB NOWPlumbingSigned-offCOPPER MECHANICAL INC04/08/2025
DOB NOWPlumbingSigned-offCOPPER MECHANICAL INC10/25/2024
DOB NOWGeneral ConstructionSigned-offGENGRIC DESIGN09/13/2024
DOB NOWSidewalk ShedSigned-offJASCO, INC10/21/2020
BISEQISSUEDSKYWORX CONTRACTING INC09/06/2013
2 projects · most recent 09/19/2024
General Wiring
FiledStatusContractorScope
09/19/2024CompleteACCURATE ELEC'L CORP.General Wiring
10/22/2020Permit IssuedRICHARD NEU—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/10/2025Pass-Final Boiler Equipment InspectionPassView ↗
05/29/2025Pass-Final Boiler Equipment InspectionPassView ↗
03/14/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/27/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
06/10/2025Heating SystemsAlexander Sheymanspecial
06/10/2025Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
06/10/2025Heating SystemsAlexander Sheymanspecial
06/10/2025Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
06/09/2025Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
06/09/2025Heating SystemsAlexander Sheymanspecial
06/09/2025Heating SystemsAlexander Sheymanspecial
06/09/2025Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
04/11/2025HVAC-R and service water heating system controlsAlexander Sheymanenergy_progress
04/11/2025Energy Code Compliance InspectionsAlexander Sheymanprogress
04/11/2025Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
04/11/2025HVAC-R and service water heating equipmentAlexander Sheymanenergy_progress
04/11/2025HVAC-R and service water piping design and insulationAlexander Sheymanenergy_progress
04/11/2025Maintenance informationAlexander Sheymanenergy_progress
04/09/2025Maintenance informationAlexander Sheymanenergy_progress
04/09/2025Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
04/09/2025Energy Code Compliance InspectionsAlexander Sheymanprogress
04/09/2025HVAC-R and service water heating system controlsAlexander Sheymanenergy_progress
04/09/2025HVAC-R and service water piping design and insulationAlexander Sheymanenergy_progress
04/09/2025HVAC-R and service water heating equipmentAlexander Sheymanenergy_progress
03/26/2025Energy Code Compliance InspectionsAlexander Sheymanprogress
03/26/2025Mechanical SystemsAlexander Sheymanspecial
03/26/2025Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
03/26/2025HVAC-R and service water piping design and insulationAlexander Sheymanenergy_progress
03/26/2025HVAC-R and service water heating equipmentAlexander Sheymanenergy_progress
Latest 25 of 39.
▾Documents — 61 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch13
08/21/2026B01095878-P5Request digital key ↗
08/21/2026B01095878-P4Request digital key ↗
08/21/2026B01095878-P3Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00411736-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
09/05/2013340083215Open ↗
▸BISWORK PERMIT APPLICATION1
09/05/2013340083215Open ↗
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/02/2026B00411736-I1Open ↗
08/21/2026B01095878-P5Open ↗
08/21/2026B01095878-P4Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026B01095878-S2Open ↗
09/23/2026B01095878-S3Open ↗
09/01/2026B01095878-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B01095878-P3Open ↗
09/01/2026B01095878-P3Open ↗
08/28/2026B01095878-P4Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/05/2013340083215Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/05/2013340083215Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/05/2013340083215Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
09/02/2026B00411736-I1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/21/2026B01095878-P4Open ↗
08/21/2026B01095878-P3Open ↗
08/21/2026B01095878-P2Open ↗
Showing 3 of 11 on file for this type
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/05/2013340083215Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
09/05/2013340083215Open ↗